L-2005-061, February 2005 Monthly Operating Report for Turkey Point Units 3 and 4

From kanterella
Jump to navigation Jump to search
February 2005 Monthly Operating Report for Turkey Point Units 3 and 4
ML050810434
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/11/2005
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-061
Download: ML050810434 (3)


Text

.- we e MAR 1 1 2005 FPL L-2005-061 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 3/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period February, 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720  :: :

Maximum Dependable Capacity (MWe-Net) 693  :-. - --:-- -;; _ - -;: ; . is _;

Month Year-to-date Cumulative No. of hours reactor was critical 672 1323 210936.7 No. of hours generator was on line (service hours) 672 1255.4 208331.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 478568 857289 136395954 I .1. ___________________

UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 had been operating at approximately 60% power from January 28", 2005 in order to clean grass from the condenser water boxes and tubes. On February 2, 2005, Unit 3 was restored to 100% power and continued to operate at essentially 100% power through the end of February.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 317/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period February, 2005 Design Electrical Rating (MWe-Net) 720 -l , - - --- _-^_ >_

Maximum Dependable Capacity (MWe-Net) 693 ---: --- - :;-- -

Month Year-to-date Cumulative No. of hours reactor was critical 672 1416 209557.2 No. of hours generator was on line (service hours) 672 1416 205057.3 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 482324 1017036 135617787 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action! Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/1-cense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of February.

Text

.- we e MAR 1 1 2005 FPL L-2005-061 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 3/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period February, 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720  :: :

Maximum Dependable Capacity (MWe-Net) 693  :-. - --:-- -;; _ - -;: ; . is _;

Month Year-to-date Cumulative No. of hours reactor was critical 672 1323 210936.7 No. of hours generator was on line (service hours) 672 1255.4 208331.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 478568 857289 136395954 I .1. ___________________

UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 had been operating at approximately 60% power from January 28", 2005 in order to clean grass from the condenser water boxes and tubes. On February 2, 2005, Unit 3 was restored to 100% power and continued to operate at essentially 100% power through the end of February.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 317/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period February, 2005 Design Electrical Rating (MWe-Net) 720 -l , - - --- _-^_ >_

Maximum Dependable Capacity (MWe-Net) 693 ---: --- - :;-- -

Month Year-to-date Cumulative No. of hours reactor was critical 672 1416 209557.2 No. of hours generator was on line (service hours) 672 1416 205057.3 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 482324 1017036 135617787 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action! Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/1-cense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of February.