February 2002 Monthly Operating Report for Turkey Point, Units 3 & 4
ML020720030
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/11/2002
From: Mcelwain J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2002-051
Download: ML020720030 (3)


Text

Text

0P I PL MAR 1 1 2002 L-2002-051 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, ohn P. McElwain Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 3/4/2002 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period February, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 672 1416 187195.8 No. of hours generator was on line (service hours) 672 1416 184864.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 476154 1014994 120158641 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% until 2/19/02, when power was reduced to 40% to perform turbine valve testing. Power was returned to 100% on 2/21/02 and remained at essentially 100%

for the rest of the month.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 3/4/2002 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period February, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 672 1416 184385.5 No. of hours generator was on line (service hours) 672 1416 179991.1 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 482732 1016567 118121578 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100%, during the month of February 2002.