Text

0FPL JAN 0 4 2002 L-2002-005 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - December 2001 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 2001 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

VWy truly yours, ohn P. McElwa $

Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 1/2/02 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period December, 2001 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720_

Maximum Dependable Capacity (MWe-Net) 693_

Month Year-to-date Cumulative No. of hours reactor was critical 744 8020 185779.8 No. of hours generator was on line (service hours) 744 7924.1 183448.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 1 58747 5526019 119143 6 47 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially at 100% during the month of December.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 1/2/02 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period December, 2001 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month i Nn nf hn.ir mnttnr WR rritirnI 744 8631.5I 182969.51 No. of hours generator was on line (service hours) 744 8623.6 178575.1 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 536337 6105262 117105011 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operatinci Experience Unit 4 operated at essentially at 100% during the month of December.