L-2005-133, May 2005 Monthly Operating Report for Turkey Point Units 3 & 4

From kanterella
Jump to navigation Jump to search
May 2005 Monthly Operating Report for Turkey Point Units 3 & 4
ML051720466
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/13/2005
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-133
Download: ML051720466 (3)


Text

-

JUN 1 3 2005 FPL L-2005-133 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - May 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the May 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

I-aq an FPL Group company

N' DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 6/2/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period May, 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 ft..R Maximum Dependable Capacity (MWe-Net) 693, Month Year-to-date Cumulative No. of hours reactor was critical 744 3530 213143.7 No. of hours generator was on line (service hours) 744 3462.4 210538.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 530494 2443436 137982101 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operatina Experience Unit 3 operated at essentially 100% power for the month of May.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 6/2/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period: May, 2005 Design Electrical Rating (MWe-Net) 720 ¢ - -M Maximum Dependable Capacity (MWe-Net) 693 ;

Month Year-to-date Cumulative No. of hours reactor was critical 0 2345.2 210486.4 No. of hours generator was on line (service hours) 0 2330.6 205971.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 0 1549244 136149995 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20050021 05/01/2005 S 744 C 1 Refueling Outage Cycle 22 Started 4/10/05 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 has been shut down for a scheduled refueling outage since April 10'h, 2005, and was down the entire month of May, 2005 for the Cycle 22 refueling outage.

Text

-

JUN 1 3 2005 FPL L-2005-133 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - May 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the May 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

I-aq an FPL Group company

N' DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 6/2/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period May, 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 ft..R Maximum Dependable Capacity (MWe-Net) 693, Month Year-to-date Cumulative No. of hours reactor was critical 744 3530 213143.7 No. of hours generator was on line (service hours) 744 3462.4 210538.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 530494 2443436 137982101 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operatina Experience Unit 3 operated at essentially 100% power for the month of May.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 6/2/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period: May, 2005 Design Electrical Rating (MWe-Net) 720 ¢ - -M Maximum Dependable Capacity (MWe-Net) 693 ;

Month Year-to-date Cumulative No. of hours reactor was critical 0 2345.2 210486.4 No. of hours generator was on line (service hours) 0 2330.6 205971.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 0 1549244 136149995 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20050021 05/01/2005 S 744 C 1 Refueling Outage Cycle 22 Started 4/10/05 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 has been shut down for a scheduled refueling outage since April 10'h, 2005, and was down the entire month of May, 2005 for the Cycle 22 refueling outage.