L-2004-080, March 2004 Monthly Operating Report for Turkey Point, Units 3 & 4

From kanterella
Jump to navigation Jump to search
March 2004 Monthly Operating Report for Turkey Point, Units 3 & 4
ML041110860
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/08/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2004-080
Download: ML041110860 (3)


Text

APR 0 8 24 0

FPL L-2004-080 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly ODerating Report - March 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the March 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terr Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

fois an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 04/05/2004 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period March 200 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693_

Month Year-to-date Cumulative No. of hours reactor was critical 744 2184 204717.2 No. of hours generator was on line (service hours) 744 2184 202324.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 537317 1579945 132384590 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2)Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operatina ExDerience Unit 3 operated at essentially 100% power for the month of March 2004.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 04/05/04 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period March. 2004 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) _ _693 Montn Year-to-date Cumulative No. of hours reactor was critical 744 2184 201603.8 No. of hours generator was on line (service hours) 744 2184 197162.4 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 536311 1580444 130102012 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of March 2004.