June 2003 Monthly Operating Report for Turkey Point, Units 3 & 4
ML032040041
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/10/2003
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2003-173
Download: ML032040041 (3)


Text

'JL1 020 0 L-2003-173 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Onerating Report - June 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the June 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly you s Terry O.Jo es Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 07/02/2003 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period June, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 ______ _____

Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 720 3576.4 198116.2 No. of hours generator was on line (service hours) 720 3534.5 195743 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 506486 2380493 127739570 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Ooeratina Experlence Unit 3 operated at essentially 100% power for the month of June 2003.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 07/02/03 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period June, 2003 Design Electrical Rating (MWe-Net) 720 WV I_ ______ ll Maximum Dependable Capacity (MWe-Net) 693 nr .

Month Year-to-date Cumulative No. of hours reactor was critical 720 4343 195705.7 No. of hours generator was on line (service hours) 720 4343 191288.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 502158 3047248 126006338 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual

- Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of June 2003.