November 2002 Monthly Operating Report for Turkey Point Units 3 & 4
ML023540397
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/12/2002
From: Mcelwain J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2002-240
Download: ML023540397 (3)


Text

DEC 1 2 2002 FPL L-2002-240 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - November 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, JnP. McEiwain Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 12/3/2002 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period November, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 1-Month No. of hours reactor was critical 7201 8016 1 193795.8 No. of hours generator was on line (service hours) 720 8016 191464.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 1 516795 5676301 124819948 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of November 2002.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 12/3/2002 COMPLETED BY: David Lafleur TELEPHONE: "(305)246-7150 Reporting Period November, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) -693 .

Month Year-to-date Cumulative No. of hours reactor was critical 720 7649.2 190618.7 No. of hours generator was on line (service hours) 720 7626.1 186201.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 516157 5318001 122423012 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of November 2002.

Text

DEC 1 2 2002 FPL L-2002-240 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - November 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, JnP. McEiwain Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 12/3/2002 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period November, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 1-Month No. of hours reactor was critical 7201 8016 1 193795.8 No. of hours generator was on line (service hours) 720 8016 191464.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 1 516795 5676301 124819948 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of November 2002.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 12/3/2002 COMPLETED BY: David Lafleur TELEPHONE: "(305)246-7150 Reporting Period November, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) -693 .

Month Year-to-date Cumulative No. of hours reactor was critical 720 7649.2 190618.7 No. of hours generator was on line (service hours) 720 7626.1 186201.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 516157 5318001 122423012 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of November 2002.