L-2004-006, December 2003 Monthly Operating Report for Turkey Point, Units 3 and 4

From kanterella
Jump to navigation Jump to search
December 2003 Monthly Operating Report for Turkey Point, Units 3 and 4
ML040210713
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/14/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-006
Download: ML040210713 (3)


Text

JAN.1 4 2004 FPL L-2004-006 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - December 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 6'.Jgnes Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 01/05/2004 COMPLETED BY: Linda Tudor TELEPHONE: ' (305) 246-6408 Reporting Period December, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 __:_.--. --- -__

Maximum Dependable Capacity (MWe-Net) 693 . .I.:_.:;;

Month Year-to-date Cumulative No. of hours reactor was critical 744 7993.8 202533.2 No. of hours generator was on line (service hours) 724.5 7932.3 200140.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 484014 5445568 130804645 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explaln) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F -Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of December 2003, except for a scheduled Turbine Valve Test and Water Box Cleaning from December 2 through December 4, which subsequently resulted in a unit reduction to Mode 2 to perform a repair to the Turbine Governor. Unit 3 returned to 100% power on December 8 and remained at essentially 100% power for the remainder of the month of December 2003.

'1' ,- ,~ I' ,,

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 01/05/04 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period December, 2003 Design Electrical Rating (MWe-Net) 720 l -- --  : - - -; -- : -- l_ e ;

Maximum Dependable Capacity (MWe-Net) 693 ___'.. ' _,.a. ; -

Month Year-to-date Cumulative No. of hours reactor was critical 744 8057.1 199419.8 No. of hours generator was on line (service hours) 744 8033.2 194978.4 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 543607 5562478 128521568 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N /A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of December 2003.

Text

JAN.1 4 2004 FPL L-2004-006 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - December 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 6'.Jgnes Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 01/05/2004 COMPLETED BY: Linda Tudor TELEPHONE: ' (305) 246-6408 Reporting Period December, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 __:_.--. --- -__

Maximum Dependable Capacity (MWe-Net) 693 . .I.:_.:;;

Month Year-to-date Cumulative No. of hours reactor was critical 744 7993.8 202533.2 No. of hours generator was on line (service hours) 724.5 7932.3 200140.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 484014 5445568 130804645 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explaln) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F -Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of December 2003, except for a scheduled Turbine Valve Test and Water Box Cleaning from December 2 through December 4, which subsequently resulted in a unit reduction to Mode 2 to perform a repair to the Turbine Governor. Unit 3 returned to 100% power on December 8 and remained at essentially 100% power for the remainder of the month of December 2003.

'1' ,- ,~ I' ,,

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 01/05/04 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period December, 2003 Design Electrical Rating (MWe-Net) 720 l -- --  : - - -; -- : -- l_ e ;

Maximum Dependable Capacity (MWe-Net) 693 ___'.. ' _,.a. ; -

Month Year-to-date Cumulative No. of hours reactor was critical 744 8057.1 199419.8 No. of hours generator was on line (service hours) 744 8033.2 194978.4 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 543607 5562478 128521568 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N /A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of December 2003.