L-2005-253, November 2005 Operating Report, Turkey Point, Units 3 and 4

From kanterella
Jump to navigation Jump to search
November 2005 Operating Report, Turkey Point, Units 3 and 4
ML053560210
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/14/2005
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2005-253
Download: ML053560210 (3)


Text

DEC 1 4 2005 FPL L-2005-253 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Ogerating Report - November 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours,

/M Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

5 -7z.-c4 an FPL Group company

O&

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 12/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period November 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) l 720 Maximum Dependable Capacity (MWe-Net) j .693 Month No. of hours reactor was critical 4 720 No. of hours generator was on line (service hours) 720 1- ,st8I Unit reserve shutdown hours 0 0 Net Electrical Energy (MWH) 1 510989 5315035 140853700 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 was returned to 100% power November 2, 2005, after having restored the 240 kV switchyard. Unit 3 operated at essentially 100% power the remainder of the month of November.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 12/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period: November. 2005 Design Electrical Rating (MWe-Net) l 720 Maximum Dependable Capacity (MWe-Net) l 693 Month

~ ~I . _ I No. of hours reactor was critical 453.2 1 No. of hours generator was on line (service hours) 433.2 5501.42 209142.72 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 285189 3699597 138300348 UNIT SHUTDOWNS No. Date Type Duration Reason .Method of Corrective Action/ Comments

- F=Forced (hours) (1) ShuttingT-S=Scheduled Do1/n (2) 20050048 1_1/01/2005 F_25.1 A 4 Unusual event declared due to loss of offsite power / loss of unit 4 startup transformer 20050048 1 1 /0Z2D205 F 261.7 A 4 Condenser tube sheet plug leaks (1)Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 was offline due to a loss of offsite power and startup transformer and condenser tube sheet plug leaks until November 12, 2005. Unit 4 was held at 30% power to adjust secondary chemistry. The unit was restored to 100%

power November 14, 2005 and operated at essentially 100% power the remainder of November.