July 2003 Monthly Operating Report for Turkey Point Units 3 & 4
ML032380644
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/12/2003
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-205
Download: ML032380644 (3)


Text

AU 1 2 23 L-2003-205 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yLrs, Terry {b. fines Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

- . s X~~~~~~~~~

an FPL Group company

A:

DOCKET NO.: 50-25 UNIT: Turkey Point Unit 3 DATE: 080412003 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period July, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) ____l720 Maximum Dependable Capacity (MWe-Net) _ 693 _

4.

Month- 4 4-No. of hours reactor was critical 744.0 No. of hours generator was on line (service hours) 744.0 4278.5 l 1 Unit reserve shutdown hours 0 01 Net Electrical Energy (MWH) 520187 2900680 128, UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) I N/A N/A N/A N/A N/A N/A /A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of July 2003.

.N DOCKET NO.: 50t251 UNIT: Turkey Point Unit 4 DATE: 08/04/03 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period July. 2003 Design Electrical Rating (MWe-Net) __ 720 Maximum Dependable Capacity (MWe-Net) _ 693 I-Month 4-No. of hours reactor was critical 1-744.0 No. of hours generator was on line (service hours) 744.0 Unit reserve shutdown hours 0 Net Electrical Energy (MWH) I 514436

.5.

I UNIT SHUTDOWNS (1) Reason (2) Method A -Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D- Regulatory Restriction 4 - Continuation E - Operator Tralning/lcense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experlence Unit 4 operated at essentially 100% power for the month of July 2003.

Text

AU 1 2 23 L-2003-205 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yLrs, Terry {b. fines Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

- . s X~~~~~~~~~

an FPL Group company

A:

DOCKET NO.: 50-25 UNIT: Turkey Point Unit 3 DATE: 080412003 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period July, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) ____l720 Maximum Dependable Capacity (MWe-Net) _ 693 _

4.

Month- 4 4-No. of hours reactor was critical 744.0 No. of hours generator was on line (service hours) 744.0 4278.5 l 1 Unit reserve shutdown hours 0 01 Net Electrical Energy (MWH) 520187 2900680 128, UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) I N/A N/A N/A N/A N/A N/A /A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of July 2003.

.N DOCKET NO.: 50t251 UNIT: Turkey Point Unit 4 DATE: 08/04/03 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period July. 2003 Design Electrical Rating (MWe-Net) __ 720 Maximum Dependable Capacity (MWe-Net) _ 693 I-Month 4-No. of hours reactor was critical 1-744.0 No. of hours generator was on line (service hours) 744.0 Unit reserve shutdown hours 0 Net Electrical Energy (MWH) I 514436

.5.

I UNIT SHUTDOWNS (1) Reason (2) Method A -Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D- Regulatory Restriction 4 - Continuation E - Operator Tralning/lcense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experlence Unit 4 operated at essentially 100% power for the month of July 2003.