SEP 1 1 L-2003-229 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operatina Report - Auaust 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company I

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 09102/2003 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period August. 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 _________________

Maximum Dependable Capacity (MWe-Net) 693 ______^._i__ -. _

Month Year-to-date Cumulative No. of hours reactor was critical 744.0 5064.8 199604.2 No. of hours enerator was on line (service hours) 744.0 5022.8 197231 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 508328 3409008 128768085 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience UNIT 3 OPERATED AT ESSENTIALLY 100% POWER FOR THE MONTH OF AUGUST 2003, EXCEPT FOR A UNIT REDUCTION OF POWER ON AUGUST 15 FOR TURBINE PLANT COOLING WATER HEAT EXCHANGER CLEANING. UNIT 3 RETURNED TO 100% POWER ON AUGUST 17 AND REMAINED AT ESSENTIALLY 100% POWER FOR THE REMAINDER OF THE MONTH OF AUGUST 2003.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 09/02/03 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period August. 2003 Design Electrical Rating (MWe-Net) 720 _ _ _-

Maximum Dependable Capacity (MWe-Net) 693 _________________

Month Year-to-date Cumulative No. of hours reactor was critical 744.0 5831 197193.7 No. of hours generator was on line (service hours) 744.0 5831 192776.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 503572 4065256 127024346 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C -Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience UNIT 4 OPERATED AT ESSENTIALLY 100% POWER FOR THE MONTH OF AUGUST 2003, EXCEPT FOR A UNIT REDUCTION OF POWER ON AUGUST 1 FOR TURBINE PLANT COOLING WATER HEAT EXCHANGER CLEANING. UNIT 4 RETURNED TO 100% POWER ON AUGUST 4 AND REMAINED AT ESSENTIALLY 100% POWER FOR THE REMAINDER OF THE MONTH OF AUGUST 2003.

Text

SEP 1 1 L-2003-229 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operatina Report - Auaust 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company I

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 09102/2003 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period August. 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 _________________

Maximum Dependable Capacity (MWe-Net) 693 ______^._i__ -. _

Month Year-to-date Cumulative No. of hours reactor was critical 744.0 5064.8 199604.2 No. of hours enerator was on line (service hours) 744.0 5022.8 197231 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 508328 3409008 128768085 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience UNIT 3 OPERATED AT ESSENTIALLY 100% POWER FOR THE MONTH OF AUGUST 2003, EXCEPT FOR A UNIT REDUCTION OF POWER ON AUGUST 15 FOR TURBINE PLANT COOLING WATER HEAT EXCHANGER CLEANING. UNIT 3 RETURNED TO 100% POWER ON AUGUST 17 AND REMAINED AT ESSENTIALLY 100% POWER FOR THE REMAINDER OF THE MONTH OF AUGUST 2003.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 09/02/03 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period August. 2003 Design Electrical Rating (MWe-Net) 720 _ _ _-

Maximum Dependable Capacity (MWe-Net) 693 _________________

Month Year-to-date Cumulative No. of hours reactor was critical 744.0 5831 197193.7 No. of hours generator was on line (service hours) 744.0 5831 192776.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 503572 4065256 127024346 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C -Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience UNIT 4 OPERATED AT ESSENTIALLY 100% POWER FOR THE MONTH OF AUGUST 2003, EXCEPT FOR A UNIT REDUCTION OF POWER ON AUGUST 1 FOR TURBINE PLANT COOLING WATER HEAT EXCHANGER CLEANING. UNIT 4 RETURNED TO 100% POWER ON AUGUST 4 AND REMAINED AT ESSENTIALLY 100% POWER FOR THE REMAINDER OF THE MONTH OF AUGUST 2003.