L-2004-165, June 2004 Monthly Operating Report for Turkey Point Units 3 and 4

From kanterella
Jump to navigation Jump to search
June 2004 Monthly Operating Report for Turkey Point Units 3 and 4
ML042030300
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/15/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-165
Download: ML042030300 (3)


Text

JUL 1 5 20n4 FPL L-2004-165 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly ODerating Report - June 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the June 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, A

cAA.6,d1 Oa)vsv 4c Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

I DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 07/14/2004 .. .

COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period June, 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 i: -

Maximum Dependable Capacity (MWe-Net) 693 __l;__r__,n.-..'

Month Year-to-date Cumulative No. of hours reactor was critical 720 4367 206900.2 No. of hours generator was on line (service hours) 647.6 4294.6 204435.1 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 427384 3012738 133817383 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20040009 6/17/2004 F 20.7 A 1 Turbine Oil Leak Repairs Required 20040012 6/26/2004 F 51.6 A 1 Turbine Control Valve Repairs Required (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operatina Experience Unit 3 operated at essentially 100% power until June 17, 2004 when the unit was reduced to about 60% power and then shut down to repair a turbine oil leak. Return to full power was delayed until June 21, 2004 due to various secondary side problems. The unit then operated at essentially 100% power until June 25, 2004, when the unit was reduced to about 60% power and then shutdown June 26,2004 for turbine control valve, stop valve, and other secondary side repairs. Unit 3 returned to 100% power on June 29, 2004.

. a lr~wS lI.~

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 07/14/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period June. 2004 Design Electrical Rating (MWe-Net) 720 - i Maximum Dependable Capacity (MWe-Net) 693 -__- - _ ___ m:*_ ____:_,x. _ .___

Month Year-to-date Cumulative No. of hours reactor was critical 720 4325.9 203745.7 No. of hours generator was on line (service hours) 720 4272.5 199250.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 500536 3002459 131524027 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summarv Of Monthlv Oneratinq Experience Unit 4 operated at essentially 100% power for the month of June.

Text

JUL 1 5 20n4 FPL L-2004-165 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly ODerating Report - June 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the June 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, A

cAA.6,d1 Oa)vsv 4c Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

I DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 07/14/2004 .. .

COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period June, 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 i: -

Maximum Dependable Capacity (MWe-Net) 693 __l;__r__,n.-..'

Month Year-to-date Cumulative No. of hours reactor was critical 720 4367 206900.2 No. of hours generator was on line (service hours) 647.6 4294.6 204435.1 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 427384 3012738 133817383 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20040009 6/17/2004 F 20.7 A 1 Turbine Oil Leak Repairs Required 20040012 6/26/2004 F 51.6 A 1 Turbine Control Valve Repairs Required (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operatina Experience Unit 3 operated at essentially 100% power until June 17, 2004 when the unit was reduced to about 60% power and then shut down to repair a turbine oil leak. Return to full power was delayed until June 21, 2004 due to various secondary side problems. The unit then operated at essentially 100% power until June 25, 2004, when the unit was reduced to about 60% power and then shutdown June 26,2004 for turbine control valve, stop valve, and other secondary side repairs. Unit 3 returned to 100% power on June 29, 2004.

. a lr~wS lI.~

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 07/14/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period June. 2004 Design Electrical Rating (MWe-Net) 720 - i Maximum Dependable Capacity (MWe-Net) 693 -__- - _ ___ m:*_ ____:_,x. _ .___

Month Year-to-date Cumulative No. of hours reactor was critical 720 4325.9 203745.7 No. of hours generator was on line (service hours) 720 4272.5 199250.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 500536 3002459 131524027 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summarv Of Monthlv Oneratinq Experience Unit 4 operated at essentially 100% power for the month of June.