L-2002-181, August 2002 Monthly Operating Report for Turkey Point Units 3 & 4

From kanterella
Jump to navigation Jump to search
August 2002 Monthly Operating Report for Turkey Point Units 3 & 4
ML022680110
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/11/2002
From: Mcelwain J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2002-181
Download: ML022680110 (3)


Text

SEP 1 1 2002 FPL L-2002-181 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: -,Turkey Point Units 3 and 4 'it. I Docket Nos. 50-250 and 50-251 Monthly Operating Report - August 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5,.and the guidance of Generic Letter 97-02, attached are the August 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, John P. McEnwain Vice President Turkey Point Plant I -.

OIH Attachments .. ,,. .

NRC Regulatory Issue Summary.2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

ýý;A

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 9/4/2002 COMPLETED BY: Olga Hanek TELEPHONE: (305) 246-6607 Reporting Period August, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744 5831 191610.8 No. of hours generator was on line (service hours) 744 5831 189279.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 511003 4127051 123270698 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% until 8/09/02, when power was reduced to 40% to perform turbine valve testing. Power was returned to 100% on 8/11/02 and remained at essentially 100%

for the rest of the month.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 9/4/2002 COMPLETED BY: Olga Hanek TELEPHONE: (305) 246-6607 Reporting Period August, 2002 Design Electrical Rating (MWe-Net) 720 ______

Maximum Dependable Capacity (MWe-Net) 693 .

Month Year-to-date Cumulative No. of hours reactor was critical 744 5464.2 188433.7 No. of hours generator was on line (service hours) 744 5455.5 184030.6 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 518176 3804680 120909691 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (2) Method (1) Reason A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% for the month of August 2002.