L-2002-031, January 2002 Monthly Operating Report for Turkey Point, Units 3 and 4

From kanterella
Jump to navigation Jump to search
January 2002 Monthly Operating Report for Turkey Point, Units 3 and 4
ML020640407
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/12/2002
From: Mcelwain J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2002-031
Download: ML020640407 (3)


Text

Text

0 V~~ES 12 FED I O?

ZUoZ FPL L-2002-031 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - January 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, JohnP.Mlwi Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 2/4/2002 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period January, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative 744 744 186523.8 No. of hours reactor was critical 744 744 184192.5 No. of hours generator was on line (service hours) 0 0 121.8 Unit reserve shutdown hours 538840 538840 11968248K Net Electrical Energy (MWH)

UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operatinci Experience Unit 3 operated at essentially 100%, during the month of January 2002.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 2/4/2002 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period January, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 I

Month - -

744 744 1 183713.5 1 I'IIl . Vl IWI.JUI  ;:*,

cIa , l . II No. of hours generator was on line (service hours) 744 744 179319.1 0 0 577.2 Unit reserve shutdown hours Net Electrical Energy (MWH) 5353383533835 117638846 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100%, during the month of January 2002.