GO2-83-665, Submits Updated Response to IE Bulletin 77-02 Re Failures of Westinghouse AR Relays W/Certain Latch Attachment or seal-in Feature.Ar Relays W/O Latch Attachments Acceptable. Relays W/Attachments Blacklisted

From kanterella
Jump to navigation Jump to search
Submits Updated Response to IE Bulletin 77-02 Re Failures of Westinghouse AR Relays W/Certain Latch Attachment or seal-in Feature.Ar Relays W/O Latch Attachments Acceptable. Relays W/Attachments Blacklisted
ML20085H638
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/03/1983
From: Carlisle C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-SSINS-6820 GO2-83-665, IEB-77-02, IEB-77-2, NUDOCS 8309120190
Download: ML20085H638 (3)


Text

. .

^5fij3 Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richtand,Washingtopgrp (509)372-5000 O

I,3;' fg. g August 3,1983 NE(;;g, ,, .

SS-14-02-S CD-83-019 ' I G02-63-665 Docket No. 50-397 Mr. John B. Martin Regional Administrator Nuclear Regulatory Commission, Region V 1450 Paria Lane, Suite 210 Walnut Creek, California 94596

Dear Mr. Martin:

Subject:

NUCLEAR PROJECT NO. 2 IE BULLETIN 77-02 References : a) IE Bulletin 77-02, transmitted by letter, R. H. Engelken to D. L. Renberger, dated September 12, 1977.

b) Letter, D. L. Renberger to R. H. Engelken, dated November 9,1977, regarding IE Bulletin 77-02.

Reference a) transmitted IE Bulletin 77-02 concerning failures of Westinghouse AR relays with a certain latch attachment or seal-in feature.

Reference b) transmitted the Nuclear Project No. 2 response by stating "The Architect / Engineer has determined that Westinghouse-type AR relays are not being used in safety-related systems and are not planned for use '

in safety-related systems." This answer, though likely accurate in 1977, was technically too restrictive. We have now determined that AR relays, without latch attachments, are used in safety-related systems at WNP-2 and have determined this to be acceptable. The actual problem identified by NRC in 1977 was the AR relays using certain latch attachments manufac-tured after mid-1973 and before Westinghouse revised the attachment model.

\\

8309120190 830803 5 DR ADOCK 05000 ,j{

. < a ,

Mr. John B. Martin Page 2 August 3,1983 The use of AR relays with any latch attachment (s) has been blacklisted from procurement and use by the Supply System. If later use of an AR relay with some seal-in feature is required, a technical evaluation will L

be made to ensure an acceptable and qualified device is used.

This response updates and supersedes the previously submitted response (reference b)).

L Program Director, WNP-2 SDC:ar cc: WS Chin - BPA ND Lewis - EFSEC JA Forrest - B&R R0 TA Mangelsdorf - BPC A. Schwencer - NRC RE Snaith- - BR R0 A. Toth - NRC Site JJ Verderber - B&R NY

- , , - - - - < , . , . - , - , - , ,w. , ., n,, ,, -- --.n..,, ,.,-, n-,,, ,

,.r. _,.,... -,.,

ATTACHMENT SUPPLY SYSTEM RESPONSE TO IE BULLETIN 77-02 STATE OF WASHINGTON )

)

COUNTY OF BENTON )

CHARLES S. CARLISLE, being first duly sworn, deposes and says: That he is the WNP-2 Program Director of the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the permit holder herein; that he is authorized to submit the foregoing on behalf of said permit holder; that he has read the foregoing and attachments listed therein and knows the contents therof; and believes the same to be true to the best of his knowledge.

DATED: (24md 3 ,1983 d

(cd/(Ls C.S. TARLISLE w

On this day personally appeared before me C.S. Carlisle to me known to be the individual who executed the foregoing instrument and acknowle6ged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this a day of (i, m a f, 1983.

/

A GA1 OY_iALLA Notqhy Public in and for the State of WasMington Residing at /%q , , jp ,

.