GO2-82-858, Submits Clarification to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. As-built Drawings Given Addl Piping & Support Checks by Contractor Field Engineers Rather than by Qa/Qc Inspectors

From kanterella
Jump to navigation Jump to search
Submits Clarification to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. As-built Drawings Given Addl Piping & Support Checks by Contractor Field Engineers Rather than by Qa/Qc Inspectors
ML20065T460
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/19/1982
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-SSINS-6820 GO2-82-858, IEB-79-14, NUDOCS 8211020529
Download: ML20065T460 (1)


Text

- -

q:

Bulletin Reply 79--14 Docket No. 50-397 4 Washington Public Power Supply System #

P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (Sd@g-5 October 19, 1982 U///:g/

G02-82-858

  1. E%isqq.

Docket No. 50-397 Mr.cR.n. H. ' Engelken, Director Office of Inspection and Enforcement Nuclear Regulatory Commission Region V 1450 Maria Lane Suite 210 Walnut Creek, California 94596

Subject:

NUCLEAR PROJECT N0. 2 IE BULLETIN 79-14

Reference:

Letter, G02-79-156, DL Renberger to RH Engelken, subject, "WPPSS Nuclear Project No. 2, IE Bulletin 79-14" dated September 7, 1979 The following clarification is submitted to the reference in regard to our response to the subject bulletin.

The reference stated in part that as-built drawings are given additional checks by contractors' QA/QC inspectors on all safety-related piping and supports, and that the process is controlled by project procedures and is monitored by the Owner's QA group who perform random surveillances.

Due to evolutionary changes in construction practices, as-built drawings are given additional checks by contractor field engineers rather than QA/QC inspectors on all safety-related piping and supports. Contractor QC inspectors do perform the in-process inspections to insure that con-struction is performed in conformance with the approved design. As i before, this process is controlled by project procedures, and is monitored by the Owner's QA group who perform random surveillances.

/9&M

.ffa . Matlock Program Director, WNP-2 RGM:CJF:cph cc: Mr. R. Auluck - NRC Mr. W. S. Chin - BPA Mr. R. Feil - NRC Site

~~

8211020529 821019 PDR ADOCK 05000397 G PDR (f