GO2-82-521, Forwards Wc Bibb Resume Per FSAR Chapter 13 Requirements

From kanterella
Jump to navigation Jump to search
Forwards Wc Bibb Resume Per FSAR Chapter 13 Requirements
ML20054G452
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/10/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GO2-82-521, NUDOCS 8206210567
Download: ML20054G452 (3)


Text

,

s

  • W$shington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 June 10, 1982 G02-82-521 SS-L-02-CDT-82-073 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Comission Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT N0. 2 RESUME OF W.C. BIBB, DIRECTOR OF POWER GENERATION Per a request by Messrs. R. Auluck and F. Allenspach of your staff, attached are sixty (60) copies of W.C. Bibb's resume. This request was made to satisfy WNP-2 FSAR Chapter 13 requirements.

Very truly yours, W

G. D. Bouchey Deputy Director, Safety and Security CDT/jca Attachment cc: F Allenspach - NRC R Auluck - NRC WS Chin - BPA R Feil - NRC Site 0 01 8206210'567 820610 PDR ADOCK 05000

., t ,,

a J j WNP-2 William C. Bibb Director Power Generation Responsible for directing plant operations at the Supply System's Hanford Generating Project, Packwood Lake Hydroelectric Project and at Nuclear Plants 1, 2 and 3. Also responsible for the Startup and Test Program at WNP-2 and the Generation Services and Plant Training Divisions. ,

Edycational Background Professional Level Experience San Jose State College 28 years in the comercial nuclear power Major: Electronics Engineering i field, including research and develop-1 ment, factory, plant construction, plant Certification: I testing and plant operation. Fifteen i years of significant management experience Professional Engineer, Nuclear i California, #1153 l General Electric Company l Foreman (1954-1956)

Reactor Operators License l Quality Control Inspector-Factory for VBWR-Vallecitos l Nuclear Plant Components (1956-1958) l Engineering Assistant-Managed R&D Senior Reactor Operators License l Test Facility for Nuclear Plant Humboldt Bay Nuclear Plant l Components (1958-1961)

Oyster Creek Nuclear Plant l Engineer-Dresden Unit I (1961-1962) l Startup Engineer-Humboldt Bay-including Senior Certification I Commercial Operation (1962-1963)

KRB Nuclear Plant-Germany i Startup Engineer-SENN Nuclear Power SENN Nuclear Plant-Italy l Plant-including Commercial Operation

] (1963-1964) l Engineer-Big Rock Point Mods (1964-1965) l Startup Engineer-KRB Nuclear Plant-l Construction Completion to Commercial I Operation (1965-1967) l Operations Supervisor and Assistant l Site Manager-0yster Creek Nuclear l Power Plant (1967-1970) l Senior Engineer-Browns Ferry Plants I (1970-1972) l Site Manager-Cooper Nuclear Station I (1972-1974) l Central Region Nuclear Service Manager-l Managed Engineering Services for l Operating Nuclear Plants (1974-1976)

I l

l (Continued-Page Two) l I

a

O

,, ' William C. Bibb *

~

. WNP-2 Director .

Power Generation Page Two Professional Level Experience l Washington Public Power Supply System g

Program Leader, Projects (1976-1977) l Manager, Startup l

(1977-1978)

Project Manager, WNP-1/4 (1978-1979)

Project Manager, WNP-2 l (1979-1981) g g

Deputy Program Director, Startup g

& Operations (1981-1982)

Director, Power Generation

(1982-Present) l l

1 1

I I

l 1

l 1

I i

l l

l l

l 1

1 I

I I

l l

l 1

1 I

l l

l i

l