NG-05-0050, Inservice Testing Interval Extension

From kanterella
Jump to navigation Jump to search
Inservice Testing Interval Extension
ML050340164
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/21/2005
From: Peifer M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-05-0050
Download: ML050340164 (1)


Text

NMC Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC January 21, 2005 NG-05-0050 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49

Subject:

Duane Arnold Energy Center Inservice Testing Interval Extension The purpose of this letter is to inform the NRC that Nuclear Management Company, LLC (NMC) will extend the current third inservice testing (IST) interval for the Duane Arnold Energy Center (DAEC), in accordance with the provisions of the ASME Code.

The Code Edition applicable to the DAEC for the third [ST interval is ASME Section Xi, 1989 Edition (with no Addenda).

The first IST interval began on February 1, 1975 and ended on January 31, 1985; the second interval ended on January 31, 1995. The third IST interval would have ended on January 31, 2005. This interval will be extended by 1 year, as permitted by IWA-2430(d), and will end on January 31, 2006. As required by IWA-2430(d), this adjustment to the third interval for the DAEC IST program will not cause the fourth interval to be altered by more than 1 year from the original pattern of intervals.

This letter contains no new commitments and no revisions to existing commitments.

ark Site Vice President, Duane Arnold Energy Center Nuclear Management Company, LLC cc:

Administrator, Region IlIl, USNRC Project Manager, Duane Arnold Energy Center, USNRC Resident Inspector, Duane Arnold Energy Center, USNRC 3277 DAEC Road

  • Palo, Iowa 52324-9785 4

+77 Telephone: 319.851.7611