NG-04-0084, January 2004 Monthly Operating Report for Duane Arnold Energy Center

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Duane Arnold Energy Center
ML040510181
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/12/2004
From: Peifer M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NG-04-0084
Download: ML040510181 (3)


Text

Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC February 12, 2004 NG-04-0084 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, ark A. Peifer

-Site-Vice~Pes-idnt,-DuaeAr-nold Energy Center CC Regional Administrator, USNRC, Region III Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

Enclosure:

OPERATING DATA REPORT

.. ,. -, :.' , t. .

, .: .1 1 '.

2'  : 1 1. , .. .., ... : ...

i -- . .

I.I - -_!

i. , ;, i, .- , - .

3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 31 9.851.7611 I.. ! Z x l.C.i. ...

i ; - .,- I'IL i.~ to i,.......

VZ February 12, 2004 Enclosure to NG-04-0084 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE February 4, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING January 2004 PERIOD: -=

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)

This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was 744.00 744.00 202,422.27 Critical
4. Number of Hours Generator On-line 744.00 744.00 198,029.52
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical Energy Generated 436,867.30 436,867.30 92,392,142.98 (MWHrs)

UNIT SHUTDOWNS Type Method Cause &

F: Forced of Corrective S: Duration Shuttin_ Action

-No. Date- -Scheduled - -(Hours) Reason1 - -Down- -- Comments -

1 Reason: 2 Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

February 12, 2004 Enclosure to NG-04-0084 Page 2 of 2 NARRATIVE

SUMMARY

The plant started the month in a down power to complete maintenance on the 'B' Reactor Feed Pump. Full power was achieved at 0439 on January 1. During the month there were three departures of less than 6%from full power operation; for load line adjustments on January 1 and 2 and for feedwater flow transmitter calibration on January 6.

Text

Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC February 12, 2004 NG-04-0084 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, ark A. Peifer

-Site-Vice~Pes-idnt,-DuaeAr-nold Energy Center CC Regional Administrator, USNRC, Region III Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

Enclosure:

OPERATING DATA REPORT

.. ,. -, :.' , t. .

, .: .1 1 '.

2'  : 1 1. , .. .., ... : ...

i -- . .

I.I - -_!

i. , ;, i, .- , - .

3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 31 9.851.7611 I.. ! Z x l.C.i. ...

i ; - .,- I'IL i.~ to i,.......

VZ February 12, 2004 Enclosure to NG-04-0084 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE February 4, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING January 2004 PERIOD: -=

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)

This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was 744.00 744.00 202,422.27 Critical
4. Number of Hours Generator On-line 744.00 744.00 198,029.52
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical Energy Generated 436,867.30 436,867.30 92,392,142.98 (MWHrs)

UNIT SHUTDOWNS Type Method Cause &

F: Forced of Corrective S: Duration Shuttin_ Action

-No. Date- -Scheduled - -(Hours) Reason1 - -Down- -- Comments -

1 Reason: 2 Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

February 12, 2004 Enclosure to NG-04-0084 Page 2 of 2 NARRATIVE

SUMMARY

The plant started the month in a down power to complete maintenance on the 'B' Reactor Feed Pump. Full power was achieved at 0439 on January 1. During the month there were three departures of less than 6%from full power operation; for load line adjustments on January 1 and 2 and for feedwater flow transmitter calibration on January 6.