License DPR-49 Relief Request NDE-R001 Revision 1 NDE-R028 Revision 2, NDE-R044 and NDE-R045
ML021070498
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/29/2002
From: Putnam K
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-02-0268, RG-1.147
Download: ML021070498 (58)


Text

{{#Wiki_filter:NMC " Committed to Nuclear Excellence DAEC Plant SuDport Center Operated by Nuclear Management Company, LLC March 29, 2002 NG-02-0268 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station 0-P 1-17 Washington, DC 20555-0001

Subject:

Duane Arnold Energy Center Docket No: 50-331 Op. License No: DPR-49 Relief Requests NDE-ROO1 Revision 1, NDE-R028 Revision 2, NDE-R044 and NDE-R045

Reference:

1. Letter dated October 18, 1999, from NRC to E. Protsch (IES Utilities Inc.), Safety Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for Relief for Duane Arnold Energy Center
2. Letter dated March 7, 2001, from NRC to G. Van Middlesworth (NMC),

Safety Evaluation of Relief Request NDE-R028, Revision 1 File: A-100, A-286 By letter dated October 18, 1999 (Reference 1) the NRC approved several Duane Arnold Energy Center (DAEC) Inservice Inspection (ISI) Program relief requests, including NDE-ROO 1. NDE ROO provided relief from performing examination of essentially 100% of the weld length for certain reactor vessel welds. Based upon examination coverage obtained during examinations performed in Spring of 2001 during Refueling Outage (RFO) 17, NDE-ROO1 requires revision. NDE-ROO1, Revision 1 is provided in Attachment 1. NDE-ROO was also revised to refer to Revision 12 of Regulatory Guide 1.147 rather than Revision 11. Relief Request NDE-R028, Revision 1 was approved by letter dated March 7, 2001 (Reference

2) and allows relief from performing 100% examinations of nozzle-to-vessel welds. This relief has been revised to incorporate additional welds examined during RFO 17. As discussed in NDE-R028, Revision 2 (Attachment 1), the configurations of the nozzle-to-vessel welds do not allow 100% examination.

In addition, Nuclear Management Company, LLC (NMC), has identified the need for two new relief requests as a result of examinations performed during RFO 17. Relief Requests NDE R044 and NDE-R045 (Attachment 1) involve welds located off of the Recirculation Pump Suction Piping and the Scram Discharge Piping, respectively. Configuration limits the examination coverage that can be obtained for both of these welds. Additional coverage would require radiography (which would require the draining of systems which would result in increased radiation exposure, while providing only a small potential of increasing plant safety margins). Additional information concerning the four relief requests is provided in Attachment 2. 3313 DAEC Road 0 Palo, Iowa 52324-9646 Telephone: 319.851.7611

March 29, 2002 NG-02-0268 Page 2 Pursuant to the provisions of 10CFR50.55a, NMC requests approval of Relief Requests NDE R00 1 Revision 1, NDE-R028 Revision 2, NDE-R044 and NDE-R045 prior to February 1, 2003 to support planning for the DAEC's Spring 2003 Refueling Outage. Should you have any questions regarding this matter, please contact this office. Sinc ly,/ll kenneth S. Putnam Manager, Licensing : NDE-ROO1 Revision 1, NDE-R028 Revision 2, NDE-R044 and NDE-R045 : Supporting Information cc: G. Park (w/a) C. Rushworth (w/a) G. VanMiddlesworth (w/o) B. Mozafari (NRC-NRR) (w/a) D. Hood (NRC-NRR) (w/a) J. Dyer (Region III) (w/a) NRC Resident Office (w/a) Docu (w/a)

Attachment 1 NG-02-0268 Page 1 of 10 RELIEF REQUEST NUMBER: NDE-ROO1 Rev. 1 COMPONENT IDENTIFICATION Code Class: 1

References:

IWB-2500 Table IWB-2500-1 Examination Category: B-A Item Number: B1.11, B31.22, B1.30, B31.40

== Description:== Circumferential Weld (Vessel) Meridional Weld (Bottom Head) Shell to Flange Weld Head to Flange Weld Component Numbers: VCB-B004, HMA-B002, VCB-C005, and HCC-COO1 CODE REQUIREMENT Section XI (1989 Edition), Table IWB-2500-1 Category B-A, Item B1.11, B31.22, B1.30, and B 1.40 require a volumetric examination of applicable Class 1 pressure retaining welds, which includes essentially 100% of weld length once during the ten-year interval. Code Case N-460 and 10CFR 50.55 permit a reduction in examination coverage of Class 1 reactor vessel welds provided the coverage reduction is less than 10%. The Duane Arnold Energy Center (DAEC) has adopted Code Case N-460 in the Inservice Inspection (ISI) Program Plan, as permitted by USNRC Regulatory Guide 1.147, Revision 12. Relief is requested from performing essentially 100% of the weld length for reactor vessel welds VCB-B004, HMA-B3002, VCB-C005, and HCC-COOl. BASIS FOR RELIEF The DAEC plant design was completed and a license to operate was requested in 1971. The reactor vessel was designed and installed to ASME Section III, 1965 Edition, 1967 Addenda. The parameters for accessibility for Inservice Inspection were not requirements at that time and therefore not necessarily factored into component and system configurations, thereby creating conditions where ASME Section XI Code required examination coverage of reactor vessel welds can not be obtained. During refueling outage (RFO) 14, the DAEC performed the augmented weld examination of the reactor vessel using the General Electric GERIS 2000 ultrasonic examination system. The extent of examination coverage is outlined in the following table. The amount of coverage which will be obtainable when the third ten-year interval examinations are performed was based on the percentages obtained during RFO 14. Relief is therefore requested for the third ten-year interval for the four welds for which less than 90% coverage will be obtainable - VCB3-B004, HMA B002, VCB-C005, and HCC-COO1.

Attachment 1 NG-02-0268 Page 2 of 10 REACTOR VESSEL WELD LIMITED EXAMINATION TABLE ASME Item Weld Description Weld ID Accessible Comments No. Exam Coverage B11.11 Circumferential weld VCB-B1 96.5% B1. 11 Circumferential weld VCB-A2 96.7% B 1.I1 Circumferential weld VCB-B3 96.7% BI. I. Circumferential weld VCB-B4 86.91% B13.12 Longitudinal Welds VLA-AOO1 96.6% B1.12 Longitudinal Welds VLA-A002 96.7% BI.12 Longitudinal Welds VLB-A001 95.4% B1I.12 Longitudinal Welds VLB-A002 95.8% B1.12 Longitudinal Welds VLC-B001 93.8% B1.12 Longitudinal Welds VLC-B002 93.4% B1.12 Longitudinal Welds VLD-B001 96.7% B1.12 Longitudinal Welds VLD-B002 96.7% B 1.21 Circ Weld (Bott Hd) HCA-B001 100% B1.22 Meridional Welds HMA-B002 80.3% (Bottom Head) B1.30 Shell to Flange Welds VCB-C005 42.7% (one side) B 1.40 Head to Flange Welds HCC-COO 1 70.54% (one side) B1.51 Repair Welds (Beltline (VLA-A002) 96.9% Right side of weld, 31" X Region) 118 RI 38" area, Y=119" to 150" VCB-B004 This is the Course 3 to Course 4 circumferential weld. The vessel stabilizers and an insulation support ring are located at the location and limit the examination to 86.91%. The insulation support ring is located 18" from the weld. The bottom of the stabilizer brackets are located on the weld. In order to perform the additional 13.09% of the weld, the stabilizers would require removal. Removing the vessel stabilizers is not a feasible option. HMA-B002 This weld is located at the vessel skirt. There is a portion of the weld above and below the vessel skirt. Therefore the vessel skirt limits the examination coverage to approximately 80.3%. In order to perform the additional 19.7% of the weld, the vessel skirt would require removal and then reinstallation. This is not a feasible option. VCB-C005 This is the Vessel to Flange weld. This weld is examined from the flange surface and the vessel wall. The examination is limited to approximately 42.7% due to the configuration of the weld. There is no feasible option in order to examine the additional 57.3%.

Attachment 1 NG-02-0268 Page 3 of 10 HCC-CO01 This is the Head to Flange weld. This weld was examined from the head surface and is limited due to the configuration of the weld. There is no feasible option in order to examine the additional 29.46%. A third of this weld was examined in RFO14 (1st period) with a weld coverage of 36.8%. The second third was examined in RFO17 ( 2 nd period) with a weld coverage of 70.54%. The third that was examined in RFO14 will be re-examined to obtain the 70.54% in the 3 rd period. ALTERNATE EXAMINATION Pursuant to 10CFR50.55a(a)(3)(ii), the DAEC proposes to examine, once during the ten year interval, the applicable pressure retaining reactor vessel welds to the maximum extent practical within the limitations of the examination technique or design of the component. The welds and approximate coverage are: VCB-B004 86.91% HMA-B002 80.3% VCB-C005 42.7% HCC-C001 70.54% The inaccessible portions of the reactor vessel welds will continue to be subject to the applicable system pressure test requirements of IWA and IWB-5000 with a VT-2 visual examination. APPLICABLE TIME PERIOD Relief is requested for the third ten-year interval of the Inservice Inspection Program for DAEC.

Attachment 1 NG-02-0268 Page 4 of 10 RELIEF REQUEST NUMBER: NDE-R001 SKETCH Reactor vessel HCC-B2 DOLLAR PUlTqE IICC-CI to FLANGE NOPHEAD CLOSURE SENCLOSURE 11 FLANGE REGION VC B-C5 to SHELL FLANGE UP*PER SHELL I VCB-B14 S* REPAIR WELD -REPAIR WELD (129-L)- ) UPPER I INTERMEDIATE REPAIR WELD SHELL LOWER 1 -20 INTEIMIDIATE 1-21 0436 -2 SIHELL (BO673-1) CORE RELTLINE OGTANL> REGION I CI RCUMFERENTIAL GIRTH WELD (90 REPAIR WELD (II -RI) 1-19 REPAIR WELD , LOWER SHELL (04021) (118-RI) NI

                                           \1    1-18                                                  ,CB SCHEMATIC OF THE RPV SHOWING ARRANGEMENT OF VESSEL PLATES AND WELDS

Attachment 1 NG-02-0268 Page 5 of 10 RELIEF REQUEST NUMBER: NDE-R028 (Rev. 2) COMPONENT IDENTIFICATION Code Class: 1

References:

IWB-2500 Table IWB-2500-1 Examination Category: B-D Item Number: B3.90

== Description:== Nozzle-to-Vessel Welds Component Numbers: See "List of Nozzle-to-Vessel Welds" for Component Identification CODE REQUIREMENT Section XI (1989 Edition), Table IWB-2500-1 Category B-D, Item B3.90, requires a volumetric examination, which includes essentially 100% of the weld, once during the ten year interval. The examination volume is defined in Figure IWB-2500-7(b). Code Case N-460 permits a reduction in examination coverage of Class 1 welds provided the coverage reduction is less than 10%. The Duane Arnold Energy Center (DAEC) has adopted Code Case N-460 in the Inservice Inspection (ISI) Program Plan, as permitted by USNRC Regulatory Guide 1.147, Revision 12. Relief is requested from performing essentially 100% of the weld length for those welds identified in the "List of Nozzle-to-Vessel Welds." BASIS FOR RELIEF Due to the design of these welds it is not feasible to effectively perform a volumetric examination of 100% of the volume as described in IWB-2500-7(b). The nozzle-to-vessel welds are accessible from the vessel side, but examination cannot be performed from the nozzle side because of the forging curvature. In addition to component configuration certain nozzle-to vessel weld examinations are further limited by reactor pressure vessel (RPV) design obstructions (such as RPV appurtenances). In accordance with 10CFR50.55a(g)(6)(i) relief requests may be granted when the examination requirements are shown to be impractical. ALTERNATE EXAMINATION The DAEC proposes to perform volumetric examination from the vessel side of the nozzle-to vessel welds identified in the "List of Nozzle-to-Vessel Welds." Because of the design of these welds, there are no alternative examination techniques currently available to increase the examination volume.

Attachment 1 NG-02-0268 Page 6 of 10 List of Nozzle-to-Vessel Welds Nozzle ID Period Examined Code Coverage* Remarks CRA-DOO1 1 61.3% Control Rod Drive CSA-D001 1 63% Core Spray CSB-DOO1 1 66% Core Spray FWA-D001 1 56.5% Feedwater HVA-DOO1 1 66.0% Head Vent HSB-DO01 2 70.9% Head Spare JPA-DO01 1 61.1% Jet Pump MSA-DO01 1 59.6% Main Steam MSB-DO01 2 63% Main Steam RHA-DO01 1 65.7% Head Spray RCA-DOG1 2 59% Recirculation Suction RCB-DOO1 1 57% Recirculation Suction RRA-DO01 1 63% Recirculation Inlet RRB-DO01 1 63% Recirculation Inlet RRC-DO01 1 63% Recirculation Inlet RRD-DO01 1 51.4% Recirculation Inlet RRE-DOO1 1 64% Recirculation Inlet RRF-DO01 2 73.36% Recirculation Inlet RRH-DOO1 1 64% Recirculation Inlet VIA-DO01 2 86.2% Vessel Instrumentation VIC-DO01 2 86.2% Vessel Instrumentation VID-DO01 2 63% Vessel Instrumentation VIE-DOG1 1 66% Vessel Instrumentation VIF-DO00 2 86.2% Vessel Instrumentation

  • Due to the nozzle design it is not feasible to effectively exam 100% of the required code volume as defined in Figure IWB-2500-7(b).

APPLICABLE TIME PERIOD Relief is requested for the third ten-year interval of the Inservice Inspection Program for DAEC.

Attachment 1 NG-02-0268 Page 7 of 10 RELIEF REQUEST NUMBER: NDE-R044 COMPONENT IDENTIFICATION Code Classes: 1

References:

IWA-2500, Table IWB-2500-1 Examination Categories: B-J Item Numbers: B9.11

== Description:== All pressure retaining welds Component Numbers: RCB-J030 Recirculation System Weld CODE REQUIREMENT Section XI (1989 Edition), Table IWB-2500-1 Category B-J, Item B9.1 1 requires a volumetric and surface examination which includes essentially 100% of weld length once during the ten year interval. Relief is requested from performing essentially 100% of the weld length for Recirculation System Weld RCB-J030. BASIS FOR RELIEF Per Table IWB 2500-1, applicable Class 1 pressure retaining welds are required to be volumetrically and/or surface examined, essentially 100% of the weld, once every ten years. DAEC has adopted Code Case N-460 in the ISI Program Plan, as permitted by USNRC Regulatory Guide 1.147, Revision 12. Code Case N-460 permits a reduction in examination coverage of Class 1 welds provided that the coverage reduction is less than 10%. This weld is a branch connection configuration (weld-o-let onto the 22" Recirculation Piping) and located off the Recirculation Pump Suction Piping. The configuration limits the examination from one side (weld-o-let side). This results in approximately 38% code required coverage of the weld volume. Supplemental angles (60RL and 35S) were used to increase the coverage to 38%. In order to perform a radiography of the weld, draining the Recirculation System would be required, which would result in an increase in exposure to personnel by a factor of 1.7 (150 mr/hr vs. 255 mr/hr) for a total of 1.02 Rem for the additional 62% coverage. The benefit of examining the additional 62% weld volume has only a small potential of increasing plant safety margins and a very disproportionate impact on expenditures of plant manpower and radiation exposure.

Attachment 1 NG-02-0268 Page 8 of 10 ALTERNATE EXAMINATION As an alternative to existing Section XI requirements per 10CFR 50.55a(a)(3)(i), DAEC proposes to perform volumetric examination of 38% of the weld volume. DAEC will examine applicable pressure retaining piping welds to the maximum extent practical within the limitations of the examination technique or design of the component. Should reportable indications be found in the accessible portions of the listed weld, an engineering evaluation will be performed to determine if the inaccessible portion of the weld would be affected. Subsequent to examination of an affected weld, NDE data sheets will describe in detail, the extent of the limitation and any alternative examination techniques used to obtain coverage. The inaccessible portions of the weld will continue to be subject to the applicable system pressure test requirements of IWA, and IWB-5000 with a VT-2, visual examination. APPLICABLE TIME PERIOD Relief is requested for the third ten-year interval of the Inservice Inspection Program for DAEC. This weld was included in the RFO 17 Outage Summary Report.

Attachment 1 NG-02-0268 Page 9 of 10 RELIEF REQUEST NUMBER: NDE-R045 COMPONENT IDENTIFICATION Code Classes: 2

References:

IWA-2500, Table IWC-2500-1 Examination Categories: C-F-2 Item Numbers: C5.51

== Description:== All pressure retaining welds Component Numbers: SDN-CF010, Scram Discharge Weld CODE REQUIREMENT Section XI (1989 Edition), Table IWC-2500-1 Category C-F-2, Item C5.51 requires a volumetric and surface examination which includes essentially 100% of weld length once during the ten year interval. Relief is requested from performing essentially 100% of the weld length for Scram Discharge Weld SDN-CFO10. BASIS FOR RELIEF Per Table IWC 2500-1, applicable Class 2 pressure retaining welds are required to be volumetrically and/or surface examined, essentially 100% of the weld, once every ten years. DAEC has adopted Code Case N-460 in the ISI Program Plan, as permitted by USNRC Regulatory Guide 1.147, Revision 12. Code Case N-460 permits a reduction in examination coverage of Class 1 welds provided that the coverage reduction is less than 10%. This weld is a pipe to cap configuration and located off the Scram Discharge Piping. The configuration limits the examination to approximately 84.36% of the code required coverage of the weld volume. In order to perform a radiography of the weld, draining the Scram Discharge piping would be required, which would result in an increase in exposure to personnel by a factor of 1.7 (5 mr/hr vs. 8.5 mr/hr) for a total of 232 mr for the additional 15.64% coverage. The benefit of examining the additional 15.64% weld volume has only a small potential of increasing plant safety margins and a very disproportionate impact on expenditures of plant manpower and radiation exposure.

Attachment 1 NG-02-0268 Page 10 of 10 ALTERNATE EXAMINATION As an alternative to existing Section XI requirements per 10CFR 50.55a(a)(3)(i), DAEC proposes to perform volumetric examination of 84.36% of the weld volume. DAEC will examine applicable pressure retaining piping welds to the maximum extent practical within the limitations of the examination technique or design of the component. Should reportable indications be found in the accessible portions of the listed weld, an engineering evaluation will be performed to determine if the inaccessible portion of the weld would be affected. Subsequent to examination of an affected weld, NDE data sheets will describe in detail, the extent of the limitation and any alternative examination techniques used to obtain coverage. The inaccessible portions of the weld will continue to be subject to the applicable system pressure test requirements of IWA, and IWB-5000 with a VT-2, visual examination. APPLICABLE TIME PERIOD Relief is requested for the third ten-year interval of the Inservice Inspection Program for DAEC. This weld was included in the RFO17 Outage Summary Report.

Attachment 2 NG-02-0268 Supporting Information

ULI*ARA NK LAAMINAI1IJN UAI A MI--I (MANUAL PIPING) Site. DUANE ARNOLD Report No.: 101094 Calibration Sheet No.: C-022 Data Sheet No.: NIA ACP 1211.30 Revision: 0 Procedure No.: Exam Surface Temp: 78 oF Couplant: HUMEX Exam Start: 1340 System: RPV Batch No. 00165 Exam End: 1355 Weld ID: HCC-COOI Thermometer SiN: 3473 Material Type: CS U SS E3 Other: N/A Search Unit 0° / L Examination Surface: ID o] OD RPV 00 Axial Scan Sensitivity (dB) 49.0 Lo

Reference:

WELD CENTERLINE Circ Scan Sensitivity (dB)_49.0 Wo

Reference:

Wo

Reference:

Indli-ýtrhfnial -r I4 Component yes NO 140 ITe e5 FLANGE 1 With Flow LIo Axial: 2 Against Flow Weld F [] L LI Centerline 0 Circ 3 Upstream w CW: j 4 Downstream L1 LI E) L1 Q LI Circ 5 Upstream Q LI RPV TOP HEAD LI LI Component CCW

  • 6 Downstream U LI L3 7 L-Wave Base Metal 8 Other CRV Remarks: No Recordable Indications.

Examined Flange to Head weld from stud hole 20 thru 40. Previous data was reviewed with no significant changes. Examiner Level Date Leeltevi 1 ate ANII Review Date

                                             "_7 iý_7J                  -k                                             Page I   Of 67

UL ! KAbUNlI LAAMINATIUN DATI A SHEI (MANUAL PIPING) Report No.: 101094 Site: DUANE ARNOLD Calibration Sheet No.: C-023 Data Sheet No.: N/A Procedure No.: ACP 1211.30 Revision: 0 System:_RPV Exam Surface Temnp: 7 F Couplant:_HUMEX Exam Start: 1357 Weld ID: HCC-COO1 Thermometer S/N: 3473 Batch No. 00165 Exam End: 1421 Search Unit 45' / SHR Examination Surface: ID 03 c OD Material Type: CS l] SS L] Other: N/A Lo

Reference:

RPV 0° Axial Scan Sensitivity (dB)_52.2 WELD ENTELINE52.2 Wo

Reference:

WELD CENTERLINE Circ Scan Sensitivity (dB),_52.2 Performed Indications Yes NO Yes NO Component FLANGE I With Flow Axial: -7 Aj 2 Against Flow Weld F Circ 3 Upstream [ 3 E a Centerline O CW: 4 Downstream [ Q Q N W Circ 5 Upstream [] Li U RPV TOP HEAD S6 Downstream El Component 7 L-Wave Base Metal l a 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-2 W- W-2 b5W-1 bW- SW-2 Amp (1-8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Examined Flange to Head weld from stud bole 20 thru 40. Previous data was reviewed with no significant changes. Examiner Level Date jLeve eviw /at6 ANlI Review Date 1 NU-143L Rev.

ULITASONIC; EXAMINATION DATA 5HEE-T (MANUAL PIPING) Site: DUANE ARNOLD Report No.: 101094 Calibration Sheet No.: C-024 Data Sheet No.- N/A Procedure No.: ACP 1211.30 Revision: 0 Exam Surface Temp: _78 F Couplant: HUMEX Exam Start: 1423 System: RPV Thermometer S/N: 3473 Batch No. 00165 Exam End: 1447 Weld ID: HCC-C001 Examination Surface: ID !iOD m Material Type: CS a SS E] Other: N/A Search Unit 600/SHR Lo

Reference:

RPV 0 Axial Scan Sensitivity (dB) 57.0 Circ Scan Sensitivity (dB) 57.0 Wo

Reference:

WELD CENTERLINE Performed Indications Yes NO Yes NO Component 1 With Flow LI a[] ' ,

        -7 Axial: Axal:       2 Against Flow                 [                                       Weld                                 F L

Circ 3 Upstream W El [] C9 Centerline 0 cw: -7j__ 4 Downstream I@ l !l @ W W Circ 5 Upstream El [W S6 Downstream E1 Q a Component 7 L-Wave Base Metal 8 Other N/A Indication L (in) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 'L- L-2 W-2 W- W-2 -SW-16SW- SW-2 Amp (1 -8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Examined Flange to Head weld from stud hole 20 thru 40. Previous data was reviewed with no significant changes. Examiner Level Date Leve JJU.evieA,/A , ate ANII Review Date 1 NU-1437 Rev.

ULTRASONIC EXAMINATION DATA 5HEET (MANUAL PIPING) Report No.:-101093 Site: DUANE ARNOLD Calibration Sheet No.: C-025 Data Sheet No.: N/A Procedure No.: ACP 1211.30 Revision: 0 System:_ RPV Exam Surface Temp:_78 °F Couplant:_HUMEX Exam Start: 1449 Thermometer S/N: 3473 Batch No. 00165 Exam End: 1510 Weld ID: HCC-C001 Examination Surface: ID [ OD Material Type: CS 0 SS E] Other: N/A Search Unit 700 / SHR Lo

Reference:

RPV 00 Axial Scan Sensitivity (dB) 67.0 Wo

Reference:

WELD CENTERLINE Circ Scan Sensitivity (dB) 67.0 Performed Indications Yes NO Yes No Component I With Flow ] [ [ ] FLANGE Axial: 2 Against Flow Weld F Circ 3 Upstream 09 El El a Centerline 0 CW: 4 Downstream 09 [] El a W Circ 5 Upstream [ E3 El [] RPV TOP HEAD C-- 6 Downstream El El a Component 7 L-Wave Base Metal a 3 E 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L1 L- L-2 W-2 W- W-2 -SW-1SW- VW-2 Amp (1 -8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Examined Flange to Head weld from stud hole 20 thru 40. Examiner Level Date Lev Revi Date ANII Review Date 1 NG-143Z Rev.

_____SITE: Ug .-- UNIT:__ REPORT NO.: NMC~ COVERAGE PLOT SHEET PRJC:4O.LJ/9' SSE: k COMPONENT ED) NO:~~- -- CONFIGURATION: P ________FLOW L.: li 9.

                                                                   -   ~           F 1 ,-99 VA-L     0 VAD~

V,4~'s'

                                                                      - Z y.e         .          -                         Žyts        3.5.Vts.4 31Z.Z.7-7       7- 53 1/

ZZ 7.s n qcj OVAL) -Lg 7-7 7-~ 3 AI 31A..Z.7*7 3/4O. '/s L, _____fr Z/ ,(:z I V 34 Zc., - # 'U- I2,l-h, 34'4'O '9 A, C,1.l V VP)& 2' 1.)e ~ 60 AL) 31.2C1, 3$z i

                                            '.37's-'

q'i4 qs- 6l 2- 1 IS 1,74 ~9

                                                                                      *cj c                                                't-      u4
                                                                                            . ,        'do                                     jI   .11 Z  30,q                2  q~'q0<,1-                                         IJ.'7 EXAMINER                            LEVEL      DATE               IIIP                                       0EVEL              G           ~       F

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) St:DUANE ARNOLD Report No.:. 10080 C01 Site: ~Calibration Sheet No.: -8 Data Sheet No.: N/A Revision: 0 Procedure No.: ACP 1211.30 System: RPV Exam Surface Temp: 77 F Couplant:__HUMEX Exam Start: 1014 Weld ID: HSB-D00I-N68-DI Thermometer S/N: 3473 Batch No- 00165 Exam End: 103_ SS El Other: N/A Examination Surface: ID C] OD @ Material Type: CS 0 Search Unit 00 / L Axial Scan Sensitivity (dB) 49.0 LoTOP OF NOZZLE WELD CENTERLINE 49.0 Circ Scan Sensitivity (dB)_49.0 Wo

Reference:

Performed Indications Yes No Yes No Component

  • NOZZLE 1I"Wth Flow [ ] Il Axial: 2 ginth Flow L Weld F 2 Against Flow l ------.-------- L Circ r 3 Upstream El 0 Centerline 0 W

CW: t. 4 Downstream 0j 0 5 Upstream Q El RPV TOP HEAD Circ CcW I 6 Downstream Qj [ j E Component 7 L-Wave Base Metal Q a [ 8 Other CRV Li Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-1 W- W-2 SW-1 SW- SW-2 Amp (1 - 8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Previous data was reviewed with no significant changes. Examiner Level Date Zl Lev, eev w ,fate ANII Review Date Rev. 3 NG-143Z

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) St:DUANE ARNOLD Report No.: 101080 C09 SCalibration Sheet No.: -1 Data Sheet No.: N/A Revision: 0 Procedure No.: ACP 1211.30 F Couplant: HUMEX Exam Start: 1300 System: RPV Exam Surface Temp: 72 Batch No. 00165 Exam End: 1318 Weld 10: HSB-D001-N6B-D1 Thermometer S/N: 3473 L OD W Material Type: CS W SS 0 Other: N/A Search Unit 450 / S Examination Surface: ID TrOP OF NOZZLE 4. Lo

Reference:

_________ ____Axial Scan Sensitivity (dB)_46.2 Circ Scan Sensitivity (dB) 46.2 Wo

Reference:

WELD CENTERLINE Performed Indications Yes No Yes No Component FLANGE 1 With Flow Q U 1 Axial: 2 s Weld F 2 Against Flow 0 a ------ ------------ L Circ r 3 Upstream [ U U 1 Centerline 0 CW: [ 4 Downstream I U U I W Circ " 5 Upstream 1 U U I RPV TOP HEAD CCw t 6 Downstream U Fl U a Component 7 L-Wave Base Metal 0 a El U 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-1 W- W-2 SW-1 SW- SW-2 Amp (1 - 8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Previous data was reviewed with no significant changes. Examiner Level Date Le IUe /w()ý Date ANIII Review Date V Page 2, of 1v NG-143Z Rev. 3

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) St:DUANE ARNOLD Report No.:, I01080O -2 Calibration Sheet No.: -0 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.: RV72 HUMEX 12 F Couplant: _____ Exam Start: 1322 System:_RPV Exam Surface Temp: 7 Weld ID: N6BD1 Thermometer SIN: 3473 Batch No. 00165 Exam End: 1341 Examination Surface: ID Q3 OD

  • Material Type: CS U1 SS El Other: N/A Search Unit 600 / S
                 'T'OP OF NOZZLE                                                    Axial Scan Sensitivity {dB)_51._0 Lo 

Reference:

WELD ENTELINE51.0 Circ Scan Sensitivity (dB)_51.0 Wo

Reference:

WELD CENTERLINE Performed Indications Yes No Yes No Component FLANGE 1 With Flow 0 El 0 0 Axial: 2. Weld F S 2 AgainstFlow --- - ------- L Circ r 3 Upstream El [ U Centerline 0 CW: 4 Downstream U 10 El a Circ " 5 Upstream ] El 0i a RPV TOP HEAD 6 Downstream U El El a Component 7 L-Wave Base Metal El [ El El 8 Other N/A Othrl E*l 0 El Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L- L- L-2 W-1 W- W-2 SW-1 SW- SW-2 Amp (1 - 8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Previous data was reviewed with no significant changes. Examiner Level Date Lev ate ANII Review Date Page -of NG-143Z Rev. 3

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) St:DUANE ARNOLD Report No.: 101080 C02 Calibration Sheet No.:C-2 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.: RPV 72 HUMEX 14 _ _ Exam Surface Temp: VF Couplant: _____ Exam Start: 1342 System: _ Weld ID: HSB-D00]-N6B-D_ Thermometer S/N: 3473 Batch No. 00165 Exam End: 1357 Search Unit 70__/_S Examination Surface: ID 0 OD 1 Material Type: CS C9 SS Li Other: N/A Lo

Reference:

TOP OF NOZZLE Axial Scan Sensitivity (dB)_67_0 WELD ENTELINE67.0 Wo

Reference:

WELD CENTERLINE Circ Scan Sensitivity (dB)_67-0 Performed Indications Yes No Yes No Component FLANGE S 1 With Flow 0 0 - a Axial: 2 Against Flow 2 [ [] ] []L Weld F Circ r 3 Upstream 0 [ 0 Centerline 0 CW: 4 Downstream a E [ Circ " 5 Upstream [ RPV TOP HEAD CCW t 6 Downstream U [] [] [ Component 7 L-Wave Base Metal Il 1 L] L 8 Other N/A Indication L (in) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-1 W- W-2 SW-1 SW- SW-2 Amp (1 - 8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Examiner Level Date L 1,111 Review) Date AN.I Review Date

                                                                             -/                               Page          of NG-143Z Rev. 3

COERGEPOTS~T SITE: c UNIT: A ~ REPORT NO.: Committd toAvarExwcohfj RJC:V 1~o/1 M "M PROECT 4194,400 SYSTEM;IT62 4~Lt'I COPOEN COMONETE NO 79NO " 3Ad~- bio7 bi CONFIGURATION: S #4EIL _ - FLOW

  • po oozlT-fnijos"3 '- 257.2 VAu- 17.31
                                                                                                                                               '             6. '13Z 2

VA U - 1 ',$=1.f.t VAD 70TAl 7 -yV7, 12 "VAD- .+/-c L.-7d.6 V1

2. 6t, 7.,V,7 "v4 0ý-

v4.. vf 1 *6 vAn. *r(1 f '/ I~V)C*Z.ZJ iq.Z

                 %/At 7 7. ,              / 2.'3                                                                                Vie
                   .Am                . -.      -    -

vw - '7Zj '71,341 6-724,62_. Y7 6 cto0 l) EE40- 1:ytl 7 ID voPAGE S~OFL [I

SITE: .4.M UNIT: I- REPORT NO.; Commte to Nud -,Ewahnpr COVERAGE PLOT SHEET PROJECT: -r'o08 0 cryo PA

UL I KAUNI; LAAMINA I IUN U/J I A bI1"1 I (MANUAL PIPING) site: DUANE ARNOLD Report No.: 101067 Calibration Sheet No.: C-081 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.: 0 System:_RECIRC Exam SurfaceTemp:_84 F Couplant: HUMEX Exam Start: 0945 Thermometer SIN: 3473 Batch No. 0(1165 Exam End: 0955 Weld ID: RRF-D001 Search Unit_0 Examination Surface: ID u OD [ Material Type: CS 0 SS Q] Other: N/A Lo

Reference:

TOP DEAD CENTER Axial Scan Sensitivity (dB)_41.0 Wo Reference- WELD CENTERLINE Circ Scan Sensitivity (dB) 41.0 Pertormed Indications Yes No Yes NO Component VESSEL Flow El Axi1ial:J 2 With Against Flow Weld F Circ 3 Upstream 1 El El Centerline 0 CW: 4 Downstream EI U L3 Q w Circ 5 Upstream lZ U Q Q NOZZLE CCWJ C __1 6 Downstream L3 0 El 1 Component 7 L-Wave Base Metal LI l 8 Other CRV Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-2 W- W-2 *SVW-T SW- SW-2 Amp (1 -8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous Data Report # R-128. No changes were observed. Achieved 73.36% code coverage. Examiner Level Date Levr.4H-Revi'w Date ANII Review Date N-14Page of tvo NG-143L- Rev. 1

UL rI ASUNIG; 1XAMINA I ON UATA 5SH F_-F (MANUAL PIPING) Report No.:._01067 Site: DUANE ARNOLD Calibration Sheet No.: C-082 Data Sheet No.: N/A ACP 1211-30 Revision: 0 Procedure No.: oF Couplant: HUMEX Exam Start: 1000 System: RECIRC Exam Surface Temp:_84 Batch No. 00165 Exam End: 1015 Weld ID: RRF-D001 Thermometer S/N: 3473 E OD [ Material Type: CS a SS QI Other: N/A Search Unit 45_ Examination Surface: ID Axial Scan Sensitivity (dB) 47.0 Lo

Reference:

   'FOP DEAD CENTER Circ Scan Sensitivity (dB) 47.0 Wo 

Reference:

_WELD CENTERLINE Perrormed Indications Yes NO Yes NO Component VESSEL 1 With Flow a L3 [] Axial:.j 2 Against Flow Weld F N U--------------- L Circ 3 Upstream ca -I [] ca Centerline 0 CW: 4 Downstream El EI a W Circ 5 Upstream L] El a NOZZLE CCW 6 Downstream a El ] N Component 7 L-Wave Base Metal El a 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-T_1 L- L-2 VW-2 W- W-2 SW-1 SWv- SWv-2 Amp (1 -8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous Data Report # R-1 28. No changes were observed. Achieved 73.36% code coverage. Examiner Level Date Leve II RevieI ate' ANlI Review Date N-14.eIPage of N(3-143JL Kev, 1

ULTRASUNIG EXAMINATION DATA 5HEETI (MANUAL PIPING) Report No.: 101067 Site: DUANE ARNOLD Calibration Sheet No.: C-083 Data Sheet No.: N/A Procedure No.: ACP 1211.30 Revision: 0 Exam Surface Temp:_84 *F Couplant:_HUMEX Exam Start: 1020 System: RECIRC Thermometer S/N: 3473 Batch No. 00165 Exam End: 1035 Weld ID: RRF-D001 Examination Surface: ID Q OD

  • Material Type: CS a SS Q Other: N/A Search Unit 60_

Lo

Reference:

TOP DEAD CENTER Axial Scan Sensitivity (dB) 53.5 Circ Scan Sensitivity (dB) 53.5 Wo

Reference:

WELD CENTERLINE Fertormeo indications

                                           -Yes      No      Yes      No                            Component VESSEL 1 With Flow                  0        l        1       I Axial:   ]      2 Against Flow                I                                       Weld                                  F Circ            3 Upstream
  • Centerline 0 CW: -7

_j 4 Downstream u E a W Circ 5 Upstream El [a NOZZLE CCW 6 Downstream [ 1 El a Component 7 L-Wave Base Metal 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L- L-2 W-2 W- W-2 SW-1 SW- -SW-2 Amp ( 1-) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous Data Report # R-128. No changes were observed. Achieved 73.36% code coverage. Exa'miner Level Date Lpe/II Re\vew," Date ANII Review Date Sjjjy., "y Page 3 of Nu-143Z Rev. 1

ULTRASONIC EXAMINATION DATA 5HEE (MANUAL PIPING) Site: DUANE ARNOLD Report No,: 101067 Calibration Sheet No.: C-084 Data Sheet No.: N/A Procedure No.: ACP 1211.30 Revision: ___ 0 F Couplant:_HUMEX Exam Start: 1037 System: RECIRC Exam Surface Temp:_84 Batch No. 00165 Exam End: 1047 Weld ID: RRF-D00I Thermometer SIN: 3473 OD m Material Type: CS a SS Q Other: N/A Search Unit 700 Examination Surface: ID o Axial Scan Sensitivity (dB) 60.0 Lo

Reference:

_TOP DEAD CENTER Circ Scan Sensitivity (dB) 60.0 Wo

Reference:

_WELD CENTERLINE Performed Indications es NO yes No Component VESSEL 1 With Flow Q [ Axial: 2 Against Flow Weld F U E0 E 0 --- -- -------------- ---- -------- L Circ 3 Upstream E3 U Centerline 0 CW: 4 Downstream 1El U Circ 5 Upstream E3 7 U NOZZLE CCW 6 Downstream I] U L] W Component 7 L-Wave Base Metal 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 VW-2 W- W-2 SW-1 svW- -SW Amp (1-8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous Data Report # R-128. No changes were observed. Achieved 73.36% code coverage.

                                                                                  'Zat       ANII   evie Examiner              Level   Date       Le    11.

lRevi*Nye ANII ReviewDate

                                            "-J3-14.Z-      Rev. nkm 1-    S/1*.14 I                              Page       of -!

O/ N- 4Zev.1

NMC COVERAGE COVERAGE PLOT SHEET PLOT SHEET SITE: *,A-*7-,"UNIT: f REPORT NO.: ca°,~ totOM PROJECT: _____________t o t. 7

                                                                                           'FLOW TEM:      _.___"_COMPONENT                ID NO: R-CIr D* I                          /

2 II I I I I ~ I I l PAGE 5 OF " AMINER LEVEL DATE LEVEL III REVIý t DATE

NT EOTN. IIJMC' COVERAGE PLOT SHEE T ST PROJECT:___________ o~ -7 SYSTEM: _&l. COMPONENT ED)NO: R~R F.- DO CONFIGURATION: NcO Z ZfR R PV Vcsp i 102Z7*7 T-0T,4L i-6 Ct60 Go~ ~ a ýv *) ," 3'.Z - 0

0. 4 Ix . r 7-ci qO,9-7 'Z.

V40 a 15.4 1 10 al IXh3 412AI 2.- 3.S VA61j L.C.W vAo - 2ci VAiJ 7cl to, 9-2 VA GfL-c-- 7-VAC..L4AJ 00VA~J Z 20 Gil 2-0(2. ~ 63'2. 10 zc9 go 7 q 6 ," vi A zqttolql

  • 2. qdo.-p7
                      -Z6 al?. ,7    3        Ijq 6 ?qC(     .L7i~~                        Szo_

zz ý4010 EXAMINER LEVEL DATE

ULTRA501WNI FEXAMINATIUN DAT*A SHh...r (MANUAL PIPING) Report No.: 101088 Site: DUANE ARNOLD Calibration Sheet No.: C-033 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.: System: RPV Exam Surface Temp: 82 F Couplant: HUMEX Exam Start: 1255 Exam End: 1310 Thermometer S/N: 3475 Batch No. 00165 Weld ID: VIA-DOOI

  • Material Type: CS a SS L) Other: N/A ID (] OD Search Unit 00/ LONG Examination Surface:

DEAD CENTER LoR ,TOP Axial Scan Sensitivity (dB) 41.0 Circ Scan Sensitivity (dB) 41.0 WELD CENTERLINE Perlformnecl IIn d-c atRo n-s e-s NO Yes No- Component VESSEL 1 With Flow r] EL Axial: ]- AgainstFlow Weld F UQ L Centerline 0 W Circ CW 3 Upstream 0 El 0i CW: 4 Downstream Circ CCW ]I 5 Upstream [[ Li NOZZLE 0 Component 6 Downstream 7 L-Wave Base Metal Mi LU*1 8 Other CRV No.~ L-2 -2 W-A From Ref -2 W-Sweep W- ReadingW- Max Amp Examination ( 1 -8) No. Indication L- L (In) From L- Ref -2 W-2 W (in) W-Max Max %DAC Max NRI__ Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage. LExaminer Level Date zLev II Revi Dat ANaI Review Date Page. 1. of____

ULTRA*50NIG EXAMINATION DATA SHI:::-EI (MANUAL PIPING) Report No.: 101088 Site: DUANE ARNOLD Calibration Sheet No.: C-034 Data Sheet No.: N/A Revision: 0 Procedure No.: ACP 1211.30 System: RPV Exam SurfaceTemp:82 F Couplant: HUMEX Exam Start: 1311 Weld ID: VIA-DO01 Thermometer SIN:_347_ Batch No. 00165 Exam End: 1327 N/A Search Unit 450 / SHR Examination Surface: ID E] OD a Material Type: CS a SS Q Other: Axial Scan Sensitivity (dB)_47.0 Lo

Reference:

__TOP DEAD CENTER Circ Scan Sensitivity (dB) 47.0 WELD CENTERLINE Wo

Reference:

___________________CrScnSniviydB____ Performea Indications Yes No Yes No Component VESSEL VESSEL 1 With Flow Axial: 2 Against Flow U_ - - ---- - - - - - --

                                                                                         -Weld                          -L      F 2LAgainst-U ca       Q        L1       @         Centerline                                0 Circ CW:      7W      3 Upstream                                                                                                     W
         .J      4 Downstream                    M        []       Q Circ             5 Upstream                          0 [           I0                                       NOZZLE

[] Component CCW 6 Downstream 7 L-Wave Base Metal E l 8 Other N/A W (in) From Ref Sweep Reading Max Examination Indication L (In) From Ref L-1 L- L-2 W-2 - W2 W SW- - Amp (1-8) No. Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage, Level Date Le-o--Revi ANII Review Date

    ""Paminer Page         of (_

NC~-143 Key.4it--Z

ULl KAI*b*UNIG I MINATIUN IA IA irlir" 1 (MANUAL PIPING) Report No.: 101088 site: DUANE ARNOLD Calibration Sheet No.: C-035 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.:

                                                               °F        Couplant: HUMEX                       Exam Start: 1328 System:      RPV                  Exam Surface Tempn :82 Batch No. 00165                       Exam End: 1344 Weld ID: VIA-DOOI                 Thermometer S/N:. 3475 N/A Material Type: CS 1@SS L                 Other:____

Search Unit 600 / SHR Examination Surface: ID L] OD Axial Scan Sensitivity (dB) 53.5 "Lo

Reference:

_'oP DEAD CENTER Circ Scan Sensitivity (dB) 53.5 Wo

Reference:

_WELD CENTERLINE Performed indications es NO es No Component VESSEL I With Flow W U

                                                             -                          a                                                t Axial:    ]         2 Against Flow                       S0                                           Weld                                   F L

[3 [] Centerline 0 Circ 3 Upstream w CW:] S0E Ul W 4 Downstream Circ 5 Upstream NOZZLE S[]l Ul 0 CCw - Component

          -__        6 Downstream                                         U             a 7 L-Wave Base Metal             0l       El           El           U 8 Other N/A I

L ('In) From Ref W (in) From Ref Sweep Reading Max Examination Indication L---)- ( - Amp (1 -8) No. L-I L- L-L VW-L ¥ ¥-K.* %J=V V -- I Max %DAC Max _________ 1Max NR[ Remarks. No Recordable Indications. Reviewed previous data. See attached sheet for coverage. Level Date Lev e ew Date ANII Review Date Ze PageL....Of ~

   "G-3          Rev.1

ULTIRA50*NIC; EXAMINATIUN DJATA 5HhE.I:: (MANUAL PIPING) Report No.: 1010.8 Site:_DUANE ARNOLD Calibration Sheet No.: C-036 Data Sheet No.: N/A ACP 1211.30 Revision: 82HUMEX 1345 Procedure No.:_____________ System:_,RPV Exam Surface Temp:82 Revsio. °F Couplant: Exam Start: Thermometer S/N:_3475 Batch No. 00165 Exam End:_1400 Weld ID: VIA-D00l Material Type: CS I& SS [l Other: N/A Examination Surface: ID Q OD a Search Unit 701/ SHR Axial Scan Sensitivity (dB)_60.0 Lo

Reference:

_TOP DEAD CENTER Circ Scan Sensitivity (dB) 60,0 Wo

Reference:

_WELD CENTERLINE erorm n cations Yes No es 0 Component 0-IV1SSEL S VESSEL [] 1 W ith Flow Axial: 2 Against Flow W[] F Agains Flo c ------------------------- L 3 Upstream a El Centerline O Circ CW: 7W I@ a [] E] J__ 4 Downstream Circ 5 Upstream NOZZLE M El Component

         ---      6 Downstream 7 L-Wave Base Metal             L1      [         L]      U 8 Other N/A W (in) From Ref            Sweep Reading              Max                Examination Indication       L (In) From Ref                                                                                        (1-8)
                                     -W-2   -                         SVV-SW-             W-2      Amp No.        -

Max Max Max %DAC NR I Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage. Date Levl-l Revi /Dat ANII Review Date

    ,XA,miner              Level 01                             Pg ING-143Z Rev. 1

nA qc 10 UNIT: SITE, &Dcr I PROJECT: P- o 17 ToT1Wq1. Lz rn~l SS i &60 4o 4/. ' 0 60

               '27. tl9           j q-70. I? I 2.70 a

0- I qto, q C q/go VAU) )470.9,3 VAL)-. /0 41,5z 1j4-70. .z2-7

                 )q-70.      -,

V11 q. ecl . V, ZS

                       / q70 3         i'qlo. qj
                                                                           '7 VS_4ýje f  CZ . 16 VAL)                                                VACoj          pf                    ?,M ý jq7aP. q-ý i'q7o. 'I3               412-/i.~3 -7 VAcai
              ) ýZ W3 -.        7 PAGE   4 OF.ý Th4h

ULTRASUNIG EXAMINAIlON DAITA bMI (MANUAL PIPING) Report No.: 101089 Site: DUANE ARNOLD Calibration Sheet No.: C-041 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.:

                                                                         °F       Couplant:_HUMEX                     Exam Start: 1405 System: RPV                      Exam Surface Tem p: 82 Weld ID: VIC-DI                   Thermometer S/N:_____                            Batch No. 00165                     Exam End:__1420 Search Unit_2i/ LONG Examination Surface:

ID Q OD og Material Type: CS U SS Q Other:_N/A Lo

Reference:

TOP DEAD CENTER Axial Scan Sensitivity (dB)_41.0

                  .WELD CENTERLINE                                                                   Circ Scan Sensitivity (dB) 41.0
                                                         'Performed            I n icat ons Yes        No          Yes        No                              Component I

VESSEL 1 With Flow I-7 Cneln r L Axial: 2 Against Flow 0 E Centerline 0 Circ 3 Upstream 0 0 U w CW: ] 4 Downstream Q 0 0 5 Upstream NOZZLE Circ 0 0 CCW I 6 Downstream 0 E o U Component 7 L-Wave Base Metal 0 El Q 8 Other CRV []0 L3 a _ _ _ __ _ _ _ _I __ _ _ _ _ _ _ _ _I W (in) From Ref Sweep Reading Max Examination (1 -8) Indication L (In) From Ref r ¶1iF'T Amp I--1 I L- - I vv-2

                                                -.- -      .. vv-    -  VV-L       vv-r.rx,  I r TW1T    ,v V -t No.                                -2       W-Z             W Mny       VV -z      S'VV"I     Mvv                 %DAC IWl*v                                                                 Max Remarks:-A                                                     Mvx No Recordable Indications.

Reviewed previous data. See attached sheet for coverage. Level Date Level III Reviewl ate ANII Review Date Fkaminer Z~d/Page L- of (D

ULTIRAONIC EXAMINATION DATA5HhIkI I (MANUAL PIPING) Site DUANE ARNOLD Report No.: 101089 Situ. Callibratilon Sheet No.: C-042 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.: System: RPV Exam Surface Temp: 82 F Couplant: HUMEX Exam Start: 1421 Batch No. 00165 Exam End: 1439 Weld ID: VIC-DOOI Thermometer S/N: 3475 [ Material Type: CS [] SS [3 Other: N/A Search Unit 450/SHR Examination Surface: ID C]"0D TOP DEAD CENTER Axial Scan Sensitivity (dB)_47.0 Lo

Reference:

Circ Scan Sensitivity (dB) 47.0 Wo

Reference:

WELD CENTERLINE Performed Indications Yes No Yes No Component VESSEL 1 With Flow Q a Axial: 2 Against Flow 1 Weld F Circ 3 Upstream 1 Q] a Centerline 0 CW: flW C_J 4 Downstream El Q [] Circ 5 Upstream [ -3 1U a NOZZLE CCW 6 Downstream 0 13 Q N Component 7 L-Wave Base Metal 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-2 W- W-2 *SW-1 ESVW -SW-2 Amp (1 -8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage.

    -dminer              Level   Date        Lev     I Revi w                  Date         ANII Review                 Date
                                                         -143                                                 Page       of. __.p
  -N313-    Kev.1

ULTRASONIG EXAMINAT ION IJATA SHE::ET (MANUAL PIPING) Site.. DUANE ARNOLD Report No.: 101089 Calibration Sheet No.: C-043 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.: F Couplant: HUMEX Exam Start: 1440 System: RPV Exam Surface Temp:_82 Batch No. 00165 Exam End: 1455 Weld ID: VIC-DO01 Thermometer S/N: 3475 Search Unit_600 / SHR Examination Surface: ID E OD a Material Type: CS W SS Q Other: N/A Axial Scan Sensitivity (dB)_,5.5 Lo

Reference:

TOP DEAD CENTER Circ Scan Sensitivity (dB) 53.5 Wo

Reference:

_WELD CENTERLINE Performed Inaications Yes No Yes NO Component VESSEL 1 With Flow I3 W Axial: ] Against Flow [ Weld F L Circ 3 Upstream W [] 0 N Centerline 0 W CW: C'7 __ 4 Downstream 0 [] El a Circ 5 Upstream W 0 El W NOZZLE CCW 6 Downstream N U 0 Component 7 L-Wave Base Metal Q 8 Other N/A 0 [] E 0 Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 vW-2 WV- W-2 SWV-1 SW- -SW-2 Amp (1 -8) Max Max Max %DAC NEU NRI Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage. Level Date L Le ANII Review Date Neve3 Rev. 1 D/ Page _..__ of _1P NU-143Z Rev. 1

ULTRASONIC EXAMINATIOUN UAIA M5H I I (MANUAL PIPING) Report No.: 101089 Site: DUANE ARNOLD Calibration Sheet No.: C-044 Data Sheet No.: N/A ACP 1211.30 Revision: 0 Procedure No.:

                                                           °F     Couplant:_HUMEX                   Exam Start: 1457 System: RPV                  Exam SurfaceTemp: 82 Batch No. 00165                   Exam End:    1512 Weld ID: VIC-D00I             Thermometer S/N: 3475 Q3OD [ Material Type: CS a SS Q                   Other: N/A Search Unit 700 /ISHR Examination Surface: ID Lo 

Reference:

_TOP DEAD CENTER Axial Scan Sensitivity (dB)_60.0 Circ Scan Sensitivity (dB) 60.0 Wo

Reference:

_WELD CENTERLINE Performed ications Yes No Yes No Component VESSEL 1 With Flow Axial: ] 2 Against Flow U Weld F Circ 3 Upstream ] U C a Centerine 0 OW: -- Q U*1 W C_J 4 Downstream Circ 5 Upstream 1 E a1 NOZZLE CCW 6 Downstream W U3 1 a Component 7 L-Wave Base Metal U a U 0 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L- L-2 W-2 V- W-2 VW-1 SW- SW-2 Amp (1 - 8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage. TLevel Date Lev ANII Review Date 4 of NG-143Z Rev. 1Page

SITE: A"i uNiT:___ PROJECT: LFr 401-7 To-rh44 L= 5-1//9 nis ý IJQe Co Co o

27. 4lq/ Jq7o. q 3 2.70o 0

0- ) q70,qj 14-76.qj- - 2VAD7,q I-I 170. 93 I q6,7.6 2O V70-9 7 7 SW. VAcD I q -7. cl

             /1170. C('3                                                                   V A ~(~-  ee
                               )q-70. qj              v_______y
q. gq 4*1 ý,r Y,,Ko y S-4. 1Cf / rz.1 1,470j. /1£/4 2 .z 2 VAL) I Y7o. VIA 44AJ- ori VAP N'70. '13 41-/.cd-3 -7 14 7o0,I
          ) IZ 33,37 PAGE.5OF    Go

SITE:0%cot Aoidl UNIT::I REPORT NO.: NMC) COVERAGE PLOT SHEET PR:£______ SSE:COMPONENT ID NO: Vi L.- Poe' CONFIGURATION: Nezziet FLO 0, p'v shdE'L-4.

                                 ~jPAGE                                             (oOF--p EMNRLEVEL           DATE                LVEL II REVIEW45jp~        DATE-/              14i~

ULTRASONIG tAAMINA I IUN UA I -bhr-i I ---I I (MANUAL PIPING) site: DUANE ARNOLD Report No.: 101090 Calibration Sheet No.- C-037/ Data Sheet No.: N/A Procedure No.: ACP 1211.30 Revision: 0 Exam Surface Temp: 82 °F Couplant HUMEX Exam Start 1140 System: RPV Thermometer SIN: 3475 Batch No. 00165 Exam End: _1150 Weld ID: V1F-D001 Search Unit_0 0/LONG Examination Surface: ID (3 OD e Material Type: CS 2 SS Q Other:_N/A Lo

Reference:

_ TOP DEAD CENTER Axial Scan Sensitivity (dB)_41.0 WELD ENTELINE41 0 WWELD CENTERLINE Circ Scan Sensitivity (dB)_41.0 Ferrorme Inaicatlons Yes -NO Yes NO Component VESSEL 1 With Flow 0 [ 1o Ail 2 Against Flow 1 Weld F L Circ 3 Upstream L3 *1 E El Centerline 0 W CW: fl 0 1u 0 G 4 Downstream Circ 5 Upstream 1I c El U NOZZLE

         -J C       6 Downstream                    u         9          o        u                            Component 7 L-Wave Base Metal             E3        a          Q        Q 8 Other CRV Indication       L (in) From Ref           W (in) From Ref                Sweep Reading            Max               Examination No.       L-1       L-      L-2     WY-2       W-        W-2     W-1 S       TSW - "W-2          Amp                 (1 -8)

Max Max Max %DAC NR] Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for covcrage.

 /EJkamniner             Level   Date                          ,atd                         ANN Review                  Date N6 1   IPage                              of _

N14 Iev.1 qC f/i&

ULTI*ASONIG EXAMINATION DATA 5HF-..T (MANUAL PIPING) site. DUANE ARNOLD Report No.: IOtO90 Calibration Sheet No.: C-038 Data Sheet No.: N/A Procedure No.: ACP 1211.30 Revision: 0 System: RPV Exam Surface Temp:_82 °F CouplantHUMEX Exam Start: 1157 Weld ID: VIF-D001 Thermometer S/N: 3475 Batch No. 00_15 Exam End: 1215 Search Unit_450/ SHR Examination Surface: ID 3 OD a Material Type: CS C SS o Other. N/A Lo

Reference:

__TOP DEAD CENTER Axial Scan Sensitivity (dB) 47.0 WELD ENTELINE47.0 Wo

Reference:

WELD CENTERL.NE Circ Scan Sensitivity (dB)_4_.0 Ferronned fIndicaUons "Yes NO Yes NO Component VESSEL 1 With Flow L3 o 0- c Axial: 2 Against Flow Weld F in3t13w C9e- ---------------- L Circ 3 Upstream W (3 E3 0 Centedine 0 CW: 4 Downstream E2 E Q W Circ 5 Upstream E31 E U NOZZLE CCW

        --J    6 Downstream                     C        L         E        0                            Component 7 L-Wave Base Metal               Q 8 Other_/A Indication      L (In) From Ref            W (in) From Ref                 Sweep Reading         Max               Examination No.       TFL-1L-            L-2     -2         -         vv-z    .W:T-1     SWv- *W-2       Amp                   (1 -8)

Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage. N 4 Level Date Lv Date ANII Review Date NU-144l Rev. 1 *iKýVlll Page 2 of C Mo fi$

ULTIAbONIL F-AAMINATIUN DATA 5Hl I::T (MANUAL PIPING) Site: DUANE ARNOLD Report No.: 101090 Calibration Sheet No.: C-039 Data Sheet No.: NIA Procedure No.: ACP 1211.30 Revision: 0 0 Couplant:______ Exam Start 1215 System: RPV Exam Surface Temp:_82 F Weld ID: VIF-DOOI Thermometer S/N: 3475 Batch No. 00165 Exam End: 1230 Examination Surface: ID L] OD Material Type: CS a SS [] Other. N/A Search Unit 60 0 /SHR Lo

Reference:

TOP DEAD CENTER Axial Scan Sensitivity (dB) 53.5 Wo

Reference:

WELD CENTERLINE Circ Scan Sensitivity (dB) 53.5 Performed indications Yes No Yes NO Component VESSEL 1 With Flow I u3 Axial: ] 2 Against Flow * [ Weld F L 3 Upstream 13 El Centerdine 0 Circ W: ] 4 Downstream E 1 1 W Circ 5 Upstream 311 - a NOZZLE CCW- 6 Downstream [] 1 a Component 7 L-Wave Base Metal U 8 Other NIA Indication L (In)From Ref W (in) From Ref Sweep Reading Max Examination No. L1 L- 1L-2 W-2 WV- W-2 M-1 bSW- :SW-2 Amp (1-8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage. 7 Examiner Level Date ANII Review Date IPage

  • of I NG-143Z Kev. 1

ULTRAINIG LA MINA I IUN UATJI A w-rl I (MANUAL PIPING) Se:DUANE ARNOLD Report No.: __o9 site.Calibration Sheet No.: C-040 Data Sheet No.: NIA ACP 1211.30 Revision: 0 Procedure No.: System:_RPV Exam Surface Temp:_82 F CouplantHUMEX Exam Start_1216 Batch No. 00165 Exam End: 1232 Weld ID: VIF-D001 Thermometer S/N:_345 Material Type: CS Co SS [] Other. N/A Search Unit 700/ SHR Examination Surface: ID E) OD Ig Lo

Reference:

TOP DEAD CENTER Axial Scan Sensitivity (dB)60.0 Circ Scan Sensitivity (dB) 60.0 Wo

Reference:

WELD CENTERLINE Performed indtcations Yes No Yes No Component VESSEL 1 With Flow 0 U a Axa 2 Against Flow Weld F g Q3 0 a------------------ L Circ 3 Upstream

  • c l Q E3 0

1 Centerline O W CW: 4 Downstream L3 Circ 5 Upstream I NOZZLE CCW 6 Downstream

  • o LI
  • Component 7 L-Wave Base Metal 8 Other N/A Indication L (in) From Ref W (in) From Ref Sweep Reading Max Examination No. -13V- L- L-t W- NW-2 vW- -W-1 SWv- SW-2 Amp (1 -8)

Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous data. See attached sheet for coverage.

  /=cmie                 Level   Date      Le'erolIRevi~/                    t          ANtI Review                Date 1

NG4*43Z Ket, 1 /4- i Page,..L of _ NG-1431 Rev. 1 1zj 4(t*r

SITE: t) - ..'veAfa...i UNIT: REPORT NO.: Caftt NMC COVERAGE PLOT SHEET UUtC.~~. PROJECT:- PI P d 0 SYSTEM:_RPV COMPONENT ID NO: Vric 0oo t CONFIGURATION: N~O-1r le FIP RP .p rt To rqI. 00o - ow 6600

                          -27.10Yf           14/70.q3                                                                           V)4..2L)eq-      7 j q,? 0.-l.

0 L150 V140 q6 VAcQ VAU-

                                                    -703-7 4 sw   Iah                          10 41.s jq7   0  ~  el I q~o.q-!ý.                                                                    VA44j-I'?7o ,              ,q7o. qS                 V4P...                                  "4C-S, 0 0 4%,rZ                     167 1q470.R VA P lq7'o.coi,
             \/Ac~ew     ljq7o,      -kS       1-4-70. S 3_             VAatLAI-1 1 ,Y112 -67    E     i LJ ETXOU1NER,                            LEVEL     DATE              LEVEL                                           fr
                                                                                                                        -/ I          PAGE .OF,
                                                                      -Iri-             ý.    -                DATE U~f-                                                 1W                          I.~%qI wvr W11-U -  v  -

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) St:DUANE ARNOLD Report No.: 101203 C09 Site: ~Calibration Sheet No.:c-9 Data Sheet No.: N/A Revision: 3 Procedure No.: ACP 1211.20 HUMEX Ea tr:12 Sytm_______68 Couplant: Exam Start: 1329 RECIRC Exam Surface Temp: 68 F System: Weld ID: RCB-1030 Thermometer S/N: 3471 Batch No. 00165 Exam End: 1335

  • Material Type: CS Ei SS 0 Other: N/A Search Unit 60' RL Examination Surface: ID QJOD Axial Scan Sensitivity (dB)_ 69.6 Lo

Reference:

TOP DEAD CENTER WELD CENTERLINEN/ Scan Sensitivity (dB) N/A _ _ _ _ _ _Circ W o

Reference:

Performed Indications Yes No Yes No Component Weld-O-Let r 1 With Flow L[ L[ Axial: t. Weld F 2 Against Flow 1 E a - ---- ------ ----- L Circ r 3 Upstream 0 0 El Lk Centerline 0 CW: t 4 Downstream 13 M Li3 0 W [ 5 Upstream [] a El (3 Branch Connection Circ CCW 1 6 Downstream Ll W [] [] Component 7 L-Wave Base Metal Li M L] L[ 8 Other N/A Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-1 W- W-2 SW-1 SW- SW-2 Amp (1 -8) Max ___ Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous Data Report # 91-257. No changes were observed. Achieved 38% code coverage. Examiner Level Date L Aeft Rev ,ate ANII Review Date

                                                            ."-*'-                                                Page    I   of NG-143Z Rev. 3

i ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) Site: DUANE ARNOLD Report No.:,, 101203 09 Calibration Sheet No.: -9 Data Sheet No.: N/A Procedure No.: ACP 1211.20 Revision:3 System: RECIRC Exam Surface Temp:_68 F Couplant: Exam Start: 1317 Weld ID: RCB-J030 Thermometer SIN: 3471 Batch No. 00165 Exam End: 1325 [ Material Type: CS C) SS U Other: N/A Search Unit 45_ SHR Examination Surface: ID Q OD Axial Scan Sensitivity (dB)__52.0 Lo

Reference:

TOP DEAD CENTER WELD CENTERLINE N/A We

Reference:

Circ Scan Sensitivity (dB)N Performed Indications Yes No Yes No Component Weld-O-Let 1 With Flow S 0 U Axial: 2 Weld F 2Against Flow -- ------ ----- L Circ 3 Upstream L3 0 Q U Centerline 0 CW: t. 4 Downstream Ql N 03 0- W Circ r 5 Upstream 0 [] 0 Q Branch Connection 6 Downstream Q a l Component 7 L-Wave Base Metal E3 N 0 8 Other N/A Indication L (In)From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-1 W- W-2 SW-1 SW- SW-2 Amp (1 -8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous Data Report # 91-257. No changes were observed. Achieved 38% code coverage. Examiner Level Date LeOal.4JotRevi Dt ANII Review Date Page of NG-143Z Rev. 3

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) Site: DUANE ARNOLD Report No.: 101203 Calibration Sheet No.:_c-094 Data Sheet No.: N/A Procedure No.: ACP 1211.20 Revision: REIC68 1-UMEX 12 Exam Start: 1326 Exam Surface Temp: 6 F Couplant: _____ System: RECIRC Batch No. 00165 Exam End: 1328 RCB-J030 Weld ID:,_____ Thermometer SIN: 3471 [ Material Type: CS U SS N Other: N/A Search Unit_ 350 SHR Examination Surface: ID Q OD Axial Scan Sensitivity (dB)_ N/A Lo

Reference:

_TOP DEAD CENTER Circ Scan Sensitivity (dB) 52.8 WELD CENTERLINE Wo

Reference:

___________________CrScnSnivtydB Performed Indications Yes No Yes No Component Weld-O-Let 1IWith Flow E0 3 l Axial: L. Weld F 23Against Flow ) C3 .--------- -------- L L El Centerline 0 Circ r 3 Upstream N W CW: 4 Downstream El El [] Circ r 5 Upstream U j Branch ConnectionE, CCW I. Component 6 Downstream 7 L-Wave Base Metal [] N Q 8 Other N/A 0 U U L (In) From Ref W (in) From Ref Sweep Reading Max Examination Indication No. L-1 L- L-2 W-1 W- W-2 SW-1 SW- SW-2 Amp (1 -8) Max Max Max %DAC NRI Remarks: No Recordable Indications. Reviewed previous Data Report # 91-257. No changes were observed. Achieved 38% code coverage. Level Date Lerve}-R ew Pate ANII Review Date Examiner NG14Page 3 Ofv3 NG-143Z Rev, 3

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) Site: DVA#Je AR.4o&-b Report No.: = 0 1 l'f Calibration Sheet No.; c- - vo t z Data Sheet No.: ,/ Procedure No.: 12. Ii . I' Revision: j_ System: SCUM,*tAJbE% " Exam Surface Temp: 6 °F Couplant: 1l4UM' Exam Start: I S-0 WeldID: !s btj--..o/ Thermometer SIN: /bI$% Batch No. e4 sr(IA Exam End: jqv, Search Unit 1,5-73 Examination Surface: [j] ID [0 OD Material Type: [g CS [1SS Other. .l_ Lo

Reference:

          ""b e-                                                                       Axial Scan Sensitivity (dB)__.5 Wo 

Reference:

or-L, D 4.-- Circ Scan Sensitivity (dB) 4-4, Performed Indications Yes No Yes No Component 1 Wth Flow R Weld CAAP Axial: 2 Against Flow [A El E1[ Weld L L_ L Circ 3 Upstream [A E] E- [g Centerline O CW: 4 Downstream 9 El E" r* W Circ CCW 5 Upstream R El El E PP* .. 6 Downstream [R L- El [R1 Component 7 L-Wave Base Metal r- MI I- 0I 8 Other El f1 L-I FL Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-2 W- W-2 SW-1 SW- SW-2 Amp (1 -8) Max Max Max %DAC Remarks: 4,Jo CC-c-P* 4,*4.C /1,,AC.477,VWS. C;6'6 A777-rCA*C OF&4'" 5,,4,,V flL.flUI.7J

                          '.  .. A IULJ---------

f'JIA( LJT, ii jAJ / 1/2 - - 1r

                                                                                                                 ,x-,
                                                                                                                                *s.            L'Ur Ata1/4  ro &aS '      8 3A goa-A Examiner                   Level         Date        Level III Review               Datd                  ANII Review                    Date Page       /of NG-143Z Rev. 1

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) Site: -0i;AJ .ARA)OLAD ,IReport No.:- .3-c-o ,It ,- 3 Calibration Sheet No.: c. - vo 13 1Data Sheet No.: . *,* Procedure No.: '1 1I. I, Revision: ZL r,,* ORe rW ) System: suc*v, 0 rc-,wA4CExam Surface Temp: 09 "F Couplant: /i)M K Exam Start: Iqo 1 WeldID: 57J-J...O*.10 ThermometerS/N: I, 'fI, Batch No. j ? !&!4 ExamEnd: /qIZ Search Unit __,*7) Examination Surface: [I] ID QdOD MaterialType: [ CS r-SS Other. J. Lo

Reference:

7-b C. Axial Scan Sensitivity (dB) 7J Wo

Reference:

              ','Ct-b       .                                                      Circ Scan Sensitivity (dB)L.,,

Performed Indications Yes No Yes No Component 1 With Flow r [ E E [0 W CAP 2 Against Flow Z -- [ MF Weld L Circ 3 Upstream rl [ - Centerline O CW: 4 Downstream [] [0 LI [] W Circ CCW 5 Upstream El [1 El [] Pj PC 6 Downstream EL R[ E] Ei Component 7 L-Wave Base Metal r- F1 F]1 8 Other El L-El [L Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-2 W- W-2 SW-i SW- SW-2 Amp (1 -8) Max Max Max %DAC Remarks: sJo ,'o ,OA .6 zJOCAP"'J*. GF-c A1,ir-'ce/? S eo,,AJ t 7r,'4 __,_._-___-sew ^AjLS ' 3 u. Examiner Level Date Level IlI Review Date ANII Review Date Page Z- of--- NG-143Z Rev. 1

ULTRASONIC EXAMINATION DATA SHEET (MANUAL PIPING) Site: b0,AAU'-' AANDo*> ReportNo.: *-'l Calibration Sheet No.: C- ool Data Sheet No.:- j/ Procedure No.: / . I, Revision: x.. System:*s*g,,. o,sAM"-" Exam Surface Temp: P& *F Couplant: H CA Exam Start: /P -Po Weld ID: s.,#j- CA"olo Thermometer SIN: Ii, S719 Batch No. 11- 57A Exam End: lco 3 Search Unit Cv7 I1/ Examination Surface: [] ID I] OD Material Type: [3 CS E] SS Other: d_.._Z Lo

Reference:

1- C- Axial Scan Sensitivity (drB) 5 -I.__ Wo

Reference:

W,7'-..l 'i Circ Scan Sensitivity (dB) A* Performed Indications Yes No Yes No Component Axial:1 With Flow 2 Against Flow jN 1] l E-E [j [ El W Weld AA F Circ CW: 3 Upstream r- [0 E- El Centerline O W 4 Downstream r- [- L} L-] Circ 5 Upstream El E I] -I P' P CCW 6 Downstream Ei [X El El Component 7 L-Wave Base Metal El [A 0 L 8 Other El [0 LJ Ln Indication L (In) From Ref W (in) From Ref Sweep Reading Max Examination No. L-1 L- L-2 W-2 W- W-2 SW-1 SW- SW-2 Amp (1 -8) Max Max Max %DAC Remarks: J,)o £e ,'ýo',CAT7O,,S. LJ$: A75*,S Ao1 - ..6*I,, Examiner Level Date Level III Review Dat ANII Review Date Page .. 3__ of NG-143Z Rev. 1

Wall Thickness Profile Sheet I SYSTEM: cR.AM P>IScAe6EC I Site: r oA COMPONENT ID NO: St4,- sojo

                                                                             ,     Unit: I I    S=-!o 1L4, REPORT NO:

Position I o0 900 1800 2700 CROWN HEIGHT: _ _ _ 2 .'-_ CROWN WIDTH:

  • 54 s-o7 ro __ _ _ _ _ _ NOM. DIAMETER: 2 L"
                ,               I      i47 WELD LENGTH:        7 ."$7'                          FLOW NAME            L. Leve     D NAME                  Level    Daate            DAEC NDE Level Ill/Date                  ANII/Date                 page 4fof_5--

to 2a 4( FlI

     -J    -2       0 6 41        ~ '
              ~H~JM 1

3~ be}}