NG-04-0539, August 2004 Monthly Operating Report for Duane Arnold Energy Center

From kanterella
Jump to navigation Jump to search
August 2004 Monthly Operating Report for Duane Arnold Energy Center
ML042670257
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/14/2004
From: Peifer M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-04-0539
Download: ML042670257 (3)


Text

NMC Committed to Nuclear Excellenc Duane Arnold Energy Center Operated by Nuclear Management Company, LLC September 14, 2004 NG-04-0539 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center

-Docket 50-331 License No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center (DAEC) Monthly Operating Report. The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter'makes no new commitments or changes to any existing commitments.

Sincerely,

-Mark A. P

.eifer Site Vice President, Duane Arnold Energy Center Nuclear Management Company, LLC

Enclosure:

(1)

CC

. Administrator, Region Ill, USNRC Project Manager; DAEC, USNRC

..Resident Inspector, DAEC, USNRC

.. 7,

I : ;,; ;

i.

i-I

. I I

.. i

--I

-,_>



3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 319.851.7611

ENCLOSURE 1 MONTHLY OPERATING REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-331 Duane Arnold September 7, 2004 Mike Fairchild (319) 851-7642 REPORTING August 2004 PERIOD:

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)
3. Number of Hours the Reactor was Critical
4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 424,868.00 Yr-to-Date 5,783.57 5761.23 0.00 3,320,862.00 Cumulative 207,461.84 203,046.75 192.80 95,276,137.68 UNIT SHUTDOWNS Type Method F: Forced of Cause & Corrective S:

Duration Shutting Action No.

Date Scheduled (Hours)

Reason1 Down Comments

-I

-I I

I-

-I-

'Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2 Method:

I Manual 2

Manual TriplScram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 2

NARRATIVE

SUMMARY

There were no departures from full power operation during the month of August.

Page 2of2