February 2004 Monthly Operating Report for Duane Arnold Energy Center
ML040830609
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/12/2004
From: Peifer M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NG-04-0152
Download: ML040830609 (3)


Text

CNleE Duane Arnold Energy Center Committed to Nuclear Ecellene Operated by Nuclear Management Company, LLC March 12, 2004 NG-04-01 52 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station 0-P1-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, Site Vice President, Duane Arnold Energy Center CC Regional Administrator, USNRC, Region IlIl Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

Enclosure:

OPERATING DATA REPORT 3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 319.851.7611

/>e2I

March 12, 2004 Enclosure to NG-04-0152 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE March 4, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING February 2004 PERIOD:

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)

This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was 696.00 1440.00 203.118.27 Critical
4. Number of Hours Generator On-line 696.00 1440.00 198.725.52
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical Energy Generated 406.471.90 843.339.20 92.798.614.88 (MWHrs)

UNIT SHUTDOWNS Type Method Cause &

F: Forced of Corrective S: Duration Shuttinp Action o Date Scheduled (Hours) Reason 1 Down Comments I,

'Reason: 2 Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

March 12, 2004 Enclosure to NG-04-0152 Page 2 of 2 NARRATIVE

SUMMARY

During the month, departures from full power operation occurred for the following:

1.) On February 18 at 2145 for a load line adjustment.

2.) At 2257 on February 27 for performing various surveillance tests and sequence exchange. Rated power was achieved at 0100 on February 29.

3.) On February 29 at 0933 and 2159 for load line adjustments.

Text

CNleE Duane Arnold Energy Center Committed to Nuclear Ecellene Operated by Nuclear Management Company, LLC March 12, 2004 NG-04-01 52 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station 0-P1-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, Site Vice President, Duane Arnold Energy Center CC Regional Administrator, USNRC, Region IlIl Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

Enclosure:

OPERATING DATA REPORT 3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 319.851.7611

/>e2I

March 12, 2004 Enclosure to NG-04-0152 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE March 4, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING February 2004 PERIOD:

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)

This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was 696.00 1440.00 203.118.27 Critical
4. Number of Hours Generator On-line 696.00 1440.00 198.725.52
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical Energy Generated 406.471.90 843.339.20 92.798.614.88 (MWHrs)

UNIT SHUTDOWNS Type Method Cause &

F: Forced of Corrective S: Duration Shuttinp Action o Date Scheduled (Hours) Reason 1 Down Comments I,

'Reason: 2 Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

March 12, 2004 Enclosure to NG-04-0152 Page 2 of 2 NARRATIVE

SUMMARY

During the month, departures from full power operation occurred for the following:

1.) On February 18 at 2145 for a load line adjustment.

2.) At 2257 on February 27 for performing various surveillance tests and sequence exchange. Rated power was achieved at 0100 on February 29.

3.) On February 29 at 0933 and 2159 for load line adjustments.