NG-07-0255, Withdrawal of Relief Request to Use the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment

From kanterella
Jump to navigation Jump to search
Withdrawal of Relief Request to Use the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment
ML070870388
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/15/2007
From: Vanmiddlesworth G
Duane Arnold
To:
Document Control Desk, NRC/NRR/ADRO
References
NG-07-0255
Download: ML070870388 (2)


Text

FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Enery.

Duane Arnoild Energy Center March 15, 2007 NG-07-0255 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket: 50-331 Op. License No: DPR-49 Withdrawal of Relief Request to Use the Provisions of Appendix VIII, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment at the Duane Arnold Energy Center

References:

1) -Letter, G. Van Middlesworth' (FPL Energy) to USNRC, "Request for Relief from the ASME Section XI Code to Allow Use of the Provisions of Appendix VIII, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment at the Duane Arnold Energy Center,"

NG-07-0143, dated February 14, 2007

2) Letter, G. Van Middlesworth (FPL_ Energy) to USNRC, Request to Extend the Third 10-Year Inservice Inspection (ISI) Interval for Reactor Vessel Welds: VLA-AO01, VLA-A002, VLB-AO01, VLB-A002, VLC-B0oi, VLC-,-B002, VLD-B001, VLD-B002, and VCB-C005," NG-07-0164, dated February 19, 2007 In Reference 1, FPL Energy Duane Arnold requested relief from the American Society of Mechanical Engineers (ASME) Code to allow use of an evaluation of cable lengths used for In-Service Inspection (ISI) examinations at the Duane Arnold Energy Center (DAEC). Based upon conference calls held with the Staff on February 16, 2007, FPL Energy Duane Arnold also submitted the Reference 2 relief request regarding the 'subject ISI examinations at'the"DAEC.

The NRC Staff has subsequently verbally granted the Reference 2 relief request in a conference call on March 6, 2007. Consequently, FPL Energy Duane Arnold 4cwi

NG-07-0255 March 15, 2007 Page 2 of 2 no longer requires the Reference 1 relief and hereby withdraws that application.

This letter contains no new commitments and no revisions to existing commitments.

Questions regarding this matter should be directed to Steve Catron, Licensing Manager, at (319) 851-7234.

Gary Van Middlesworth Site Vice President, Duane Arnold Energy Center FPL Energy Duane Arnold cc: Administrator, Region Ill, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC