NG-07-0470, Partial Withdrawal of Proposed Technical Specification Change Request (TSCR-083)

From kanterella
Jump to navigation Jump to search

Partial Withdrawal of Proposed Technical Specification Change Request (TSCR-083)
ML071630258
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/01/2007
From: Vanmiddlesworth G
Duane Arnold
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-07-0470, TAC MD2619
Download: ML071630258 (2)


Text

FPL Energy Duane Arnold, LLC 0 FPL Energy.

3277 DAEC Road Palo, Iowa 52324 Duane Arnold Energy Center June 1,2007 NG-07-0470 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Partial Withdrawal of Proposed Technical Specification Change Request (TSCR-083) for the Duane Arnold Energy Center (TAC NO. MD2619)

Reference:

G. Van Middlesworth (FPL Energy Duane Arnold) to USNRC, "Technical Specification Change Request (TSCR-083): Adoption of TSTF-478, Rev.

0, "BWR Technical Specification Changes that Implement the Revised Rule for Combustible Gas Control," NG-06-0472, dated July 17, 2006.

In the referenced letter, FPL Energy Duane Arnold, LLC (FPL Energy Duane Arnold) requested an amendment to the Technical Specifications (TS) for the Duane Arnold Energy Center (DAEC). Included in those requested changes were revisions to Limiting Condition for Operation (LCO) 3.6.3.2, Primary Containment Oxygen Concentration.

FPL Energy Duane Arnold hereby requests that those changes pertaining to LCO 3.6.3.2 be withdrawn. The remaining portions of the original amendment request related to deletion of LCO 3.6.3.1, Containment Atmosphere Dilution (CAD) System, are unchanged by this letter.

This letter makes no new commitments or changes to any existing commitments.

If you have any questions or require additional information, please contact Mr. Tony Browning at (319) 851-7750.

N44L

NG-07-0470 June 1,2007 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.

Executed on June 1, 2007.

Gary Van Middlesworth Site Vice President, Duane Arnold Energy Center FPL Energy Duane Arnold, LLC cc: Administrator, Region Ill, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC D. McGhee (State of Iowa)