05000293/LER-1983-015, Forwards LER 83-015/03L-0

From kanterella
(Redirected from 05000293/LER-1983-015)
Jump to navigation Jump to search
Forwards LER 83-015/03L-0
ML20079P987
Person / Time
Site: Pilgrim
Issue date: 04/25/1983
From: Harrington W
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20079P992 List:
References
83-99, NUDOCS 8305110334
Download: ML20079P987 (1)


LER-2083-015, Forwards LER 83-015/03L-0
Event date:
Report date:
2932083015R00 - NRC Website

text

- _ _ _ -. _ _ _ _ _ ._ .__

f BOSTON EDISON COMPANY f 800 BOvLaTON STREET BOSTON. massachusetts 02199 WILLIAM D. HARRINtITON asmann vies passensut egygbsAR April 25,1983 BECo. Ltr. #83-99 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

. Docket No. 50-293 License DPR-35

Dear Sir:

The attached License Event Report 83-015/03L-0, " Standby Gas Treatment System", is hereby submitted in accordance with the requirements of Pilgrim l Nuclear Power Station Technical Specifications 6.9.B.2.c.

If there are any questions on this subject, please contact us.

Respectfully submitted, i

4 William D. Harring n WDH/mg Enclosure LER 83-015/03L-0 cc: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Standard BECo. LER distribution 4

8305110334 830425 DR ADOCK 05000293 PDR

- -_ - _. - , . _ - - . _ _ - . _ - - - - . - - - - - - - - _ - . . . . . - _ - -