05000265/LER-1998-005, Forwards LER 98-005-00,per 10CFR50.73(a)(2)(vii)B. Commitments Made by Util,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 98-005-00,per 10CFR50.73(a)(2)(vii)B. Commitments Made by Util,Listed
ML20238F009
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 08/28/1998
From: Dimmette J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20238F012 List:
References
SVP-98-284, NUDOCS 9809030051
Download: ML20238F009 (2)


LER-2098-005, Forwards LER 98-005-00,per 10CFR50.73(a)(2)(vii)B. Commitments Made by Util,Listed
Event date:
Report date:
2652098005R00 - NRC Website

text

  • *

(

, t iHlH)Dil)5.CJhh l tlaw )O ( .a ul)l1Jnt

, Qiud 4 iors t.corralum st.uion J "'in 2noth \\ rnov incto i s irdt ;\ J l\ hi j gj u* o) -

Itl 4FN O t JJll 9

SVP-98-284 August 28,1998 United States Nuclear Regulatory Commission Washington. DC 20555 Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-265. DPR-30, Unit Two Enclosed is Licensee Event Report (LER)98-005, Revision 00, for Quad Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the Code of Federal Regulations. Title 10, Part 50.73(a)(2)(vii)B. The licensee shall report any single cause ofinoperable independent train or channel in a single system designed to remove residual heat.

Comed is committing to the following actions:

1. Initiate a predef'me to verify proper operation of HPCI Turbine Turning Gear Speed Sensing Limit Switches LS14 and LS15. This preventive maintenance predefine will be initiated by November 1,1998. (Electrical Maintenance)
2. Initiate a predefine to verify proper operation of HPCI oil pressure switches. This preventive maintenance predefine will be initiated by January 31,1999. (Instrument Maintenance)

[/

3. Complete the inspection of the failed Oil Pressure Switch 2-2341-07 to

{

determine the cause ofits failure. This inspection will be completed by {

September 15,1998. (Station Support Engineering) sf gg l i

Any other actions described in the submittal represent intended or planned actions  !

by Comed. They are described for the NRC's information and are not regulatory l commitments.

{

l 9809030051 900828 PDR ADOCK 05000265 S PDR ,

O

( v. J U .

t. - - - _ . - _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _J

7_

l- . .

l.~.

USNRC Li L

SV.P-98-275 2 August 28,1998 l If there are any ' questions.or comments concerning this letter, please refer them to i-Charles Peterson' Regulatory Assurance Manager at 309-654-2241, ext. 3609.

. Sine rely, .

s 1o smtbYh,$ '

Site Vice President f, l , Quad Cities Station /

! JPD/JS/siv l Enclosure -

~

l- cc: J. L. Caldwell, Acting Regional Administrator, Region III

R. M. Pulsifer, Project Manager, NRR
C. G. Miller, Senior Resident Inspector. Quad Cities l W. D. Leech, MidAmerican Energy Company

! D. C. Tubbs, MidAmerican Energy Company INPO Records Center Office of Nuclear Facility Safety, IDNS Bob Ganser, IDNS, Quad Cities Stanley P. Focht, American Nuclear Insurers l

l l

l i

_ _ ._-_ - -_------.--.-.__-