Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated
ML20116J658
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 08/06/1996
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116J660 List:
References
LWP-96-056, LWP-96-56, NUDOCS 9608130323
Download: ML20116J658 (1)


LER-2096-011, Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated
Event date:
Report date:
2542096011R00 - NRC Website

text

l

. . (.ommosm calth 1.demn Contp.m)

. (fu:id Cuies Generatmg N.ition 22'10 206th M enue North Cordova. IL 612 #2 9 10 Tel 309M +22 4 i ed LWP-96-056 August 6, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Quad Cities Nuclear Power Station Docket Number (s): 50-254, DPR-29, Unit One 50-265, DPR-30, Unit Two Enclosed is Licensee Event Repad (LER) 254/96-011, Revision 00, for Quad Cities Nuclear Power Stt This report is submitted in accordance with the requirements of the Code i

of Federal Regulations, Title 10, Part 50.73 (a) (2) (ii) (B). The licensee shall report any event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded, or that resulted in the nuclear plant being in a condition that was outside the design basis of the plant.

The following commitments are being made by this letter:

1. Circuit modifications and procedure changes will be implemented on Unit 1 prior to startup to protect necessary associated circuits hot shorts which could cause valve damage. (complete on Unit 2, working on Unit 1).
2. Review a sample of assumptions from the Safe Shutdown Reports and supporting calculations to determine adequacy of original assumption investigation. This review will be completed by 8/2/97.

If there are any questions or comments concerning this letter, please refer them to Nick Chrissotimos, Regulatory Assurance Supervisor at (309)-654-2241, extension 3100.

Respectfully, COMMONWEALTH EDISON QUAD CITIES NUCLEAR POWER STATION b-L. W. Pe ce Station Manager i

Enclosure -Tll .00

_ _ Ac: (per current clerical distribution list) 9608130323 960806 PDR ADOCK 05000254 G PDR STMOR\056%.LWP A l'nicum Compan) fat /4 8 ** I~ 2 0 " b