05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items

From kanterella
Jump to navigation Jump to search
Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items
ML20129E744
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 09/13/1996
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20129E747 List:
References
LWP-96-068, LWP-96-68, NUDOCS 9610010155
Download: ML20129E744 (2)


LER-2096-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items
Event date:
Report date:
2542096017R00 - NRC Website

text

-

o.mnion.caith tar.on o,mpan3 Quad Otics Generating stanon 2l'io 2tu,th Asenue %>rth -

o,raosa.n.<,u a n su

, 1,ci 3ow>s . 22 o l

LWP-96-068  !

l September 13, 1996 U.S. Nuclear Regulatory Commission  ;

i Washington, DC 20555 I Attention: Document Control Desk

]

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One Enclosed is Licensee Event Report (LER)96-017, Revision 00, for Quad  !

Cities Nuclear Power Station. '

This report is submitted in accordance with the requirements of the 1 l

Code of Federal Regulations, Title 10, Part 50.73(a)(2)(iv). The  !

licensee shall report any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature.  !

l The following commitments are being made by this letter:

1. Licensed Operator lesson plans will be revised to ensure the details of the 8/25/96 event and pressure transducer calibration data affecting the EHC system are presented in initial training i

by 12/31/96.

2. The 0/25/96 event will be presented to Operators and Engineers in retraining by 12/31/96.
3. QCGF 1-1, Normal Unit Startup, will be revised to ensure the condenser backpressure bypass permissive is satisfied prior to lowering the EHC setpoint into a control range. This revision will be completed by 11/01/96.
4. The 8/25/96 event will be tailgated with the Training Department by 12/31/96 emphasizing the instructor's responsibility to communicate such discovered information in training materials to ensure thorough and consistent training.

[

pO STMGRW68% LWP 9610010155 960913 PDR ADOCK 05000254 S PDR s i owom ( ompan3

. t t  :

l . ...

LWP-96-068 t

September 13, 1996 j .page 2 j.

i

(

If there are any questions or comments concerning this letter, please i i

refer them'to Charles Peterson, Regulatory Affairs Manager at l 4

309-654-2241, ext. 3602. '

i  !

} Respectfully, i q COMMONWEALTH EDISON 3  !

QU ITIES LEAR POWER STATION l

K Lf W. Pearce

  • Station Manager i

LWP/NC/as t

. Enclosure '

cc: A. B. Beach,-Regional Administrator, Region ~III l R. M. Pulsifer, Project Manager, NRR '

! C. Miller, Senior Resident Inspector, Quad Cities

! R. J. Singer, Mid American Energy Company s i D. C. Tubbs, Mid American Energy Company l P. Piet, Licensing,-Comed 4

' F. Spangenberg, Regulatory Affairs Manager, Dresden l INPO Records Center  !

i  ;

i  !'

i l

.. I i

I

! l i '

h STMGRWM96.LWP '

t

~

i

  • - . ~ ,

.I