05000254/LER-1994-002, Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr

From kanterella
Jump to navigation Jump to search
Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr
ML20199A737
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/19/1998
From: Kraft E
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199A740 List:
References
SVP-98-014, SVP-98-14, NUDOCS 9801280074
Download: ML20199A737 (2)


LER-2094-002, Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr
Event date:
Report date:
2542094002R00 - NRC Website

text

-

i . nun.nm eann i a~.n ...onmn I)oad ( ain s ( t na rainic *f it n,n 2 2* jil 2(kit h \n( IHl'.' b arill i oniin a u 4,i2.; o ci ici wn s i 2:ia SVP-98-014 January 19, 1998 U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Contrul Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254 DPR-29, Unit One Enclosed is Licensee Event Report (LER)94-002, Revision 1, for Quad Cities Nuclear Power Station. This event dealt with "'B' Control Room HVA: Inoperable Due to Failure of a Compressor Mode Contactor "

This report is sut'mitted in accordance with the requirements of the Code of Federal Regulations Title 30, Part 50.73(a)(2)(iv). The fa licensee shall report any event or candition that resulted in manual

'Q or automatic actuation of any Enginee ed Safety Feature.

This LER amendment is part of the responss to Notice of Deviation 97104-03 regarding the failure to install o Hot Gas Bypass system in the Train B Control Room lmergency Ventilation System, which was a Corrective Action cited in the original LER.

The following commitments are being made by this letter:

l

1. Relocate the temperature sensor, which controls compressor operation, to a location where it is less airected by sudden changes in the ambient temperature. /,g'7'l (Completion Pate: 021599). -
2. Evaluate the results of relocating the temperature sensor to assess the effectiveness on excessive compressor cycling, and determine if additional actions are needed.

(Completion Date: 060199),

n

,, w L' V A o . .i . .i 9801200074 900119 PDR ADOCK 05000254 S PDR

l l 6 USNRC Q- -

SVP-98-014 2 January 19, 1998 b

If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager t.t 309-654-2241, ext. 3609.

Respectfully,

66. k E. S. Kra J}f .

Site Vice President Quad Cities Station ESK/CP/pim Enclosure cc: A. B. Beach, Regional Administrator, Region 111 R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident inspector, Quad Cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company M. E. Wagner, Licensing, Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden

( INP0 Records Center i