ML20134P232

From kanterella
Jump to navigation Jump to search
Provides Licensed Operator Training Staff w/NUREG-1021, Operator Licensing Exam Stds for Power Reactors, Interim Rev 8.W/o Encl
ML20134P232
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/20/1997
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
RTR-NUREG-1021 NUDOCS 9702250217
Download: ML20134P232 (5)


Text

.. . , _ _ . _ _ _ _ _ _ . _ _ _ _ _ __ _ _ _ _ _ . __ _ _ _ _ . _ _ _

  • -
  • M%g I uR3lTED STATES  !

?. -

?'. NUCLEAR REGULATORY COMMISSION -

lk a

REGloN IV  ;

611 RYAN PLAZA oRivE, SulTE 400

% . . . . . #[ AR LINGToN, texas 76011-8064

  • I FEB 2 01997 i

l Charles M. Dugger, Vice President i l Operations - Waterford 3 ,

l Entergy Operations, Inc, j P.O. Box B L Killona, Louisiana 70066

SUBJECT:

ISSUANCE OF INTERIM REVISION 8 OF NUREG-1021, " OPERATOR -

LICENSING EXAMINATION STANDARDS FOR POWLR REACTORS"

Dear Mr. Dugger:

[

The purpose of this letter is to provide your licensed operator training staff with an i advance copy of NUREG-1021," Operator Licensing Examination Standards for Power Reactors," Interim Revision 8. Due to the length of this document, a copy is attached only to our contact on your training staff listed below. Formal publication and normal  !

distribution is expected by the end of February 1997. Because this is an early copy, minor  !

font and pagination changes may be expected when compared to the distribution copy. i Also enclosed, to the same contact, is a single electronic version on diskette of the  !'

document in a compressed format. Additional electronic copies are available via the internet at URL http://www.nrc. gov /NRC/NUREGS/SR1021/index.html.

l As ncted in the formal publication of the interim revision, it will be required for initial license examinations administeiad 6 months after its publication date and may be adopted l

sooner at your option, if you have questions or comments, please contact John L. Pellet, Chief, Operations Branch, at (817) 860-8159.  ;

Sincerely, .

[ Kenneth E. Brockman, Acting Director j Division of Reactor Safety i Dncket No.: 50-382 License No.: NPF-38 cc w/ enclosures:

T. Brown, Operations Training Manager
l. Entergy Operations, Inc.

l Waterford-3 SES l' P.O. Box B

, Killona, LA 70066 i

l 1

9702250217 970220 PDR ADOCK 05000382 V PDR

Entergy Operations, Inc. cc w/o enclosures:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

. P.O. Box 31995 Jackson, Mississippi 39286-1995 i Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, !nc.

P.O. Box B Killona, Louisiana 70066 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc. ,

P.O. Box B l Killona, Louisiana 70066 Chairman Louisiana Public Service Commission  ;

One American Place, Suite 1630 l Baton Rouge, Louisiana 70825-1697 Director, Nuclear Safety & I Regulatory Affairs Waterford 3 SES l Entergy Operations, Inc. l P.O. Box B Killona, Louisiana 70066 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 l

E Entergy Operations, Inc. ,

Parish President St. Charles Parish P.O. Box 302 Hahnv;de, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502 l

l

r. '

Entergy Operations, Inc. I l

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) l bec to DMB (1E42) bec distrib. by RIV:

Regional Administrator Resident inspector ,

DRP Director MIS System l Branch Chief (DRP/C) RIV File  !

Project Engineer (DRP/C) DRS-PSB 1 Branch Chief (DRP\TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

S. Richards, NRR DOCUMENT NAME: G:\DRSLTRS\NURG1021\WAT.JLP To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with encbsures "N" = No copy l C:OB:DRS g ft AD:DRS N  ;

JLPellet M KEBrockman  !

Q'97 W 02/4/97 OFFICIAL RECORD col *Y l 1

4 i

i .

Entergy Operations, Inc. i E-Mail report to T. Boyce (THB)

E-Mail report to NR3 Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) bec to DMB (1E42) bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director .

MIS System Branch Chief (DRP/C) RIV File Project Engincer (DRP/C) DRS-PSB Branch Chief (DRP\TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

S. Richards, NRR r

\

DOCUMENT NAME: G:\DRSLTRS\NURG1021\WAT.JLP To receive copy of document, indicate in box: "C" = Copy weout enclosures "E" = Copy wth enclosures "N" = No copy C:OB:DRS g 4 AD:DRS N JLPellet M KEBrockman 02,$97 W 02/4/97 i OFFICIAL RECORD COPY l

250022

_