Forwards ALAB-106 Quarterly Rept for Apr-June 1981 Re QA & QC Programs
ML20003E052
Person / Time
Site: Midland
Issue date: 03/31/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
11522, ALAB-106, NUDOCS 8104020162
Download: ML20003E052 (31)


Text

_ _ _ _ _ _ _

e

  • Power O Consumers 0&f0f Generei Of* ices: 1945 West Parneal Road Jackson, MI 49201 * (5171 788 0452 Jarnes W Cook Vice Preside =st - Pro;ects. Engsneenng and Constructso e March 31, 1981 tn 4  %

Mr Victor Stello Director of Office of 31 m MIIE 311981 h

--E

-~,

Inspection and Enforcement kg u.s.m;ana N'58

  • mm ~

US Nuclear Regulatory Co==ission

- '}/

g Washington, DC 20555 <

- t g 8<"%

MIDLAND NUCLEAR PLANT - ALAE-100 m/

QUARTERLY REFORT DOCKEI NOS 50-329 A C 50-330 FILE: G.'.6 4 UFI: 70*01 SERIAL: 11522 Fursuant to the second and third conditions of the Mencrandu and Order AI AB-106 dated March 26. 1973, and Amendment No 1 to the Midland Plant Constructicn Permits, we are submitting ten (10) copies of our thirty-third

( 33rd) report covering the pericd April 1 through June 30, 1981.

e

/

WRE/1r

/

/'

CC: RJCook, USNRC Resident Inspector j' l Midland Nuclear Plant JGKeppler, USNRC Region III

) '

04 0 2 g l &.

t

CONSUMERS POWER COMPANY REPORT #33, MARCH 31, 1981 Pursuant to Conditions 2FB and 2FC of Construction Permits CPPR-81 and CPPR-82, the following report covers the period April 1, 1931 through June 30, 1981.

A. Construction work to be performed ouring the period:

See Attachment A.

B. Personnel with quality related duties who were assigned to the Midland Project during the period January 1 through February 28, 1981, and who are expected to be on site through March 31, 1981, and who will be trained as necessary to perform the functions required to them, are as follows:

1. Midland Project Quality Assurance TRCharette - NDE/ Welding, IE&TV ARGort - Fluids / Mechanical, QAE RFGuentensberger - Fluids / Mechanical, IE&TV FHSchulmeister Fluids / Mechanical, IE&TV JCShah - Civil, IESTV ,
2. Bechtel Quality Assurance / Quality Control RAubert - Quality Control Engineer, Mech / Piping FBevins- - Quality Control Engineer, Electrical DBunnell - Quality Control Engineer, Electrical NChapman - Quality Control Engineer, Mech / Piping CDake - Quality Control Engineer, Electrical BFulcher - Quality Assurance Engineer, Mechanical Chill - Quality Control Engineer, Mech / Piping RHuron - Quality Control Engineer, Civil JKnott - Quality. Control Engineer, Electrical JLewis - Quality Control Engineer, Electrical M0rr - Quality Control Engineer, Mech / Piping JRheinhardt - Quality Control Engineer, Mech / Piping SSmith - Quality Control Engineer, Electrical.

CSpinks - Quality Control Engineer, Electrical

3. B&W Construction Company No additions.
4. Project Management Office AJTselepis - Coating Specialist

C. Quality Assurance qualifications of supervisors and engineers listed in B above are attached to this report.

D. Changes The follow. -

no longer are performing quality-related tasks at the

1. Midland Project Quality Assurance
  • SRAndersen - Electrical / Mechanical, QAE (Graduate Engineer Training Program)

MFDewitt - Fluids / Mechanical, IE&TV

  • TLKoch - NDE/ Welding, IE&TV FAPimentel - NDE/ Welding, IE&TV K0Rafferty - NDE/ Welding, IE&TV RYet - Electrical, IE&TV
  • These persons were assigned to the Midland Project on a tempor-ary basis; their qualifications are attached to this report.
2. Bechtel Quality Assurance / Quality Control AAkbar - Quality Control Engineer, Mech / Piping

. RBryan - Quality Control Engineer, Electrical CCameron - Quality Control Engineer. Electrical WDaly - Quality Centrol Engineer. Welding PDiCarlo - Quality Control Engineer, Welding DGadani - Quality Control Engineer, Mech / Piping MGrima - Quality Control Engineer, Electrical DHallenbeck - Quality Control Engineer, Electrical JHamler - Quality Control Engineer, Mech / Piping WHodkiewicz - Quality Control Engineer, Mech / Piping ALobrovich - Quality Control Engineer, Electrical EMann - Quality Control Engineer, Electrical ENewman. - Quality Control Engineer, G.A.

JPetrosino - Quality Control Engineer, Electrical CUrbany - Quality Control' Engineer,-Electrical

3. B&W Construction Company-i No changes.

Further additions and deletions to the list of personnel with quality-related duties _will be noted in the next quarterly report.

I MIDIAND PROJECT QUALITY ASSURANCE L

t e

Attachment to ALA3-106 Quarterly Report

. Quality Personnel Resume NAME: Anderson Steohen R DATE : February 20, 1981 (Last) (First) (I)

ORGANIZATION: MIDLAND PROJECT QA EMPLOYEE NO. y/3 EDUCATION:

High School - Graduated June 1973 from American School Foundation Mexico D.F., Mexico College - September 1973 - April 1975 and January 1976 - April 1979 (graduated)

BS Mechanical Engineering, University of Michigan, Ann Arbor, Michigan WORK HISTORY:

06/79 - 02/81: Consumers Power Company, Graduate Engineer Training Program, Received exposure to all departments within PE&C: Midland PMO, ,

Campbell #3 Testing, Engineering Services, Construction Services, Labor Relations, Environmental Activities, Electrical Transmission Engineering and Construction, Generating Plant Modifications Department (assigned to JRWhiting Plant), Project' Controls and Administrative Services, Quality Assurance. Will obtain permanent assignment in March 1981.

05/75 - 09/78: University of Michigan Engineering Services, Assistant Mechanical Engineer for Plant Operations.

Ford Motor Company, Dynamometer Technician.

1977: Attended Spring / Summer Session at the University of Michigan.

05/76 - 09/76: Chrysler Corp. , Packaging and Packing Auto Parts for International i Export, Focklift Driver.

07/75 - 12/75: Hawaiian Rentals, Honolulu, Hawaii, Rental Agent and Service i Mechanic for Construction Equipment Rental Firm.

05/75 - 07/75: Yamaha of Hawaii. Service Mechanic.

05/74 - 09/74: Chrysler Corp. , Assembly Line Work.

06/73 - 09/73: Chrysler Corp., Assembly Line Work.

L-

Attachcent to ALAE-106 Quarterly Report Quality Personnel Resume NAME: CHARETTE, TONY R. part: 3/9/81 (Last) (First) (1)

,.3008 ORGANIZATION:

Midland Project Quality Assurance EMPLOYEE NO..

' EDUCATION:

1964-1967: Hammond Technical Vocation High School, Indiana; Vocational 1968 CED U.S. Army 1970 Purdue University, Calumet Campus, Indiana T

WORK HISTORY:

1970-1981: Graver Energy Systems, Inc., East Chicago, Indiana 1979-1981: QAE responsible for initiation and resolution of nonconformances, initiation ~ of inspection checklists, initiation of surveillance '

reports, documentation reviews and overseeing QC activities.

1979 QC Supervisor Field Construction responsible for construction schedules (inspections) and surveillance.

1978 QC Lead - RE Level II Point Inspection (Dry Film - Wet film) vendor surveillance 1972-1977: QC Inspector receiving inspection, dimensional inspection using 7.icrometers, calipers, tapes, protractors, etc. Inspection and testing of contalments, penetrations, piping, pressure vessels and standard

. products.

1974 - Visual examination level II, equipment calibration, MPE level I 1975 - HPE level II, LPE level I, LPE level II 1976 - QC lead - RE ' level II point inspection (dry film - wet film) vendor surveillance 1970-1971: Laborer, machine operator, burner, fitter Y

A

- Attach ent to ALA3-106 Quarterly Report

. Quality Personnel Resume NAME: cnre Ainn R DATE : 2/18/81 (Last) (First) (I)

ORGANIEATION: MIDLAND PROJECT OA E::?LOYEE NO. N/A EDUCATION:

1973 - 1977: Grandville high Schocl; Grandville, MI 1975 - 1977: Grand Rapids Junior College; Assoc Applied Science 1977 - 1979: Michigan Technological University; BSME

- WORK HISTORY:

-9/79 12/80: Goodyear Atomic Corporation, Piketon, OH; Project Engineer in Gas Centrifuge Uranium Enrichment Plant - Site Engineering Department; Part of a 15 member review and design team; Responsible to Project Manager for review and design of projects, quality assurance assess-ments, coordination of design changes between department, cost reduction, cost estimation; Responsible to Supervisor far safety analysis and relay of scheduling information for all projects in department.-

5/78 - 8/78 & Packaging Corporation of EAmerica, Div of Tenne ro, Grand Rapids, MI:

' 5/77 - 8/77 General Factory Worker.

4 u_ _

Attachment to ALA3-106 Quarterly Report

. Quality Personnel Resume NAME: GUENTENSBERCER, RONALD F DATE: 03/05/81 (Last) (First) (I)

ORGANIZATION: MIDLAND PROJECT OA EMPLOYEE NO.: NA EDUCATION: 1964-1968 - Reavis High School, Burbank, IL 07/78-11/78 - Spartan School of Aeronautics, Tulsa, OK (non-distructive testing)

, WORK HISTORY: 1978-Present - Conam Inspection, Itasca, IL Performed NDE inspection at the following Nuclear Power Plants in Illinois:

- Quad City, Dresden, Byron, Zion (Commonwealth Edison System)

- Qualified Level II in the following:

- Visual Examination

- Magnetic Partical Testing

- Penetrant Testing

- Ultrasonic Testing

- Radiographic Testing 4

m y y 'a

, a~-a -g -n-g-

Attachment to ALA3 '.06 Quarterly Report

. Quality Personnel Resume NAME: Koch Terry L DATE: 2/18/81 (Last) (First) (I)

EMPLOYEE NO. 748508 ORGANIZATION: MIDLAND PROJECT OA EDUCATION:

1962: High Scnool GED (USN) 1974 1975: San Jose City College; Major in Industrial Technology 1975-1976: Contra Costa College; Mejor in Nondestructive Testing 1977-1978: Athens State College: Major in Nondestructive Testing WCRK HISTORY:

7/80 - Pres: Bechtel National,Research & Eng Div; Engr Spec M&QS. NDT Level III PT, MT, RT, UT. Welding inspection procedures, training, certification, and consulting.

11/78 - 7/80: Lear Siegler Inc, Energy Products Div; Sr NDT Spec. NDT Level III &

Navships Test Examiner PT, MT, RT, UT. Procedures trainin'g certifi-cation, and consulting.

2/74 - 11/78: General Electric Co, Installation and Service Engg Div; QC Supervisor.

Implement requiremen'ts of northeast region QA manual during NGS outages, PSI & ISI NDT (Level II PT, MT, RT, UT) and Navships Test Exasiner RT,

=MT, PT.

Nuclear Energy Div; NDT/QC' Inspector. NDT Level II PT, RT. QC of Nuc Sensor Devices during fabricatiou.

l  : 12/72 - 2/74: .M W Kellogd, Power Piping Div (Diablo Cyn NGS);'NDT/QA Inspector.

QA and Welding Inspection during NCS NDT Level II PT, MT, RT.

Construction.

- 12/70 -_12/72:. Boothe Mobile Insp Co (Et A1); NDT Inspector. NDT Level II PT, MT, RT, Level I UT. Lab & Field NDT of aircraft and petrochemical structures.

6/65 - 7/69: -Stainless Steel' Products Ine; Radiographic Tech "A". Equivalent to NDT Level II'RT, PT. Film Interpretation Duties.

5/61 - 4/65 US Navy; Cunnersmate, Technician. Special weapons inspection and maintenance.

i l

L

Attachment to ALA3-106 Quarterly Report

- Quality Personnel Resume NAME: SCHULMEISTER, FRANK H. DATE: 2/20/81 (Last) (First) (I)

ORGANIZATION: Midland Project Quality Assurance EMPLOYEE NO. 77944 EDUCATION:

1974: Hazel Park High School; Architecture 1979: Lawrence Institute of Technology; Associates Degree, Industrial Superviaion WORK HISTORY:

1/81 - 2/81: Pennsylvania Engineering Corporation; Pittsburgh, PA; Cost Budget Controller. Duties: Documenting and procuring all issued contracts, monitoring daily activities and procedures, budget forcasting and '

estimating labor, material and equipment quantities.

3/79 - 4/80: The McDevitt Company, Brighton, MI; General Superintendent / Estimator.

Duties: Scheduling, supervise personnel, supervise and conduct all inspections, Quality Assurance, enforcing Quality Control, Specifications and Procederes, OHSA Standards, estimating and procuring total BID packages, expediting and reporting.

2/76 - 3/79: J.D. & M. Building Company,

Dearborn,

MI; Superintendent / Estimator.

Duties: Same as McDevitt.

5/76 - 2/76: Max Sabaroff & Company Incorporated, Detroit, MI; Estimator / Purchaser.

Duties: Quantity take-offs, procuring material specifications, parchasing.

8/74 - 5/75: E.R.B. Lumber Company, Birmingham, MI; Clerk / Draftsman. Duties: Shipping and receiving, drafting and purchasing.

4 =

Attachment to ALAS-106 Quarterly Report Oaality Personnel Resume NAME: SHAH, JAGDISH C. DATE: 3/6/81 (Last) (First) (I)

ORGANIZATION: Midland Project Quality Assurance EMPLOYEE No. '/78081 EDUCATION: '

1957-1963: The New Progressive High School, Mehsana, India; college prep; SSCE 1963-1969: M.S. University of Baroda, India; B.E. Civil 1970-1971: Brigham Young University, Provo, Utah; M. Eng - Civil Specialization: Structual Engineering Sanitary Engineering Advanced Soil Mechanics Foundation Engineering Experimental Stress Analysis / Advanced Pre-stressed concrete 1978 Registered Professional Engineer in state of Michigan C #25373 WORK HISTORY:

1978-1981: McNamee, Porter & Seeley, Ann Arbor, MI; Resident Engineer; Construction inspection; on-site caisson - supervision; reviews of construction plans & specifications, Quality Assurance of concrete

& soils.

1976-1978: Reilly Construction Inc., New Hudson, MI; Project Manager; estimating and quantity take-offs; construction ar.d engineering of water & sewer excavation, site development and earth moving projects.

1975-1976: M & B Contracting Corp, Novi, MI; Project Engineer; quantity take-offs, summarizing bids, estimating / checking. shop drawings, etc.

1973-1975: B & V Constructicn Inc., Novi, MI; Project Engineer; Cost Analysis quantity take-offs; construction management of highways, flood control facilities sewer, water mains, excavation & site development projects.

1971-1972: Pittsburgh Testing Laboratories, Cleveland, OH; Civil Engineer; Qaulity Assurance of concrete & soils structures at Davis-Besse Nuclear Power Plant construction at Oek Harbor, OH.

1970-1971: Brigham Young University, Prevo, Utah; Engineering Technician, Engineering and Design of :tdvanced structual problems. Experimental stress analysis ncndestructive testing of structures testing of concrete.

1969-1970: Public Health Circle, Gujarat State, India; Junior Engineer, Cecign and Construction; on the job training in design and coristruction of regula-tory structures, water distribution and collection, preparing plana and cost estimates of civil engineering projects..

e 9

a BECHTEL QUALITY ASSURANCE / CONTROL c

l t

A t t i,cl.nA n t to ALAB-106

  • Quarterly Report Quality Personnel Resume AUBERT, RICHARD S. DATE: 3/6/81 NAME:

(Last) (First) (1)

ORGANIZATION: Bechtel Quality Control EMPLOYEE NO.: 757823 EDUCATION: .

1973-1974: Magruder High School, Rockville, MD 1974-1976: Pioneer High School, Ann Arbor, MI; diploma 1976-1980: University of Michigan, Ann Arbor, MI; College of Engineering B.S. Engineering - Mechanical Engineering WORK HISTORY:

1981 Bechtel Power Corp., Ann Arbor Power Division, Midland Jobsite

. Quality Control Engineer, Piping and' Mechanical ,

1980-1980: U.S. Army Corps of Engineers, Detroit District; Civil Engineering Tech., Supervisor: 'Ron Wilshaw* -

' Duties: surveying, river flow measurement, boat operation and maintenance, data reduction and report writing.

1979-1979: U.S. Army Corps of Engineers, Detroit District, Civil Engineering Tech. - Supervisor: Jerry Nahas Duties: surveying,- river flow measurement, boat operation and

~ maintenance, data reduction and report writing.

1978-1978: U.S. Army Corps of Engineers, Detroit District, Civil Engineering

' Tech. Supervisor: Jerry Nahas -

Duties: surveying, river flow measurement, boat operation and maintenance, data reduction and report writing.

l j 1977-1977: U.S. Army Corps of Engineers, Detroit District,- Engineering Aid Supervisor: Robert Gregory Duties: data reduction, office work and various odd jobs. - .

~ 1977-1977: Sears Roebuck & Co., Automotive Department, Ann Arbor, MI Supervisor: Lawrence Fitzgerald Duties: supplying parts for mechanics, ordering out of stock parts l

taking inventory, charging batteries, stocking sales flo'or,

. organizing, arranging and maintaining stockroom.

e

  • O e

h.

Attachment to ALAS-106 Quarterly Report Quality Personnel Resume BEVINS, FLOYD DATE: 3/4/81 NAnz: T (Last) (First) (I)

ORGANIZATION: Bechtel Quality Control EMPLOYEE NO.: 0384 EDUCATION: -

1956-1960: Hesperia High School, Hesperia, MI; on the job training courses for 4 years in Air Force in Electronics and Quality Control on air craft.

+

WORK HISTORY:

, 1977-2/81: Commonwealth Association, Lead Inspector.on. transmission lines .

on NPPD project, 345 KV in Nebraska; CV project, 400 DC line in ,

North Dakota and Minnesota. .

1976-1977: L.E. Myers Co. (Saudi Arabia); Training and supervising local perscnnel and other nationalities in constructing transmission and distribution lines.

1975-197.6: Midland Electric Co.; Lineman installing overhead and under-ground distribution; electrician in steel mill instelling conduit, tray, switch gear, cadwelding, running wire and termination.

1973-1974: L.K. Comstock Co., electrician on Ferme, Unit II, Monroe, MI; running tray, wire,. installing anchors, conduit, switchgear, cadwelding, and termination of wire. -

1968-1973: L.E. Myers; Linesman working on transmission line; all phases.

l O

e 4

Attachment to ALAS-106 Quarterly Repore

. Quality Personnel Resume NAME: BUNNELL DAVID D. DATE: 3/6/81 (Last) (First) (I)

ORGANIZATION: Bechtel Quality Control EMPLOYEE NO.: 0739 EDUCATION:

1964-1967: Jackson High School, Jackson, MI; graduate 1968- Weapons and Munitions course, McConnel Air Force Base, Colorado WORK HISTORY:

Background of over 7 years of electrical drafting and junior grade level sub-professional design for electrical substations, including wiring and instrument and control work.

Experience: Gilbert / Commonwealth since,1973.

1977-1981: Designer ' responsible for' electrical and civil / structural detailing for cable trays, cable routing for distribution systems, station layouts, sections and elevations, wiring diagrams, I & C drawings and grounding for Colf States Utilities Company's Cypress 500 kV Substation and Goslin 230 kV Substation; City of Anderson, Indiana's

, Hazelwood and 53rd Street Substations; and U.S. DOE's Gas Centrifuge Expansion Project.

1973-1977: Draftsman responsible for preparscion of detailed drawings from sketches and data provided by Senior Designers and Engineers for Iowa Public Service Company's Raun, Duck Creek and Tazewell 345 kV Substations and U.S. DOE's Cascades Uprating Project.

-1968-1972: United States Air Force; Sergeant - weapons and munitions, Served at Lackland Air Force Base, Texas; Shaw Air Force Base, Kansas; Sumter Air Force Base, South Carolina; Thailand and Viet Nam.

e

',_. , A

_ -- = ._ _ --

g.. ;. : : < i ; y r.t ; e r t Quality Personnel EcFume cA7E: 81

.. NAME: CHAPMAN. ___ROBERI _- N. -

(LEt) (First) (1)

EM R OYEE NO.: N 978 ORCArJIZATION: Bechtel Quality Control EDUCATION: -

1947-1950: Midland High School, Midland, MI 1951 Michigan. Technological University i-voRK HIST 0RY:

' 1981-1981: Bechtel Quality Control Engineer; inspect hangers (Januapy,1981-pres.ent) 1972-1980: Engi'neering Projects Supervisor for design and specifica,tions for ,

various projects and taking them through constructiort, inploding some inspection; Dow Cfiemical Co.,' Michigan Division.

1962-1572: Fire Protection Engineer specifying ~ fim protection requirements for

.(,J '*

all buildings in Michigan Division and acting es liaison between -

Dow and the, insurance carrier. .Some inspection work.

- 1960-1962:- ' Site Project Engineer doing Quality Cor trol work; Dow Chemical Co.

1951-1960: Design Engineer doing piping laycut and design and equipm;ent. layout .

and design; Dow Chemical Co.-

k -

. - -; - . , {, .

% #9 .

6 b F

  • O e
  • 3 ,

1 * .

  • ' e

. . . . . . 4

  • ~

(4 * . - ,

. e y _ e dO, 6

- De

~

c.; ,

V t * *whf 4- e a h- . Yr y -+v -

p~* '9 v19 tw -

    1. 9

////f 8%

h'86>$@1+ ~$

/f S'$

t'++ > .. e. .. <e TEST TARGET (MT-3) 1,.  %'*4 l.0 5HaLu EEE I.l E 5 Ele .,

1.8 hf

=

1.4 1.6

/ 4 6" -+

ry%% ++sp f'g,'h// ig,,h},$.

\ .. _ _ - _ _ _ _ . _ _ ____ _____-______-_ ________ ___-_-__-___--

m

'4 #$

+ --

TEST TARGET (MT-3) l.0 's HM EM E!N M ll ['8 Ese .,

1 1.25 IA g I.6 i - s.. =

p% 4 //h

?tf,,h/ .

b}Jlk.

Attachment t o A1./,5- l O 6

  • Quarterly Report Quality Personnel Resume DAKE, GARY L. DATg: 3/4/81 NAME:

(Last) (First) (1)

Bechtel Quality Control ggptoygg 30, 373-56-8632 ORGANIZATION:

EDUCATION:' -

1966-1970: E. J. High School, Jackson, MI WORK-HISTORY:

3/78-1981: Consumers Power Co. , Senior draftsman engineering discipline Electrical Engineering distribution sub' station design section Responsible for design substations, property plans, PD & WD schematic, estimate GWO, order material' for construction, bill of P

material, work in field with construction sometimes to correct problems they encounter in the field and check work of lower rated employees, electrical la~y outs, foundation layouts, subsigns, etc.

4/71-3/78: Consumers Pcwer Co. , Junior draftsman Electrical Engineering distribution mapping section Responsible. for mapped overhead and underground distribution and equipment, tax code, site ' lighting, fuse and load and blank maps; check work of lower rated employees

-Worked 5 weeks at Palisades plant for RAD project 1976 during shutdown.

S e

e e

O o

O O

+

G

, :ui ..m :,c A;A -::e Cuar:er ly ?eport Quality ?ersonnel resure FULCHER, BRYANT D. :373; 2/20/81 NAYE:

(Last) (First) (1)

Bechtel Cuality Assurance gg7tgyr 33,: 777936 ORGANIZATION:

EDUCATION: 1941: Lockport High, Lockport, NY; Mechanical / Technical; Educational Training has been completed in categories, ICS (Correspcndence Schools), A.S.O.C.

and other professional societies training; company sponsored training schools and Institutional programs.

WORK HISTORY:

1972-1980: Colt Industries; Quincy Division, Quincy, IL; CA Manager 1969-1972: General Elsetric dircraft Engine Grp., Lynn MA/Evendale, CH; FCAR/FPCE (Field Quality Assurance Representative / Field Process Control Engineer) 1967-1969: McDonnell-Douglas Astronautics Div., Santa Monica, CA; Reliability Field Assurance Representative 1962-1968:- Boeing Aircraft, Morton, PA; Quality Field Representative and Senior Quality Analyst. .

~1957-1962: Fulchers Kendall Service; self-employed 1954-1957: - Twin Coach Aircraft; Buffalo, NY; Installation and Service Manager ,

1950-1954:- Bell Aircraft, Buffalo, NY; Machinist (Gears) 1948-1950: Alsco Alum; Lockport, NY; Installation and Service Manager 1941-1948: Harrison Radiator Div. GMC; Lockport, NY; Receiving Inspection &

1941-1941: Chevrolet Motor & Axel Div., Tonawanda, NY; Receiving Inspection &

i Test Cell Inspection. (Transfer to H.R.D. of GMC.)

1938-1941: .Dittrer Gear; Lockport, NY; Machinist (Apprentice program) e e

O 4

mm

n ; d.2 n t to .LAL-106

  • Cuarterly Report.

Quality Personnel Resume N,us: HILL, CHARLES DATE: 2/20/81 (Last) (First) (I) 758155 ORGANIZATION: Bechtel Quality Control O!PLOYEE NO..

EDUCATION:

1943-1947: Brandon High School, Motherwell, Scotland 1968-1969: Government Training Centre (Engineering) 1974 Magnaflux Corp Chicago NDT Course 40 Hrs.

WORK HISTORY:

1980-1981: U.S. Testing - St. Lucie II Nuclear Flant Florida, QC Inspection Level II; Visual, welding and piping,- magnetic particle, and liquid penetrant, weld inspection of piping and restraints; April through January,1981.

~1979 NDTS Power Systems - DC Cook Nuclear Pridgman,'HI. QC Welding Inspector Level II - Performed duties in all areas of plant on outage repair Unit #2 froa start to final package turnover to Indiana & Michigan Electric. September - December.)

1978-1979: Wismer and Becker - Enrico Fermi Nuclear Newport, MI. QC Welding Inspector Level II, performed duties in all areas of plant, working to

.ASME, ANIS, AWS, ASTM, 10CTR50 Codes. (August,1978 - June, 1979) 1972-1978: Magnaflux Corp. De Cook Nuclear Plant Bridgman, MI. Level II; HT and l

PT and assistant radiographer, worked in all areas of plant and on all critical systems, also worked in-service inspection in 9 dif ferent Nuclear Power plants throughout the country for Westinghouse, General Electric, Commonwealth Edison, Philadelphia Power & Light, Consumers Power, Indiana & Michigan Electric. (February, 1972 - March, 1978) 1969-1971: Benton Harbor Engineering, Benton Harbor, MI. Setting / operating milling machines working to fine tolerances with prints. and using vernier tools to ensure quality work for_ Hydraulie Equipment Companies throughout United States. (July, 1969 - August, 1971) 11957-1968: Miller Construction Co. - Scotland. Worked in cunstruction of building steel strip mill, also melting furnace maintenance and repair.

(May., 1957 - December, 1968) 1949-1957: Royal Navy - Engineering / Mech. I worked in boiler and engine rooms, also assisted in engine and boiler repairs with engine room artleifers.

(September, 1949 , March, 1957) b 9

e w -

my owe r w --

. e is t ; o ct.me n t t o /.L/.L-106 Quarterly Report Quality Personnel Resuma pry 2 HURON, RANDY C. DATE: 3/4/81 (Last) (First) (1)

Bechtel Quality Control 7E7475 ORGANIZATION: EMPLOYEE NO.:

EDUCATION: .

1968-1972: Robert E. Lee High School

~

1972-1974: Lee College; Liberal Arts 1974-1980: Texas A & H; B.S. Building Construction WORK HISTORY: . .

6/,76-8/76: Fullco Inc., Enqineering Assistant Worked directly for general foreman in forming pre-fabe'on a fossil fired 200 MV power plant; r,ead plans and blueprinta for fabrication.

6/75-8/75: Brown & Root, Inc., Engineering Assistant Worked directly with civil engineering; survey work associated ~ ~

with concrete forming and installation; reviewed drawings and -

engineering specifications for proper installation of structural

. steel installations for building erections.

6/74-8/74: Triple B Co.p., Engineering Assistant -

x-Surveying, : interpreting drawings for proper installation of civR type work. Witn,essed sampling and verified proper installation per engineering ~ specifications.

  • t
  • +.-

e q, .

  • * . e
  • e N
  • m a

, b

.. =~

o ,

- ~ ~ '

. p y y y - , , ,

Attachment to ALAE-106 Quarterly Report Q.:ality Personnel Resume NAME: KNOTT, JOHN L. DATE: 3/8/81 (Last) (First) (1)

ORGANIZATION: Bechtel Quality Control DIPLOYEE NO. 4737

' l EDUCATION:

1944 Royal Oak High School (Summer school) Royal Oak, MI l 1944-1948: Ithaca High School, Ithaca, MI; diploma 1948-1949: Central Michigan, Mt. Pleasant, MI; Lab tech course 1949-1950: Alma College, Alma, MI; no degree 1950-1952: Deforest Training (DeVry) degree of, science & technology kiORK HISTORY:

1981 Bechtel QA Gilbert / Commonwealth - Consumers Working for Gilbert / Commonwealth; contracted to Consumers Power; Loaned to Bechtel as an inspector in QC.

'1979-1980: Gilbert / Commonwealth, Nebraska; Inspector for Nebracka Public Power District in material handling, clipping, spacing, jumpers, sagging, boxing, & erection of towers, spotting water bars & cross ditches right of way clearing and restoration.

1978-1979: 'Cilbert/ Commonwealth, North Dakota & Minnesota; Inspector for (

CPA-UPA traclesg wire in the control room, tower foundations in swamps l

! installation of a neutral cathode ground system of A i 400 kV D.C.

.line, ground resistance tests.

1977-1978: Gilbert / Commonwealth, Paducah, Kentucky; Union Carbide Uranium'up-

- grading plant; inspector of cable pulling, termination, hypotting, meggering & misc. substation inspection work.

i Gilbert / Commonwealth, Michigan; Designer for Detroi.t Edison on blow-1977 down tanks.

{ 197_4-1976: Misc. Design work at Gilbert / Commonwealth office "4" cleared area l

for cascade upgrading project of three uranium upgrading plants in Paducah, KY; Dak Ridge, Tennesee; & Portsmouth, OH. Also included l survey work in North Dakota at the coal creek plant.

j 1970-1973: Designer transmission and substation departments, CPM (Critical Path)

' Took radio, TVI, and audio readings along transmission lines; tested relays and circuit breakers; survey work.

1964-1969: Transmission Department; checked tower design, spotting towers; madrsag expansion charts and computer programs for sag cM rts; took radio influence surveys in Indiana, Arkansas, Mississippi, Louisiana and Texas.

Sparton Electronics, Jackson, MI; testing sonobuoys and making test

) 1963

[ equipment to test sonobuoys.

! l l

Attach =ent to ALAS-106 Quarterly Report, Quality Personnel Resume Page 2 KNOTT, JOHN L. DATE: 3/8/81 NAME: __

(LL;t) (First) (I)

ORGANIZATION: Bechtel Quality Control EM7LOYEE NO.:

EDUCATION: .

L'ORK HISTORY:

1,958-1963: Self employed, gas station, grocery store, repairing television and painting barns.

5956-1958: Telephone Engineer for Western Electric,. Cicero, IL; working on the expansion of telephone offices in the Los Angeleg California area choosing equipment designs and wire hook-ups for installers.

1955-1956: Bell Labs, Alaska; Radician; Radar Technician; one of five people to run a radar station on the' DEW (Distant Early Warning) line which includes k'eeping 4-60KW diesel gener.ators running.

e 1952-1954: Western Electric, Cicero, IL'; testing An/ Arc 27 transmitters and

' receivers.

1950-1951: - Standard Transformer Corporation (Stancor); foreman of an assembly

~

line building transformers.

- 1950 Misc. pa'rt-time jobs.while attending school.

ik m

- e. . - - . , -- --.p. , y-.- - + -y g -

Attacheent to ALAS-106 Quarterly Report

. Quality Personnel Resume gg. LEWIS, JAMES N DATE: 3/4/81 (Last) (First) (I)

ORGANIZATION: Bechtel Quality Control EMPLOYEE NO. 757937 EDUCATION:

1972-1976: Monroe Central High School, Parker City, Indiana 1976-1980: Purdue University; B.S. Engineering (Construction)

WORK HISTORY:

May 1980-August 1980: Indiana Construction Corp., Assist. Project Engineer Overseeing of construction activities and management of labor forces. .

May 1979-August 1979: Indiana Construction Corp., Field Engineer Setting of building bench marks and building control work

. points. Design of.stormwater run-off system.

May 1978-August 1978: Indiana Construction Corp., Construction Engineer Various office engineering duties May 1977-August 1977: Indiana Construction Corp., Field Engineer Charge of concrete test cylinders and field time sheets.

May 1976-August 1976: Lewis Construction Co., Carpenter

} May 1975-August'1975: Lewis Construction Co., Carpenter-May 1974-August 1974: Lewis Construction Co., Carpenter

! May 1973-August 1973: Lewis Construction Co., Carpenter

}

{

i I

L f

L j' ,, , , , . . ,---. . - _ . , -- -

. Attachment to ALA3-106 Quarterly Report Quality Personnel Resu=e pag : ORR, MICHAEL H. 3373 3/9/81 (Last) (First) (I)

Bechtel Quality Control 758163 ORGANIZATION: EM?LOYEE NO..

EDUCATION:

1963-1967: Manistique High School, Manistique, MI; diploma 1967-1968: Western Michigan University, Kalamazoo, MI; no degree

. WORK HISTORY:

1980-1981: General Tire Chemical Plastics Division; Millwright; maintenance, repair and erection of 2000 ton hydraulic presses; resin mix equip-ment and boiler plant.

1979,-1980: Warner Fiberglass Products, Inc., Millwright; design and construction of tank mold turning fixtures and equipment and resin injection equipment.

1979-1979: Self-employed and G. Fare Concrete Construction; heavy equipment mechanic andoperator of land clearing and excavation jobs; jobbidding estimating, and scheduling.

1976-1979: F. Jensen Chevrolet, Inc., parts and service manager.

1973-1975: Manis"ique Rentals, Manistique; Manistique Saw and Planing; G. Slining Excava ting Earthmoving and Logging Equipment, Maintenance and operation.

1969-1973: U.S. A r Force; Helicopter Machanic/ Crew Chief; inspect and repair helicopters and mid-air recovery systems.

::t: 1y .h,ct:  !

I

' ' ' quali:y Tersce.,el Ec5r-e .

RhL .'t' ROT, ,ERRY W u,,7I : 3/6/81

p. .r . -

( ast) (Tirst) (1) i

r

757904 Secntel cuality Centrol m Lover

- - -- 93.. -

,.... . M..,, 2 1CH

.y.m f

- t IDUCATION: i 1 .. . , * .

' 1936-1960: Mt. Vernon High School, Mt. Vernen, Indiana; diplo.a 1960-1961: Pilitary training in pnetratics, hydraulics, aerodyna=ics, corsputer

' logic, precisien optics, flight control syste=s, guidance theory ~

j icluding gyro theory etc., Missile syste=s analyst t aining,

! 1970-1977: University of Evansville, Esansville, Indiana; 2 years of study pursuing Bachelors of Liberal studies. ,

I i

7 tCRK HISTORY: ,

1980-1950: Science Applications, Inc., Independent consultant assigned to CC

  • group for .iclede Edison at Davis Sesse Nc.1. f.pril _ seye:ter,1953, 3

'~

1978-1980: 3abeock 'and"Wilecx . Construction Co. , Assistant- OC stpez41scr .at -

Midla.nd, MI 1977-1975: Mid estern Distributing Co and Signal Delivery Service; truck 7

j(, driver, bcrder to border and coast to coast.

1977-1977: Mercury Petal Products, Inc. , Fore:an; =etal forning and starping', - ~

dip stick and guide tube de; art =ent. .

1974-1976: Eabcock and Wilecx.Co. , Inc. . Laycut can; nuclear co panent_ 'fabrica-i.

tion; dispatcher . for producticn centrol and contract spcasor. . . . -

1967'-1974: East 5an Kcdak Co. , Service representat'ive for nicrogr$;: hies di' lon ' '

i and roller z transncrt e division. - . d 5.'?

1964-1967: CecrgeKochandSons,Inc., Machine' operator,then, layout ~d.

an fer ' ' " ^^

'. -4 2 ~ M, ~ ,N; i.

~ ~

!- prefab. of structural steel. .

t 1960-1964: U.S. Air Tcree; Missile .

Systers.. Analyst on AGM-2SS

,- '-(Hound

. =* *:- . . , ,;. Cg , P r sile).-  :,. .., ,

, s - -

-' ~ se - .- . ' '

~'

9.,. ~

s

e. .

g.

  • . .g .

.,'. - , ~, , , - * ,. - -;, , _

7

..n..=

-- + .- .- . .-

t.

.. ~

. 1.. .;-

.- t

  • ,'  !. *.  ; .,a -

~.

s .

, 4 ,

I i

~% .%. i

  • t

- .. ~ ,

s ..

L: .

r * *

  • e , . , . .., ~ ~.,
  • l
  1. E

' t- .

~;

/* *1 .

  • *g--

r

~ . , * ~ . :, ,,,.j

~ a O M g S

.m k

~..

At:achcent to ALA3-106

  • Quarterly Report 1

Quality Fersonnel Kesure NAME: SMITH, SHAUNA K. DATE: 3/10/81 (Last) (First) (I)

Bechtel Quality Control EMPLOYEE NO.. 664592 ORGANIZATION:

._ED_UCATION :

1971-1976: Worthing High School, Worthing, Sussex, England 1976-1978: Worthing College of Technology, Worthing, Sussex, England; ordinary

. national diploma in technology (engineering) 1978-1979: University of Surrey, Guildford, Surrey, England; B.S. (Hons) Civil Engineering (First year) 1979-1981: Michigan State University, East Lansing, MI; B.S. Civil Engineering (Second _and Third years, including one year of co-operative education)

LWORK HISTORY:

1981-1981: Bechtel Power, Midland Jobsite, QCE Electrical; certified in inspection jagggg{- of anchor bolts and cable pulling, co-operative education student.

1980-1981: Bechtel Power, . Ann Arbor office, Project / Engineering; planner, schedule -

preparation including calculations, drafting, printing, distribution,

' etc. , co-op student, _4/80-9/80 & 12/80-1/81.

1980-1980: J. T. Mackley & Co., LTD; Assistant site engineer, part of a survey team ,

during the construction of sewage treatment project, summer hire, '

6/80-9/80.-

1979-1979: J. T. Mackley &- Co. , LTD; draftsman, updating and combining drawings, keeping records to cube ' tests, involved in preparation of bills of quantity, bending schedules, minor design, surveying notes, etc., ,

summer hire,' 6/79-9/79.

~

C 1 e a

1 e

o I

- e w

h a y .p r-,%. ,,..,u ,,e.- , - -r .v -

y y'~

,,, ., , ., ,,pm. , , , . . , . ,of ,., .,.r,w.m,. y., - ,--w-, , o.4-, ,--ec...

Attach:2nt to 3.LA5-106

... - Quarterly Report Quali ty Fersonnel Resune SPINKS, CHARLES L- DA7g; 3/9/81 NAME: ._

(Last) (First) (1)

Bechtel Quality Control EMPLOYEE NO.: 595767 ORGANIZATION:

EDUCATION: -

1951-1955: Fair Park High School, Shreveport, LA 1960-1961: U.S. Army Nuclear Power Plant Operators Course; Ft. Belvoir, VA Military / Vendor training - Hi Vo'ttage cable splicing, GE Protective device maintenance and calibration, multi-amp inst., power systems protection coordination, multi-amp inst., Facilities Engineering Management, U.S. Army Management School; Family Housing Management U.S. Army Mangement School; Pole line construction, U.S. Army '

Engineer School; Pole line design, U.S. Navy Seabree Schools, Radiological Protection Officer course; U.S. Army Chemical School Quality Assurance Program Management, U.S. Army Management School 1980-1980: Student University of Texas, El Paso (August - December,1980)

WORK HISTORY:

1980-1980: Electrical QC Inspector Davis Besse NPS, Toledo Edison Co., inspected April'- and verified station electrical and instrumentation maintenance and July calibration tests and procedures for required in-service inspections during refueling. -

19,78-1980: Electrical QCE, Bechtel, Midland; certified level I in all PQCIs.

Worked as QCE through June,1979. . Worked as discipline I/O coordinator July through December,1979. Worked as QC T/0 coordinator January

-through March, 1980.

1960-1978: U.S. Army Nuclear Power Program; qualified as 1st and 2nd class operator prior to certification as shift supervisor; majority of utilization during military. career was in inspectiun and inspection management of plant electrical systems / equipment installations during construction of new Army nuclear power plants and modifications to existing plants. Also utilized as Electrical. Shop Supervisor in

~

numerous Army plants and as. Senior Instructor -in Electrical Specialty

' training of the Operator / Maintenance Specialty Course, U.S. Army

j. Nuclear Power-Program.

i .

e 4

e 9

^

O A

6 PROJECT MANAGEMENT OFFICE s

I 1

e

}

1 a ., , - --- ,,,, , - ,~..w. ..-,.c_. , .. _ m. - m v

Atta hr.ent to ALAB-106 Quarterly Report

. Quality Personnel Re ume NAME: Tseleois Arthur .T DATE: 2/18/81 (Last) (First) (1)

ORGANIZATION: PROJECT MANAGEMENT OFFICE EMPLOYEE NO. N/A (C0ATING CONSULTANT) ,

EDUCATION:

1972 - 1974: Parkway West Area Technical School, Oakdale, PA - Graduated with a Certificate of Achievement in Research Laboratory Technology.

1974 - 1976: Pennsylvania State University, Beaver, PA Campus - Majoring in Chemistry.

1976 - 1978: University of Pittsburgh - Majoring in Chemistry (Degree incomplete)

WORK HISTORY:

Prior to employment with KTA in August 1978, Mr Tselepsis worked as an Intermediate

' Laboratory Technician in the Coatings Division of Mobil Chemical Corporation (May 1976 to August 1978). This provided him with a substantial background in protective coatings.

.As a KTA employee, Mr Tselepis has gained considerable experirace in the inspection of coatings applied to nuclear and non-nuclear facilities as follows:

Nuclear: August 1973 - April 1979: Shoreham Nuclear Station, Wading River, NY Oct 1979 - Feb 1980: Beaver Valley Unit II, Shippingport, PA Feb 1980 (1 week): Enrico Fermi, Monroe, MI Feb 1980 - Present: Shcreham Nuclear Station, Wading River, NY Mr Arthur Tselepsis was certified at a Level II coatings inspection capability in accordance with ANSI N45.2.6 on October 5, 1979.

Non-Nuclear: May - June 1979: Ormet Aluminum Co, Hannibal, OH June, Aug 1979: Standard Pipe, Kearny, NJ

' . July 1979: Monroeville Park Tank, Monroeville, PA July 1979: Intercontinental Terminals Co, Houston, TX Aug - Sept 1979: Republic Steel, Cleveland, OH i

Page 1 of 2 March 13, 1981 OUARTERLY REPORT APRIL 1981 THROUGH JUNE 1981 PROJECT WORK SCHEDULE

1. Complete the installation of the tilt mechanism in the Auxiliary Build-ing fuel pool.
2. Concinue the installation of missile shielding thrcughout the Auxiliary Building.
3. Continue the installation of piping, hangers and raceway throughout the Auxiliary Building.
4. Start fire-proofing in the Control Access Area of the Auxiliary Build-ing and Evaporator Building.
5. Begin fuel pool hydra in the new and spent fuel pools.
6. Complete the installation of the fuel racks and the storage stand base in Containment #2.
7. Continue the installation of piping, hangers and raceway in Containment
  1. 1 and #2.

~S. ' Start Reactor Vessel Closure Head.

9.- Start upending transfer cars Unit #1.

10. Start installation of RC pump snubbers in Unit #1.
11. Start Fuel Racks and Storage Arm asse=blic: in Unit #2.
12. Complete upended transfer cars Unit #2.
13. Continue the installation of piping, hangers and raceway throughout the Yard facilities.
14. Continua the installation of piping, hangers and raceway throughout the Turbine Building.
15. Complete setting mechanical and electrical equipment in the Diesel Generator Building.

~

16. Complete setting mechanical and electrical equipment in the bottom por-tion of the Dow Condensate pumphouse.
17. Cor . L ue installation of pipe and raceway in the Dow Pump structure.

Page 2 of 2 March 13, 1981 OJARTERLY REPORT APRIL 1981 THROUGH JUNE 1981 PF0 JECT WGRK SCHEDULE

18. Complete Settlement Test on Tank Farm.
19. Start Calibration Facility.

2 0. - ' Complete Cooling Tower s..v.cture in Yard,

' 21.- Continue the installation of electrical wire and cable.'

22.- Continue the installation of HVAC duct and supports in all areas.

s