Responds to Generic Ltr 85-02 Re Recommended Actions to Assure Steam Generator Tube Integrity & Rupture Mitigation. Facility Steam Generators in long-term Dry Layup Since Project Shut Down in Jul 1984
ML20127A990
Person / Time
Site: Midland
Issue date: 06/17/1985
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Thompson H
Office of Nuclear Reactor Regulation
References
33309, GL-85-02, GL-85-2, NUDOCS 8506210318
Download: ML20127A990 (2)


Text

.

CORSumerS Power James W Cook Vice President - Projects, Engineering and Construction General offices: 1945 West Pernell Road, Jackson, MI 49201 * (517) 78& O453 June 17, 1985 Mr Hugh L Thompson Director, Division of Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20655 MIDLAND ENERGY CENTER DOCKET NOS 50-329.AND 50-330 GENERIC LETTER 85-02 FILE: 0505.21, 1300, EN005.1, SERIAL: 33309

Reference:

Generic Letter 85-02, Staff Recommended Actions Steaming from NRC Integrated Program for the Resolution of the Unresolved Safety 4,

Issues Regarding Steam Generator Tube Integrity, dated April 17, 1985.

Generic Letter 85-02 requested that applicants for an operating license furnish a description of their overall program for assuring steam generator tube integrity and for steam generator tube rupture mitigation. The

' description should be sufficiently detailed to allow the staff to compare these actions with the staff recommended actions attached to the generic letter. Additional information is requested on supplemental tube sample inspections.

The Midland steam generators have not been subject to vetting since delivery to the plant site, thus the concerns in the letter for tube bundle exposure to air are not germane. The preservice inspection of the steam generators was completed prior. to the Project shutdown in July 1984 but did not include the specific visual inspection requirements contained in the Generic Letter.

The current status of the steam generators is that they are in long-term dry layup.

i 8506210318 850617 PDR ADOCK 05000329 4

9

}0 A

PDR IO oC0685-0010A-MP02 i

a

m o

s 1

2 The current project status does not at this time support the development and implementation of. program requirements responsive to the subject generic i -

letter. We will track this as a future commitment for when and if the j

Project is restarted.