Submits ALAB-106 Quarterly Rept 47.No New Individuals Assigned quality-related Duties Since Last Rept.No Const Activities Projected for Apr-June 1985.Next Rept Will Be Sent in June 1985
ML20117J676
Person / Time
Site: Midland
Issue date: 05/07/1985
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
ALAB-106, NUDOCS 8505150176
Download: ML20117J676 (2)


Text

_

[

q

@ Consumers-Power James W Cook 0

Vice President - Projects, Engineering and Construction General offices: 1945 West Pernell Road, Jackson, MI 49201 e (517) 78&O453 May 7, 1985 Director of Office of Inspection and Enforcement Att Mr James Taylor US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 QUARTERLY REPORT, #47 i

DOCKET NOS 50-329 AND 50-330 FILE:

0.4.6 SERIAL

32263

References:

a) Letter, J W Cook to R C DeYoung, ALAB-106 Quarterly Report, Serial 30330, dated June 30, 1984 b) Letter, J W Cook to Harold R Denton, Miscellaneous Licensing Issues, Serial 31655, dated September 11, 1984 c) Letter, D G Eisenhut to J W Cook, Request for Deferral of Miscellaneous Licensing Matters During Construction Shutdown, dated February 5, 1985 Reference a) transmitted report #46 which provided data on personnel with quality related duties assigned to the Midland Project during the period April 1 through June 30, 1984 and the projected construction schedule for the period July 1 through September 30, 1984. On July 16, 1984 the Project was shut down.

Reference b) requested that further ALAB-106 reports be deferred until such time as the project was restarted. No reports were made during the interim between the request of reference a) and the response provided by reference c).

No new individuals have been assigned quality related duties since the last report (reference a); thus no resumes are required for this report.

Construction at the Midland Energy Center has been shut down since July 16, 1984. Various letters, meetings and reports have documented the project status. No construction activities are projected for the period April 1 1985 through June-30, 1985.

8505150176 850507 PDR ADOCK 05000329 pf.I M

OC0585-0005A-MP02

c.

I a

/'

2 The next ALAB-106 Quarterly. Report will be ~ sent the end of June 1985 which will put the report timing back on a regular schedule.

i JWC/WRB/lr CC: JGKeppler. NRC Region III i