Responds to Generic Ltr 85-07,dtd 850502,re Implementation of Integrated Schedules for Plant Mods.Util Will Initiate Participation in Integrated Living Schedule If Project Reactivated.Survey Form Encl
ML20140G369
Person / Time
Site: Midland
Issue date: 06/28/1985
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Thompson H
Office of Nuclear Reactor Regulation
References
33316, GL-85-07, GL-85-7, NUDOCS 8507120633
Download: ML20140G369 (4)


Text

.,

m S-CORSum8IS Power James W Cook

. Company vic, e,,,is . . , i . s.,i i.,

and Co. tructio.

'oeneral offices: 1945 West ParneH Road, Jackson, MI 49201 e (617) 78&O453 June 28, 1985 Mr Hugh L' Thompson Director Division of Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20655 MIDLAND ENERGY CENTER

. DOCKET NOS 50-329 AND 50-330 GENERIC. LETTER 85-07 FILE: 0505.21, 1300, EN005.1 SERIAL: 33316

Reference:

Generic. Letter 85-07, Implementation of. Integrated Schedules for Plant Modifications, dated May 2, 1985 Generic Letter 85-07 requested the utility's views on the Integrated Living Schedule (ILS), and part-icularly our intentions for operating reactors. The

letter also solicited widespread-industry participation in helping to place the priority for modifications at individual plants so as to permit a well founded integration of implementation. efforts. Additionally, the letter

. requested completion-and submittal cf the enclosed survey form.

The Midland Project, if it is reactivated, will contact the-appropriate NRC Project Mcnager at that time and initiate their participation in the ILS Program.-

The completed survey form, as requested, is enclosed with this response.

-JWC/CRE/1r CC: JGKeppler, NRC Region III DSHood,'NRC Washington 8507120633 850628 A,60 PDR ADOCK 05000329 A PDR [J 2

OC0685- 0018A-MP02

7, v

NRC LICENSING CORRESPONDENCE - RECORD

SUMMARY

DATE: June 28, 1985 SERIAL: 33316 DOCKET NUMBERS 50-329, 50-330 MIDLAND ~ UNITS 1 & 2

SUMMARY

Generic Letter 85-07 requested CPCo views on the NRC proposed Integrated Living Schedule (ILS) Program, and submittal of the enclosed survey form.

COMMITMENTS MADE: Enter into CCMS to address: If the Midland Project is reactivated, we will at that time contact the appropriate NRC Project Manager and initiate Midland participation in the ILS Program discussed in Generic Letter 85-07.

COMMITMENTS CLOSED: Midland response to Generic Letter 85-07 and submittal of the completed survey form enclosed with 85-07.

PREVIOUS NRC/CPCO CORRESPONDENCE:

  • SPECIAL DISTRIBUTION:
  • Type Addressee
  • US Mail: X
  • Federal Express:
  • Telecopy:

INDIVIDUALS PROVIDING INFORMATION: *

  • INDIVIDUALS ASSIGNED RESPONSIBILITY W R Bird
  • FOR IMPLEMENTING COMMITMENTS:
  • TBD if Project is reactivated.

CONCURRENCES:

  • D J VandeWalle (N0D Licensing)
  • ATTACHMENTS OR ENCLOSURES:

ORIGINATOR:

  • Yes: X How many: 1
  • No:

G R Eagle

  • OC0685-0018A-MP02

F ENCLOSURE 2 RESPON5E FORMAT - GENERIC LETTER 85-PLANT NAME: Midland UTILITY: Consumers Power Company I. INTENTIONS-A. Intend to work with the staff to develop an ILS B. Have reservations that must be resolved before developing ILS C. Do not presently intend to negotiate an ILS with the staff X D. Plan to implement an informal ILS only II. STATUS A. If you answered I.A above:

1. Have you settled on a method for prioritizing the work at your plant (s)?

Circle One: Yes No If yes, select best description:

Engineering judgement Analytic Hiearchy process Risk based analysis Cost-benefit analysis Other (please describe)

If no, provide estimated date for selecting a methodology:

Date or If not presently available, provide estimated date for scheduling the selection of a methodology:

2. What i's your estimated date for making a submittal to the NRC-or If not presently available, planned date for

, scheduling a submittal to the NRC

B. If you answered I.B above:

1. Please exclain your reservations on separate sheet (s) or provide your schedule for supplying an explanation See separate sheet (s) or Separate submittal scheduled for (Date)
7. If available to meet with the staff to discuss your concerns, propose a time frame for such a meeting and orovide a contact that can make arrangements Contact / Time Frame Phone Number C. If you answered I.C
1. Would you be willing to meet with the staff to discuss the development of an ILS for your facility (sl?

Circle One: Yes No If yes, oropose a time frame for such a meeting and provide a contact that can rake arrangements.

Contact To be established with NRC Pro.ieet Time ~rame Manager if the Project is reactivated.

Phone Number If no, any constructive comments you have would be appreciated.

III. ADDITIONAL ITEMS Please make any sucgestions you may have as to how a utility sponsored availability / reliability pro.iect might be credited for plant safety enhancement. Provide additional cnnstructive comments as appropriate.

If Midland is reactivated, the Project will contact the NRC Project Manager at that time and initiate participative action.