MONTHYEARIR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 IR 05000461/20234202023-08-29029 August 2023 Security Baseline Inspection Report 05000461/2023420 IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 IR 05000461/20224032022-11-28028 November 2022 Material Control and Accounting Program Inspection Report 05000461/2022403 (Public) IR 05000461/20220032022-11-10010 November 2022 Integrated Inspection Report 05000461/2022003 IR 05000461/20220052022-08-22022 August 2022 Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005) IR 05000461/20220022022-07-27027 July 2022 Integrated Inspection Report 05000461/2022002 IR 05000461/20220102022-06-0606 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000461/2022010 IR 05000461/20224012022-05-24024 May 2022 Security Baseline Inspection Report 05000461/2022401 IR 05000461/20220012022-04-28028 April 2022 Integrated Inspection Report 05000461/2022001 IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 IR 05000461/20210062022-03-0202 March 2022 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2021006) IR 05000461/20210042022-02-0404 February 2022 Integrated Inspection Report 05000461/2021004 IR 05000461/20215012022-01-0303 January 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2021501 IR 05000461/20210032021-10-29029 October 2021 Integrated Inspection Report 05000461/2021003 IR 05000461/20210132021-09-0303 September 2021 Temporary Instruction Report 05000461/2021013 IR 05000461/20210052021-09-0101 September 2021 Updated Inspection Plan for Clinton Power Station; Report 05000461/2021005 IR 05000461/20214022021-08-23023 August 2021 Security Baseline Inspection Report 05000461/2021402 IR 05000461/20210112021-08-20020 August 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000461/2021011 IR 05000461/20210022021-08-0909 August 2021 Integrated Inspection Report 05000461/2021002 IR 05000461/20214402021-07-15015 July 2021 Supplemental Inspection Report 05000461/2021440 and Assessment Follow Up Letter (Cover Letter Only) IR 05000461/20210122021-06-28028 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000461/2021012 IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 IR 05000461/20214012021-04-29029 April 2021 Security Baseline Inspection Report 05000461/2021401 (Cover Letter Only) IR 05000461/20210012021-04-26026 April 2021 Integrated Inspection Report 05000461/2021001 IR 05000461/20210102021-03-18018 March 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000461/2021010 IR 05000461/20200102021-03-11011 March 2021 Triennial Fire Protection Inspection Report 05000461/2020010 IR 05000461/20200062021-03-0404 March 2021 Annual Assessment Letter for Clinton Power Station Unit 1 (Report 05000461/2020006) IR 05000461/20200042021-02-0909 February 2021 Integrated Inspection Report 05000461/2020004; 07201046/2020001 IR 05000461/20204022020-11-19019 November 2020 Security Baseline Inspection Report 05000461/2020402 IR 05000461/20204202020-11-13013 November 2020 Security and Incident Response Inspection Report 05000461/2020420 ML20314A0952020-11-13013 November 2020 Security Inspection Report 05000461/2020420 Cover Letter - IP 92707 IR 05000461/20200032020-11-0909 November 2020 Integrated Inspection Report 05000461/2020003 IR 05000461/20204042020-11-0202 November 2020 EA-20-004 Clinton Power Station - Final Significance Determination for a Security-Related Preliminary Greater than Green Finding with Assessment Follow-Up; NRC Security Inspection Report 05000461/2020404 IR 05000461/20204032020-09-0303 September 2020 Special Inspection Report 05000461/2020403 and Preliminary Greater than Green (Cover Letter Only) IR 05000461/20200052020-09-0101 September 2020 Updated Inspection Plan for Clinton Power Station, Unit 1 (Report 05000461/2020005) IR 05000461/20200022020-08-11011 August 2020 Integrated Inspection Report 05000461/2020002 IR 05000461/20200012020-05-13013 May 2020 Integrated Inspection Report 05000461/2020001 IR 05000461/20204012020-03-0505 March 2020 Security Baseline Inspection Report 05000461/2020401 (Cover Letter Only) 2024-02-02
[Table view] Category:Letter
MONTHYEARIR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 ML23361A1572024-01-24024 January 2024 Audit Plan in Support of Review of License Amendment Request Regarding Revision of Technical Specifications Related to Reactor Water Cleanup Isolation ML24004A0792024-01-18018 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0041 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 ML23284A2512023-11-22022 November 2023 Amendment No. 250 to Adopt TSTF-332 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 ML22300A2212023-11-0202 November 2023 Preliminary Decommissioning Cost Estimate and Fuel Management Plan RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000461/20234202023-08-29029 August 2023 Security Baseline Inspection Report 05000461/2023420 RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release ML23209A8102023-07-28028 July 2023 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 ML23194A1662023-07-19019 July 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Partial Site Release ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23143A3182023-05-23023 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML23031A2972023-03-0101 March 2023 Issuance of Amendment No. 248 Adoption of TSTF-269, Revision 2 RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI 2024-02-02
[Table view] |
Text
SUBJECT:
CLINTON POWER STATION, UNIT 1NRC EMERGENCY PREPAREDNESS EXERCISE INSPECTION; INSPECTION REPORT 05000461/2019501
Dear Mr. Hanson:
On March 21, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Clinton Power Station, Unit 1, and discussed the results of this inspection with Mr. J. Kowalski and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Randal D. Baker, Chief Operations Branch Docket No.: 05000461 License No.: NPF-62
Enclosure:
IR 05000461/2019501
Inspection Report
Docket Number: 05000461 License Number: NPF-62 Report Number: 05000461/2019501 Enterprise Identifier: I-2019-501-0014 Licensee: Exelon Generation Company, LLC Facility: Clinton Power Station Location: Clinton, IL Inspection Dates: March 18, 2019, to March 22, 2019 Inspectors: M. Garza, Emergency Preparedness Inspector G. Hansen, Sr. Emergency Preparedness Inspector T. Ospino, Reactor Engineer F. Tran, Health Physicist (Licensing)
Approved By: Randal D. Baker, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC Emergency Preparedness Exercise Inspection at Clinton Power Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.
List of Findings and Violations No findings were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation Inspection Review (IP Section 02.01-02.11)
Main article: IP 71114.01
The inspectors evaluated the biennial emergency plan exercise on March 19, 2019. The exercise scenario simulated an event at the Clinton Power Station that initiated with the declaration and notification of an Alert in response to abnormal plant conditions that caused the on-shift crew to initiate a manual scram that resulted in an Anticipated Transient Without Scram. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation Scenario Review Inspection Review (IP Section 02.01 - 02.04)
Main article: IP 71114.08
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 15,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
Alert & Notification System Reliability (IP Section 02.14) ===
3rd quarter - 4th quarter 2018
Drill/Exercise Performance (IP Section 02.12) (1 Sample)
3rd quarter - 4th quarter 2018
ERO Drill Participation (IP Section 02.13) (1 Sample)
3rd quarter - 4th quarter
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 21, 2019, the inspector presented the NRC Emergency Preparedness Exercise Inspection results to Mr. J. Kowalski and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71114.01 Corrective Action AR 0231242 NOS ID: A Used Protective Clothing Container Not Staged 03/19/19
Documents
71114.01 Corrective Action AR 03985112 EP Drill Critique Items 03/14/17
Documents
71114.01 Corrective Action AR 04007063 EP Drill Evaluation Results 05/05/17
Documents
71114.01 Corrective Action AR 04067474 Drive In Drill Critique Items 09/27/17
Documents
71114.01 Corrective Action AR 04074715 Clinton 2017 NRC EP Exercise EOF ERO Performance 11/14/17
Documents Demonstration Criteria Failures
71114.01 Corrective Action AR 04130446 EP Drill Critique Items 04/24/18
Documents
71114.01 Corrective Action AR 04168991 Clinton EP Off-Year Exercise - CR Simulator Performance 08/28/18
Documents Issues
71114.01 Corrective Action AR 04179787 CPS Off-Year Exercise: Other Issues Identified 08/28/18
Documents
71114.01 Corrective Action AR 04204932 Gaitronics Speaker Volume Too Low 12/20/18
Documents
71114.01 Corrective Action AR 04224505 EPID: 2/19/19 EP Exercise: SIM/MCR Failed Demonstration 02/19/19
Documents Criteria
71114.01 Corrective Action AR 04230949 Procedure Enhancement for 4110.10 03/19/19
Documents
71114.01 Corrective Action AR 04230961 PA Announcement not Immediately Heard 781 Aux During 03/19/19
Documents Drill
71114.01 Corrective Action AR 04231080 EP ID: PA Announcements Not Heard in OCC 03/19/19
Documents
71114.01 Miscellaneous 2018 Off-Year Clinton 2018 Off Year Exercise Evaluation Report 08/28/18
Exercise
71114.01 Miscellaneous 2019 Pre- Clinton 2019 Pre-Exercise Evaluation Report 02/19/19
Exercise
Evaluation
71114.01 Miscellaneous PowerPoint Clinton Biennial Exercise - Exercise Evaluation Results 03/21/19
Inspection Type Designation Description or Title Revision or
Procedure Date
Presentation
71114.01 Procedures EP-AA-1000 Exelon Nuclear Standardized Radiological Emergency Plan 29
71114.01 Procedures EP-AA-1003 Exelon Nuclear Radiological Emergency Plan Annex for 28
Clinton Station
71114.01 Procedures EP-AA-1003, Clinton Station On-Shift Staffing Technical Basis 1
Addendum 1
71114.01 Procedures EP-AA-1003, Exelon Nuclear Emergency Action Levels for Clinton Station 2
Addendum 3
71114.01 Procedures EP-AA-110-200 Dose Assessment 12
71114.01 Procedures EP-AA-110-301 Core Damage Assessment (BWR) 10
71114.01 Procedures EP-AA-111 Emergency Classification and Protective Action 21
Recommendations
71114.01 Procedures EP-AA-112 Emergency Response Organization (ERO)/Emergency 20
Response Facility Activation and Operation
71114.01 Procedures EP-AA-113 Personnel Protective Actions 13
71114.01 Procedures EP-AA-114 Notifications 13
71114.08 Miscellaneous RS-19-007 Clinton 2019 NRC Graded Exercise Manual 01/17/19
71151 Miscellaneous NEI 99-02 Regulatory Assessment Performance Indicator Guideline 7
71151 Miscellaneous NRC PI Data NRC Indicator ANS Reliability 07/01/18 -
Sheets 12/31/18
71151 Miscellaneous NRC PI Data ERO Readiness 07/01/18 -
Sheets 12/31/18
71151 Miscellaneous NRC PI Data Drill/Exercise Performance 07/01/18 -
Sheets 12/31/18