MONTHYEARML24045A0232023-11-30030 November 2023, 14 February 2024 Application for Renewed Operating License Project stage: Request ML24045A0242024-02-14014 February 2024 Application for Renewed Operating License Project stage: Request ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process Project stage: Other ML24135A2162024-05-0707 May 2024 May 7, 2024 Clinton Power Station Public Meeting Transcript Project stage: Request ML24135A2172024-05-0909 May 2024 May 9, 2024 Clinton Power Station Public Meeting Transcript Project stage: Request ML24135A3712024-05-21021 May 2024 Memo from Awaldron to Skoenick Transmitting Meeting Summary Project stage: Meeting ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) Project stage: Approval ML24215A2932024-09-27027 September 2024 Scoping Summary Letter Project stage: Other ML24215A2892024-09-30030 September 2024 Scoping Summary Report Project stage: Other ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) Project stage: Approval 2024-05-21
[Table View] |
|
---|
Category:Letter
MONTHYEARML24353A1372025-01-15015 January 2025 Proprietary Determination Constellation Energy Generation, LLC 2024 Deferred Premiums RS-24-133, Supplement No. 2 - Changes to the Clinton Power Station, Unit 1 - License Renewal Application2024-12-20020 December 2024 Supplement No. 2 - Changes to the Clinton Power Station, Unit 1 - License Renewal Application ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 ML24339B7292024-12-18018 December 2024 Amd - Constellation - Adoption of TSTF-591 ML24347A0992024-12-12012 December 2024 Information Request for the Cyber Security Baseline Inspection Notification to Perform Inspection ML24341A0812024-12-0505 December 2024 Federal Agency Coordination Under the Endangered Species Act, Section 7 for Clinton License Renewal ML24341A0802024-12-0303 December 2024 List of Threatened and Endangered Species That May Occur in Proposed Project Location or May Be Affected by Proposed Project ML24332A0512024-11-27027 November 2024 Supplement No. 1 - Changes to the Clinton Power Station, Unit 1, License Renewal Application ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML24331A2792024-11-26026 November 2024 Supplement to Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition - Revise LaSalle, Units 1 and 2 Technical Specificati RS-24-128, Response to NRC Request for Additional Information, Dated October 23, 2024, Regarding the License Renewal Application, Environmental Requests for Additional Information - Severe Accident Mitigation Alternative Analysis2024-11-25025 November 2024 Response to NRC Request for Additional Information, Dated October 23, 2024, Regarding the License Renewal Application, Environmental Requests for Additional Information - Severe Accident Mitigation Alternative Analysis ML24326A2742024-11-21021 November 2024 Response to NRC Request for Additional Information, Dated October 23, 2024, Regarding the License Renewal Application, Environmental Requests for Additional Information – Environmental Review IR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24340A1252024-10-24024 October 2024 Letter to T. Smith, NRC from Jason C. Nelson, General Counsel, Kickapoo Traditional Tribe of Tx, Regarding Clinton License Renewal Environmental Review ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 2025-01-15
[Table view] |
Text
200 Exelon Way Kennett Square, PA 19348 www.constellation.com RS-24-012 10 CFR 50 10 CFR 51 10 CFR 54 February 14, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Application for Renewed Operating License
References:
- 1. Letter from P.R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, Request for Exemption from 10 CFR 2.109(b), dated November 8, 2018 (ML18312A139)
- 2. Letter from J.S. Wiebe (U.S. NRC) to B.C. Hanson (Exelon Generation Company, LLC), Clinton Power Station, Unit 1, Exemption from the Requirements of 10 CFR 54.17(A) (EPID L-2018-LLE-0018), dated July 11, 2019 (ML19092A258)
Pursuant to the Code of Federal Regulations, Title 10, Parts 50, 51, and 54, Constellation Energy Generation, LLC (CEG) hereby applies for the renewal of the Clinton Power Station (CPS), Unit 1, Facility Operating License, No. NPF-62. The existing CPS Facility Operating License, No. NPF-62, is currently set to expire at midnight on April 17, 2027.
CEG seeks to extend the operating term by 20 years beyond the current license expiration date.
The enclosed License Renewal Application (LRA) contains the information required by the License Renewal regulations set forth in 10 CFR Parts 54 and 51. In Reference 1, CEG (formerly Exelon Generation Company, LLC) requested exemption from 10 CFR 2.109(b),
Effect of timely renewal application, which provides timely renewal protection to licensees that submit sufficient license renewal applications at least five years before the expiration of the existing license. Specifically, CEG requested that it be permitted to submit the CPS License Renewal Application (LRA) no later than three years prior to the expiration of the stations operating license and still receive timely renewal protection under 10 CFR 2.109(b). In Reference 2, the NRC approved exemption from 10 CFR 54.17(a)s requirement that an application for a renewed license be in accordance with Subpart A of 10 CFR Part 2, and more specifically, 10 CFR 2.109(b). The CPS LRA meets the timeliness allowance approved in Reference 2.
February 14, 2024 U.S. Nuclear Regulatory Commission Page 2 As required by 10 CFR 54.21(b), current licensing basis changes which have a material effect on the content of this application will be submitted at least annually while the application is under NRC review, and at least three months prior to the scheduled completion of the NRC review.
Appendix A, Section A.5, of the enclosed CPS LRA provides a list of commitments made in this application. This list will be updated as required throughout the LRA review process.
Should you have any questions regarding this submittal, please contact Ms. Lydia S.
Dworakowski at (779) 231-5682 or by email at lydia.dworakowski@constellation.com.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 14th day of February 2024.
Respectfully, Christopher D. Wilson License Renewal Director Constellation Energy Generation, LLC
Enclosures:
- 1. Clinton Power Station License Renewal Application, Sections 1 through 4 and Appendices A through D
- 2. Clinton Power Station License Renewal Application, Appendix E, Applicants Environmental Report - Operating License Renewal Stage cc:
NRC Regional Administrator, Region III NRC Senior Resident Inspector - Clinton Power Station NRC Project Manager (Safety Review), NRR-DNRL NRC Project Manager (Environmental Review), NRR-DNRL NRC Project Manager, NRR-DORL - Clinton Power Station Illinois Emergency Management Agency - Division of Nuclear Safety Wilson, Christopher D Digitally signed by Wilson, Christopher D Date: 2024.02.14 08:14:04 -05'00'