Security Baseline Inspection Report 05000461/2020402
ML20324A619
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/19/2020
From: Steven Orth
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co
References
IR 2020402
Download: ML20324A619 (7)


Text

November 19, 2020

SUBJECT:

CLINTON POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000461/2020402

Dear Mr. Hanson:

On November 12, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station and discussed the results of this inspection with Mr. T. Chalmers, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000461 License No. NPF-62

Enclosure:

As stated

Inspection Report

Docket Number:

05000461

License Number:

NPF-62

Report Number:

05000461/2020402

Enterprise Identifier: I-2020-402-0023

Licensee:

Exelon Generation Company, LLC

Facility:

Clinton Power Station

Location:

Clinton, IL

Inspection Dates:

August 24, 2020 to November 12, 2020

Inspector:

J. Kutlesa, Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Clinton Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could, in part, be performed remotely.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspector evaluated the security equipment testing and maintenance program.

The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Partial)

(1)

(Partial)

  • Tier I: 02.01 (a); 02.02 (a, i); 02.03 (a, b, c); 02.04 (a, d, e, g); 02.05 (a); 02.06 (a, c, d); 02.07 (a, b, c, d); 02.08 (a, b, c, d, e)
  • Tier II: None
  • Tier III: None

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision 18 to 19 was implemented based on your determination, in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1)

(September 2019-August 2020)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On November 12, 2020, the inspector presented the security baseline inspection results to Mr. T. Chalmers, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Engineering

Changes

EC 626154

Integrated Video Management System

Miscellaneous

N/A

Copy of Weapons Maintenance Dates

09/24/2020

PMRQ & WO

Security Equipment Preventive Maintenance Records and

Work Orders

Various

Procedures

SY-AA-101-122

Testing Security Equipment

SY-AA-150-103

Firearms Maintenance, Testing, And Accountability

SY-CL-101-1015

Designated Storage Area (DSG) Control Clinton Power

Station Security

SY-CL-101-103

Weekly Security Barrier Inspections

SY-CL-101-122

Clinton Site Specific Equipment Testing

71130.09

Miscellaneous

N/A

Clinton Physical Security Plan

N/A

Clinton Physical Security Plan

71151

Miscellaneous

N/A

Clinton Performance Indicator Inputs

09/22/2020

Self-Assessments PI-AA-126-1001-

F-01

NRC Security Equipment Performance Inspection 71130.04

and PI verification 71151

06/30/2020