Text
SUBJECT:
CLINTON POWER STATION - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000461/2023501
Dear David Rhoades:
On November 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station and discussed the results of this inspection with Norha Plumey, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000461 License No. NPF-62
Enclosure:
As stated
Inspection Report
Docket Number:
05000461
License Number:
Report Number:
Enterprise Identifier:
I-2023-501-0011
Licensee:
Constellation Nuclear
Facility:
Clinton Power Station
Location:
Clinton, IL
Inspection Dates:
November 13, 2023 to November 16, 2023
Inspectors:
G. Hansen, Sr. Emergency Preparedness Inspector
T. Iskierka-Boggs, Senior Operations Engineer
J. Kutlesa, Emergency Preparedness Inspector
T. Ospino, Resident Inspector
Approved By:
Steven K. Orth, Chief
Security, Emergency Preparedness, and Incident
Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Clinton Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise on November 14, 2023. The exercise scenario simulated an event at the Clinton Power Station that initiated with the declaration and notification of an Alert in response to AC power capability to vital busses being reduced to only one power source for equal to or greater than 15 minutes. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation - Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for the biennial emergency plan exercise on October 11,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12)===
- (1) July 1, 2022 through June 30, 2023 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) July 1, 2022 through June 30, 2023 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) July 1, 2022 through June 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 16, 2023, the inspectors presented the emergency preparedness biennial exercise inspection results to Norha Plumey, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Clinton 2021 Biennial EP Exercise - SIM MCR - DC
Performance
11/18/2021
NARS DEP Transmittal Exceeded 15 Min
05/06/2022
EPID - Clinton EP 2022 Off-Year Exercise - TSC
Performance
10/11/2022
EPID - Clinton EP 2022 Off-Year Exercise - OSC
Performance
10/11/2022
EPID - Clinton EP 2022 Off-Year Exercise - EOF
Performance
10/11/2022
EPID - Clinton EP 2022 Off-Year Exercise - SIM
Performance
10/11/2022
EPID - 2023 EMPE Exercise TSC Performance
05/22/2023
EPID - 2023 EMPE Exercise OSC Performance
05/22/2023
EPID - 2023 EMPE Exercise Simulator (MCR) Performance
05/23/2023
EPID Lessons Learned from 2023 EMPE Exercise
05/23/2023
EPID - 2023 Clinton Pre-Exercise OSC Failed Objective K1
08/11/2023
EPID - 2023 Clinton Pre-Exercise OSC Failed Objective K5
08/11/2023
EPID - 2023 Clinton Pre-Exercise Sim Failed Objective F3
08/11/2023
EPID - 2023 Clinton Pre-Exercise Sim Failed Objective F3
08/11/2023
EPID - 2023 Pre-Exercise DC Learnings from Sim
08/11/2023
EPID - 2023 Pre-Exercise DC Learnings from TSC
08/11/2023
Corrective Action
Documents
EPID - 2023 Pre-Exercise DC Learnings from OSC
08/11/2023
Exelon Nuclear Standardized Radiological Emergency Plan
Exelon Nuclear Radiological Emergency Plan Annex for
Clinton Station
Addendum 3
Exelon Nuclear Emergency Action Levels for Clinton Station
Dose Assessment
Emergency Classification and Protective Action
Recommendations
Procedures
Emergency Response Organization (ERO) / Emergency
Response Facility Activation and Operation
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
TSC Activation and Operation
Emergency Operations Facility Activation and Operation
Personnel Protective Actions
Notifications
EP-AA-114-F-02
BWR Release in Progress Determination Guidance
Rev A
EP-AA-114-F-12
Clinton Release in Progress Determination Guidance
Technical Basis Document
Rev A
Miscellaneous
Clinton Station 2023 Emergency Preparedness Biennial
Exercise Scenario
09/14/2023
Clinton 2021 Biennial EP Exercise - SIM/MCR - DC
Performance
11/16/2021
EP - Failed Siren Activation Command
05/03/2022
NARS DEP Transmittal Exceeded 15 Minutes
04/15/2022
Corrective Action
Documents
EP ID: Drill & Exercise Performance Indicator Revisions
05/06/2022
Monthly Data Elements for NRC ROP Indicator - Emergency
Response Organization (ERO) Drill Participation
04/01/2022 -
06/30/2023
Monthly Data Elements for NRC ROP Indicator -
Drill/Exercise Performance
04/01/2022 -
06/30/2023
Miscellaneous
Monthly Data Elements for NRC ROP Indicator - Alert and
Notification System (ANS) Reliability
04/01/2022 -
06/30/2023
71151
Procedures
Corrective Action Program (CAP) Procedure
8