IR 05000461/2023003
| ML23311A378 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/08/2023 |
| From: | Robert Ruiz NRC/RGN-III/DORS/RPB1 |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2023003 | |
| Download: ML23311A378 (1) | |
Text
SUBJECT:
CLINTON POWER STATION - INTEGRATED INSPECTION REPORT 05000461/2023003
Dear David Rhoades:
On September 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station. On October 23, 2023, the NRC inspectors discussed the results of this inspection with Norha Plumey, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Robert Ruiz, Chief Reactor Projects Branch 1 Division of Operating Reactor Safety Docket No. 05000461 License No. NPF-62
Enclosure:
As stated
Inspection Report
Docket Number:
05000461
License Number:
Report Number:
Enterprise Identifier:
I-2023-003-0048
Licensee:
Constellation Nuclear
Facility:
Clinton Power Station
Location:
Clinton, IL
Inspection Dates:
July 01, 2023 to September 30, 2023
Inspectors:
E. Fernandez, Senior Reactor Inspector
E. Magnuson, Reactor Inspector
A. Muneeruddin, Resident Inspector
J. Murphy, Illinois Emergency Management Agency
J. Reed, Health Physicist
J. Steward, Senior Resident Inspector
Approved By:
Robert Ruiz, Chief
Reactor Projects Branch 1
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Clinton Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 began the inspection period in Mode 1, operating at or near full-rated thermal power. On August 15, 2023, the unit began end-of-cycle coastdown to the planned refueling outage (C1R21). On September 11, 2023, the unit reduced power to approximately 15 percent full-rated thermal power and inserted a manual reactor scram to enter Mode 3 (hot shutdown) to commence C1R21. Following an orderly shutdown, depressurization, and cooldown, the unit was placed in Mode 4 (cold shutdown). The unit remained in cold shutdown for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal hot weather for the following systems:
plant chilled water, switch gear heat removal, and emergency core cooling system equipment cooling on July 6 and 7, 2023
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from approaching thunderstorms on July 5, 2023.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)residual heat removal train C on August 16, 2023 (2)division 1 and division 2 automatic depressurization system backup air supply on August 16, 2023 (3)control room heating, ventilation, and air conditioning train B on September 22, 2023
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (11 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Fire Zones A-2n and A-4, elevation 781', auxiliary building, division 1 switchgear room and division 1 battery room on July 12, 2023
- (2) Fire Zone T-1(h,j, and k), turbine building, elevation 781', general access and mezzanines, and steam system auxiliaries on July 19, 2023
- (3) Fire Zones CB-3 (a,b,c,d,e,f, and g), elevation 781', control building auxiliary electrical equipment, inverter and battery rooms on July 19, 2023
- (4) Fire Zones M-1 and M-2(a,b), elevation 699', screen house, divisions 1, 2, and 3 shutdown service water pump rooms on July 21, 2023
- (5) Fire Zone C-2, containment building, elevations 828', 803', 778' east and west, 755', and 737' on July 31, 2023
- (6) Fire Zone A-3b, auxiliary building 707', RHR 'C' pump room on August 16, 2023
- (7) Fire Zone A-6, auxiliary building 707', south hallway on August 16, 2023
- (8) Fire Zone A-1(a), auxiliary building 707', general access area on August 16, 2023
- (9) Fire Zone F-1(b), fuel handling building 712', high pressure core spray pump room on August 16, 2023
- (10) Fire Zone CB-1e, control building 737' on August 22, 2023
- (11) Fire Zone T-1m, turbine building 800' north-end on August 22, 2023
Fire Brigade Drill Performance Sample (IP Section 03.02) (2 Samples)
- (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill at radwaste building elevation 702' on July 3, 2023.
- (2) The inspectors evaluated the onsite fire brigade training and performance during an unannounced fire drill at fuel building elevation 737' on August 9, 2023.
71111.06 - Flood Protection Measures
Flooding Sample (IP Section 03.01) (2 Samples)
- (1) The inspectors evaluated external flooding mitigation protections in the division 3 cable tray vault on July 7, 2023, and division 2 cable tray vault on July 21, 2023.
- (2) The inspectors evaluated internal flooding mitigation protections in the reactor core isolation cooling (RCIC) pump and instrument room, auxiliary building, elevation 707'-6", flood zones A1.7 and A1.8 on August 14, 2023.
71111.08G - Inservice Inspection Activities (BWR)
BWR Inservice Inspection (ISI) Activities Sample - Nondestructive Examination and Welding
Activities (IP Section 03.01)
The inspectors evaluated boiling water reactor non-destructive testing by reviewing the following examinations from September 11 through 22, 2023:
(1)
1. Phased Array Ultrasonic Examination (PAUT) of RHR Pipe to Valve
Weld 1-RH-20-6
2. Encoded Phased Array Ultrasonic Examination (PAUT) of PRH Safe End to
3. Encoded Phased Array Ultrasonic Examination (PAUT) of PRH Safe End to
4. Magnetic particle Examination (MT) of HP Injection Welded
Support 1HP03009R
5. Visual Examination of (VT-3) of HP Injection Welded Support 1HP03009R
6. Report C1R17-APR-26 Previous Exam Record of RHR Pipe to Valve
7. Replace Degraded Suppression Pool Min Flow Bypass Valve 1E22F012
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room on August 12 and during a down power for a rod pattern adjustment on August 18, 2023.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator requalification simulator training on August 8, 2023.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (3 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
(1)emergent work to replace rod control and information system 5 Volt logic power supply and address display indications at main control room P680 panel on August 31, 2023 (2)1FP092, "Containment Fire Protection System Outboard Isolation Valve," seat leakage in excess of 20,000 standard cubic centimeters per minute (sccm) on July 21, 2023
- (3) AR 4702304, "72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Oil Puddles Identified Under RR (Reactor Recirculation) A & B Pumps," on September 13, 2023
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
(1)bypass digital feedwater inputs per WO 5389647-03 on August 18, 2023 (2)elevated plant risk associated with extreme seasonal temperatures during the week of August 21 to August 25, 2023 (3)elevated plant risk associated with the reserve auxiliary transformer 'B' static var compensator abandonment system outage window and risk mitigation actions on August 31, 2023
- (4) Yellow online risk for the planned pre-system outage window work associated with the 'B' reserve auxiliary transformer inoperability on September 6, 2023
- (5) Yellow risk for the electrical key safety function for a planned system outage work window due to 'B' reserve auxiliary transformer (RAT) and division 1 diesel generator unavailable on September 13 and 14, 2023
- (6) Yellow shutdown risk during the lowered inventory transition period to support reactor vessel head disassembly while at a high decay heat period on September 12, 2023
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (9 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
During 9071.01B"
- (2) AR 4675329, "Review of Division 1 and Division 2 Emergency Diesel Generator Allowed Outage Time Basis"
- (3) AR 4695160, "Division 3 DG [diesel generator] 'A' Air Compressor, 1DG03CA Oil Appears to be Milky"
- (4) AR 4696812, "1E12-F064C NRC ID'd Minor Oil Leak on the Declutching Mechanism"
- (5) AR 4694859, "Unexpected LPRM [local power range monitor] 46-39A Upscale Results in Half Scram Signal RPS B"
- (6) RAT 'B' and static var compensator system outage window Tech Spec 3.8.1, action A.1 surveillances and documentation on September 6, 2023
- (7) AR 4683575, "Vulnerability identified in Clinton DFW (Digital Feedwater)"
- (8) AR 4701950, "Division 3 Diesel Generator Starting Air System A Compressor, 1DG03CA, Elevated Moisture Content and Wear Particles"
- (9) AR 4704184, "LPRM 22-39 Engagement Issue Found During C1R21 In Vessel Visual Inspections Functionality Assessment"
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) RAT 'B' static variable compensator (SVC) long-term abandonment permanent modification on August 30, 2023
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)
(1)
(Partial)
The inspectors evaluated refueling outage C1R21 activities from September 11, 2023 to September 30, 2023
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (6 Samples)
- (1) Work Order (WO) 5385759, "Division 1 Rod Action Control System 5V Power Supply Low" (2)division 3 diesel generator alternating current lube oil circulating pump after replacement of pump coupling on August 2, 2023 (3)fire pump 'A' functionality test after preventative maintenance on August 28, 2023
- (4) Clinton Power Station (CPS) 9061.02, "Containment Airlock Door Interlock Test,"
after the inside 828' containment door failed to open twice on September 12, 2023
- (5) CPS 9015.03, "Standby Liquid Control, Scram Discharge Volume Monthly Valve Verification," (WO 5207092-03) as post-maintenance test following 1C41-F004B replace parts after firing per CPS 9015.02 per WO 05207092-04 on September 19, 2023 (6)post-maintenance test on 1E12-F009, RHR shutdown cooling inboard isolation valve per WO 01588560-03 on September 22, 2023
Surveillance Testing (IP Section 03.01) (5 Samples)
- (1) CPS 9061.10, "Fuel Pool Cooling Valve Operability," on July 10-12, 2023
- (2) CPS 9080.12, "Diesel Generator Fuel Oil Transfer Pump Operability," for division 3 on August 1, 2023 (3)residual heat removal (RHR) 'A' pump operability test on August 25, 2023
- (4) CPS 9069.01P003, "Division 2 Shutdown Service Water Operability Test," per WO
===5245868-21 on September 29, 2023
-03 and -04 on September 29, 2023 Containment Isolation Valve (CIV) Testing (IP Section 03.01)===
- (1) CPS 9861.05D002, "RHR B and RHR C Water Leak Rate Test On 1E12-F025C, RHR Pump C Discharge Relief Valve to Suppression Pool," per WO 05226135-06 on September 28, 2023
Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)
(1)reactor coolant system leak detection testing due to step change in drywell floor drain in leakage (noted on July 31, 2023) on August 7, 2023
Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)
(1)hale pump 1FX01PB and booster pumps 1FX01PBA and 1FX01PBB functional test on August 1, 2023
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
(1)emergency plan drill observation from the control room simulator and the technical support center on August 8,
RADIATION SAFETY
71124.01 - Radiological Hazard Assessment and Exposure Controls
Radiological Hazard Assessment (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.
Instructions to Workers (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated how the licensee instructs workers on plant-related radiological hazards and the radiation protection requirements intended to protect workers from those hazards.
Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)
The inspectors observed/evaluated the following licensee processes for monitoring and controlling contamination and radioactive material:
(1)workers using whole body contamination monitors while exiting the radiologically controlled area (RCA) during the Unit 1 refueling outage (2)radiation protection technicians performing surveys of potentially contaminated material leaving the RCA
Radiological Hazards Control and Work Coverage (IP Section 03.04) (4 Samples)
The inspectors evaluated the licensee's control of radiological hazards for the following radiological work:
(1)refuel floor activities
- (2) LPRM change out (3)bioshield ISI activities (4)steam sensitive areas High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (3 Samples)
The inspectors evaluated licensee controls of the following high radiation areas (HRAs) and very high radiation areas (VHRAs):
- (1) Unit 1 drywell equipment hatch
- (2) Unit 1 reactor pressure vessel head stand
- (3) Unit 1 RHR HX room A Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
- (1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
Temporary Ventilation Systems (IP Section 03.02) (1 Sample)
The inspectors evaluated the configuration of the following temporary ventilation systems:
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===
- (1) Unit 1 (July 1, 2022, through June 30, 2023)
MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)
- (1) Unit 1 (July 1, 2022, through June 30, 2023)
MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)
- (1) Unit 1 (July 1, 2022, through June 30, 2023)
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (1 Sample)
- (1) Unit 1 (July 1, 2022, through July 31, 2023)
OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
- (1) Unit 1 (July 1, 2022, through July 31, 2023)
PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
- (1) Unit 1 (July 1, 2022, through July 31, 2023)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)trend in qualification system maintenance for chemistry and radiation protection on September 7, 2023
71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in foreign material exclusion practices that might be indicative of a more significant safety issue. For this sample, the inspectors review focused on licensee corrective action reports initiated from the February 2023 forced outage (C1F63) through the September 2023 refueling outage (C1R21).
INSPECTION RESULTS
Observation: Suppression Pool Foreign Material Exclusion Semiannual Trend Review 71152S The inspectors performed a review of plant issues, particularly those entered into the licensees corrective action program (CAP) over several months following the forced outage, C1F63, which ended in February 2023. During their review, the inspectors noted a potential adverse trend involving foreign material exclusion (FME) behaviors around the suppression pool. Specific CAP entries reviewed by the inspectors included, but were not limited to:
- AR 4554341, FME EOID Object Floating in Supp Pool Near Personnel Airlock, dated February 13, 2023
- AR 4560498, FME: Ink Pen in Suppression Pool, dated March 8, 2023
- AR 4681285, FME - Object Floating in Suppression Pool, dated May 29, 2023 The licensee identified a related trend on FME behaviors, documenting the behaviors listed above among other identified FME behaviors in their CAP as AR 4686214, Trend IR:
Behaviors in FME, on June 22, 2023. Following the initiation of that AR, there were a number of additional ARs written against FME behaviors seen below:
- AR 4688117, FME: Ear Plug in Suppression Pool, dated July 1, 2023
- AR 4689208, FME - Something Floating in Suppression Pool, dated July 7, 2023
- AR 4690769, FME: EOID Debris Found Floating in Suppression Pool, dated July 15, 2023
- AR 4692457, FME - Objects Floating in the Suppression Pool, dated July 25, 2023
- AR 4697167, FME - Object Floating in Suppression Pool, dated August 17, 2023
- AR 4704574, C1R21 FME - Objects Floating in the Suppression Pool, dated August 23, 2023 On August 24, 2023, the licensee determined that a trend still exists, and a new trend AR was written to correctly address behaviors. The new AR trend was documented in CAP as AR 4699456, Trend IR: FME Behaviors, on August 29, 2023. The corrective actions include performing a work group evaluation (WGE) to evaluate if additional training is required for FME, ensuring contractors are being briefed about FME controls, and evaluating if additional barriers are required prior to entering the FME zone. The WGE was in progress at the close of the inspection period and was not reviewed by the inspectors.
After reviewing the reports, the inspectors found that there was an apparent increasing trend in FME events with regards to the suppression pool. However, the licensee properly identified the need for trend review and have been generating corrective actions consistent with MA-AA-716-0008, "Foreign Material Exclusion Program," procedure. The inspectors did not identify a performance deficiency and have determined the licensee is in compliance with their corrective action process. No findings or violations of NRC requirements of more than minor safety significance were identified in the course of this review and an existence of a more safety significant concern was not identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 23, 2023, the inspectors presented the integrated inspection results to Norha Plumey, Site Vice President, and other members of the licensee staff.
- On September 15, 2023, the inspectors presented the radiation protection baseline inspection results to Norha Plumey, Site Vice President, and other members of the licensee staff.
- On September 22, 2023, the inspectors presented the ISI C1R21 refueling outage inspection results to Norha Plumey, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Constellation
Memo
Certification of 2023 Summer Readiness
05/22/2023
CPS 4302.01
Tornado/High Winds
23d
Station Housekeeping/Material Condition Program
OP-AA-108-111-
1001
Severe Weather and Natural Disaster Guidelines
Severe Weather Preparation and Response
Procedures
Seasonal Readiness
214.01V001
Plant Air Valve Lineup
26f
3312.01E001
Residual Heat Removal Electrical Lineup
Procedures
3312.01V001
Residual Heat Removal Valve Lineup
17c
1893.01M730
777, 781, 783 Turbine: General Access and Mezzanines
Prefire Plan
5d
1893.01M731
781 Turbine: Steam System Auxiliaries Pre-fire Plan
4b
1893.04M210
737' Containment Pre-fire Plan
6b
1893.04M220
755' Containment Pre-fire Plan
1893.04M230
778' Containment East Pre-fire Plan
1893.04M231
778' Containment West Pre-fire Plan
1893.04M240
803' Containment Pre-fire Plan
1893.04M250
28' Containment Pre-fire Plan
6a
1893.04M351
781 Control: Aux. Elect. Equip., Inverter and Battery Rooms
Prefire Plan
7d
1893.04M400
2' Fuel: Basement Pre-fire Plan
5a
1893.04M513
737' Diesel Building Unit 2 Storage Area Pre-fire Plan
6a
1893.04M601
2 Radwaste: Basement (North) Pre-fire Plan El. Zone R-1c
5b
1893.04M740
800' Turbine: Turbine Deck Pre-fire Plan
5c
Fire Plans
1893.04M003
Prefire Plan Legend
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1893.04M100
707 Auxiliary: General Access Area Pre-fire Plan
5a
1893.04M105
707 Auxiliary: RHR 'C' Pump Room Pre-fire Plan
5a
1893.04M107
707 Auxiliary: South Hallway Pre-fire Plan
1a
1893.04M132
781 Auxiliary (East): Div 1 Switchgear Pre-fire Plan
5b
1893.04M134
781 Auxiliary (East): Div 1 Battery Room Pre-fire Plan
5a
1893.04M410
737 Fuel: Grade Level Pre-fire Plan
4c
1893.04M800
699 Screen House: Div 1 SX Pump Room Pre-fire Plan
5a
1893.04M801
699 Screen House: Div 2&3 SX Pump Rooms and Tunnel
Prefire Plan
6a
23-11
Fire Drill Scenario Information
06/28/2023
Miscellaneous
23-15
Fire Drill Scenario Information
08/09/2023
CPS 1019.05
Transient Equipment and Materials
26c
CPS 3822.11
Fire Extinguisher Maintenance
2d
CPS 3822.13
Visual Inspections of Portable Fire Extinguishers
5c
22.13C001
Visual Inspection of Portable Fire Extinguishers Checklist -
Power Block and Essential Areas Within Protected Area
4a
Fire Drill Performance
Procedures
Pre-fire Plan Manual
Division 3 Manhole Inspection Instructions
08/04/2022
Clinton 2023 Pre-Exercise Drill Packet
08/03/2023
01ME77
Calculations for Flooding - Safe shutdown Analysis
Internal Flooding Analysis
2/18/2018
Miscellaneous
IP-M-0782
Suppression Pool Equalization Levels
CPS 4304.01
Flooding
6e
Procedures
CY-CL-3221-02
Sampling Cable Vault Pumping Stations
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculations
IP-M-0513
Division I, II and III SX Pipe Wall Thinning Analysis Including
RHR Piping
03/30/2023
Corrective Action
Documents
1SXB2BB-3/4" UT Results Lower Than Expected
03/30/2023
ISI NRC Inspection Ensure WO 05379426 Is Performed
09/14/2023
ISI NRC Inspection Document the Corrosion Rate Using EPRI
09/14/2023
Corrective Action
Documents
Resulting from
Inspection
C1R21-VT-3 Identified a Loose Jam Nut On Support
1HP03009R
09/16/2023
UT Examination Summary Sheet N6B-W-1
09/22/2023
UT Examination Summary Sheet N6C-W-1
09/22/2023
Magnetic Particle Examination of High Pressure Core Spray
Welded Attachment 1-HP03009R-WA
09/16/2023
NDE Reports
Visual Examination of Pipe Hanger, Support or Restraint
(VT-3)
09/19/2023
EPRI-DMW-PA-1
Procedure for Manual Phased Array Ultrasonic Examination of
Magnetic Particle (MT) Examination
GEH-UT-254
Procedure for the Automated Phased Array Ultrasonic
Examination of Dissimilar Metal Welds with the TOPAZ
Procedures
WPS 1-1-GTSM-
Welding Procedure Specification for P No. 1 to P No. 1
Procedures
CPS 3005.01
Unit Power Changes
1FP092 Leakage Prevents LLRT of 1FP050 as Written
10/04/2021
WO Needed for Previously Identified 1FP092 Leakby
01/04/2022
Reactor Recirc A Lower Motor Bearing Housing Oil Leak
01/15/2022
Reactor Recirc B Lower Motor Bearing Housing Oil Leak
01/15/2022
Work Order Keeps Getting Cancelled for 1FP092 Repair
07/02/2023
1FP092 CNMT FP Outbd Isolation LLRT Results
07/21/2023
Hour Oil Puddles Identified Under RR A & B Pumps
09/13/2023
Trend IR for Lowing RR Pump Oil Level
09/13/2023
Leak From RR A Motor
09/19/2023
Follow Up: Potential Upper/Lower Oil Leak on RR Pump 1B
09/22/2023
Corrective Action
Documents
1B33C001B (RR-B) - 1B33C001A (RR-A) Oil usage Issue
09/28/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
RR B: Engineering Recommendations From SME Calls
09/29/2023
Proper Filling of RR 'A' and 'B' Oil Bubblers
09/30/2023
Figure FP-3b
Fire Protection Features, Auxiliary Fuel Building and
Containment, Grade Floor Plan-El. 737'-0"
Figure FP-4b
Fire Protection Features, Auxiliary Fuel Building and
Containment, Mezzanine Floor Plan, El. 755'-0" & 762'-0"
Figure FP-5b
Fire Protection Features, Auxiliary Fuel Building and
Containment, Plan-El. 778-0" & 781'-0"
Figure FP-6b
Fire Protection Features, Containment Floor Plan - El 803'-3"
Drawings
Figure FP-7b
Fire Protection Features, Containment Refueling, Floor - El
28'-3"
Miscellaneous
RCIS display issues and replacement of 5 Volt logic power
supply
08/30/2023
Procedures
9861.02D045
LLRT Datasheet for 1MC081 Fire Protection to Containment
25b
MC081-1 LLRT:FP TO CT - 712 (TEST SET B)
2/15/2019
MC081 LLRT:FP TO CT - 712 (TEST SET A)
2/15/2019
MC081-1 LLRT:FP TP CT - 712 (TEST SET B)
07/22/2023
Work Orders
MC081 LLRT:FP TO CT - 712 (TEST SET A)
07/22/2023
Clinton Plan-of-the-Day (POD) Package for August 21-25,
23
Various
0610 Management Meeting Package for August 21-25, 2023
Various
RAT 'B' Availability Without SVC Analysis
08/29/2023
C1R21 Shutdown Safety Management Program
Risk Mitigation Plan Supporting WO 5389647-03,
Bypass/Substitute Failed Digital Feedwater Inputs
08/09/2023
Miscellaneous
ESOMs
Operations Narrative Log Entries
09/11/2023 -
09/15/2023
Engineering Technical Evaluations
CPS 3312.03
RHR-Shutdown Cooling (SDC) & Fuel Pool Cooling and
Assist (FPC&A)
ER-CL-600-2001
Clinton RICT System Guidelines
Procedures
Integrated Risk Management
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OP-AA-107-F-01
Risk Screening/Mitigation Plan
Risk Informed Completion Time
OP-CL-108-107-
1003
Clinton Power Station Response to Grid Capacity Conditions
Shutdown Safety Contingency Plan
4002.01, Abnormal RPV Level Loss of Feedwater at Power
05/30/2023
Vulnerability Identified in Clinton DFW
06/08/2023
Corrective Action
Documents
Fire Pump B RPM HOOS During 9071.01B
07/12/2023
Engineering
Changes
4002.01, Abnormal RPV Level loss of Feedwater at Power
Defeat / Override Parameter 'FW-RCIC-BANDC-TRIP' Shown
on WNA-CB-00187-GCLN1 Sheet 324
CPS-1364-CPS
Support Refute Matrix - 4002.01, Abnormal RPV Level Loss of
Feedwater at Power
05/30/2023
Miscellaneous
ESOMs
Operations Narrative Log Entries
09/01/2023 -
09/07/2023
1893.01
CP Administrative Requirements for Fire Protection
9082.01
Offsite Source Power Verification
2a
CPS 3312.01
Integrated Tech
Specifications
Section 3.5.1
238
Procedures
Section 5.4.7
Work Orders
9071.01, Annual Pressure Readings at OPI-FP511 and OPI-
FP516
07/11/2023
Miscellaneous
RAT B SVC Long Term Abandonment
3501.01
High Voltage Auxiliary Power Supply
30c
Procedures
3501.01D001
Monitoring Safety Related 4.16KV Bus Voltage Data Sheet
4b
Miscellaneous
PORC 23-12
C1R21 Shutdown Safety Management Program
09/01/2023
SRM 'D' Indicates Both IN and OUT
09/14/2023
SRM D Indicates Both IN and OUT
09/14/2023
Unable to Move SRM 'D' During 9031.13
09/14/2023
Corrective Action
Documents
SRM 'D' Issues During 9031.13 SRM Functional
09/15/2023
Miscellaneous
Selected Work Orders as Post Maintenance Tests for 1E12-
F042A, 1E12-F053A, 1E12-F497 and 1E21-F005
09/29/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AC-RF-2306-
0002
Elevated Drywell Floor Drain Leakage
06/18/2023
PMID/RQ 158608
9061.02 OP CNMT Airlock Door Interlock Test
09/08/2023
Flex 1FX01PB Hale Pump and Booster Pumps 1FX01PBA
and 1FX01PBB Functional
07/25/2023
WOs 5226241,
26242, and
26243
Various Work Orders Supporting Standby Liquid Control Train
B Injection Activity and Squib Valve Replacement
09/21/2023
CPS 3315.02
Leak Detection (LD)
CPS 3862.02
Flex Pump Operation
0g
CPS 8120.22
Squib Explosive Valve and Component Replacement
CPS 9015.02
SLC, SDV Monthly Valve Verification
25c
CPS 9031.13
SRM Channel Functional (Shutdown)
CPS 9052.01
LPCS/RHR A Pumps and LPCS/RHR A Waterleg Pump
Operability
50f
CPS 9053.05
RHR/LPCS Valve Operability (Shutdown)
09/22/2023
CPS 9071.01A
Diesel Driven Fire Pump A Functionality Test
1a
9861.05D002
RHR B and RHR C Water Leak Rate Test Data Sheet (S-
MC023K03)
25e
BWR Reactor Coolant System Leakage Monitoring and Action
Plan
Tool Pouch Minor Maintenance
Procedures
Post-Maintenance Testing
C1R21 Refuel Outage Bunded PMT Activities
09/25/2023
9031.13 D20 CF SRM CHANNEL FUNCTIONAL (CHAN D)
09/15/2023
Work Orders
EOID: Div 3 DG 1C AC Circ Oil Pump Coupler Wear,
1DG616PA
08/02/2023
ALARA Plans
3: Approval for Working in an Area >1500 mrem/hr
Radiation Field and/or Electronic Dosimeter Accumulated
Dose Alarm Greater than 500 mrem. Approval for tasks tied to
bio shield ISI work.
RPID Possible Internal Contamination
2/01/2023
Corrective Action
Documents
RPID - Empty Cardboard Box with RAM Labeling not
Removed
08/21/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
RPID Individual Receives Uptake
09/11/2023
NISP-RP-010
Radiological Job Coverage
Administration of the Radiation Work Permit Program
Controls for High and Locked High Radiation Areas
Controls for Very High Radiation Areas
Procedures
Additional High Radiation Exposure Control
21-106454
Radiation Survey in Support of Use of EDEX Multi-Badging for
ISI Work Inside the Bioshield
09/30/2021
21-106511
Radiation Survey in Support of Use of EDEX Multi-Badging for
ISI Work Inside the Bioshield
10/01/2021
23-200640
Drywell 737' General Area (C2-02)
09/11/2023
23-200853
Drywell 723' Under Vessel Area (C1-03)
09/13/2023
23-200897
Containment 828' General Area during Moisture Separator
Move
09/13/2023
Air Sample 23-
2
CT 828' / West Side Floor G/A Flood up
09/13/2023
Air Sample 23-
347
DW723' Under Vessel
09/12/2023
Air Sample 23-
349
28' CT RF Floor East Side G/A
09/13/2023
Radiation Surveys
CPS-23-001
23 Bioassay Program Annual Review at Clinton Nuclear
Power Station
RWP CL-1-23-
00307
Steam Sensitive Area Entries
RWP CL-1-23-
00518
C1R21 DW Bioshield ISI Activities. RWP includes the
radiological risk assessment, ALARA plan, TEDE ALARA
evaluation, and EDEX multi-badge justification.
RWP CL-1-23-
00545
C1R21 DW LPRM Change Out. RWP includes the radiological
risk assessment, ALARA plan, and TEDE ALARA evaluation.
Radiation Work
Permits (RWPs)
RWP CL-1-23-
00902
C1R21 RFF Activities No Cavity Access and Dry Tube
Activities. RWP includes the radiological risk assessment,
ALARA plan, and TEDE ALARA evaluation.
Self-Assessments
Pre-NRC 71124.01 Radiological Hazard and Exposure
Controls Self-Assessment
06/23/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
NISP-RP-008
Use and Control of HEPA Filtration and Vacuum Equipment
Corrective Action
Documents
Trend IR: Behaviors in FME
06/22/2023