David Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION - REQUEST FOR INFORMATION FOR
NRC LICENSE RENEWAL INSPECTION: INSPECTION REPORT
Dear David Rhoades:
On October 21, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a license
renewal inspection at Clinton Power Station. This inspection will be performed in accordance
with NRC Inspection Procedure 71002, License Renewal Inspection.
The inspection will evaluate Clintons initial license renewal program plans and implementation
to ensure they are consistent with the requirements of Title 10 of the Code of Federal
Regulations (10 CFR), Part 54, Requirements for the Renewal of Operating Licenses for
Nuclear Power Plants, and Clintons license renewal application. The inspection will include an
evaluation of aging management programs that are planned or in place. The inspection will also
include a review of information and documentation required by 10 CFR 54.
The inspection will include 2 onsite weeks and will consist of 5-6 NRC inspectors (including the
lead inspector). The current inspection schedule is as follows:
Preparation week:
October 14 - 18, 2024
Onsite weeks:
Week 1: October 21 - 25, 2024
Week 2: November 4 - 8, 2024
Experience with previous baseline inspections of similar depth and length has shown that this
type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee
staff. To minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for information.
It is important that all these documents are up-to-date and complete to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into three groups:
The first group lists information necessary prior to the inspection. This information
should be provided to the lead inspector by August 12, 2024.
April 1, 2024
D. Rhoades
2
The second group of documents requested are those items needed to support our
in-office preparation activities. This set of documents should be provided to the lead
inspector by October 7, 2024. During the in-office preparation activities, the team may
identify additional information needed to support the inspection.
The third group includes supporting information to be provided throughout the onsite
inspection. Specifically, corrective action documents and answers to questions
developed during the inspection are requested to be provided as the documents are
generated.
In addition, the enclosure includes information and requests addressing inspection logistics.
The lead inspector for this inspection is Lionel Rodriguez. We understand that our licensing
contact for this inspection is Chelsie Miller of your organization. If there are any questions about
the inspection or the material requested in the enclosure, please contact the lead inspector at
630-829-9609 or via email at Lionel.Rodriguez@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
Senior Reactor Inspector
Engineering Branch 1
Division of Operating Reactor Safety
Docket No. 05000461
License No. NPF-62
Enclosure:
License Renewal Inspection
Request for Information
cc w/ encl: Distribution via LISTSERV
Signed by Rodriguez, Lionel
on 04/01/24
D. Rhoades
3
Letter to David Rhoades from Lionel Rodriguez dated April 1, 2024.
SUBJECT:
CLINTON POWER STATION - REQUEST FOR INFORMATION FOR NRC
LICENSE RENEWAL INSPECTION: INSPECTION REPORT 05000461/2024010
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMClinton Resource
RidsNrrDroIrib Resource
R3-DORS
ADAMS Accession Number: ML24092A355
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII
NAME
LRodriguez:gmp
DATE
04/01/2024
OFFICIAL RECORD COPY
Enclosure
LICENSE RENEWAL INSPECTION
REQUEST FOR INFORMATION
I.
ADMINISTRATIVE INSPECTION INFORMATION
Inspection Report Number:
Onsite Inspection Dates:
October 21 - 25, 2024 and November 4 - 8, 2024
Inspection Procedure:
IP 71002, License Renewal Inspection
Lead Inspector:
Lionel Rodriguez, Senior Reactor Inspector
RIII/DORS/EB1
630-829-9609
Lionel.Rodriguez@nrc.gov
Teammates:
Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DORS/EB1
Benny Jose, Senior Reactor Inspector, RIII/DORS/EB2
Muzammil Siddiqui, Reactor Inspector, RIII/DORS/EB1
Cory Padilla, Reactor Inspector, RIII/DORS/EB1
II.
INSPECTION LOGISTICS
Email the following inspection logistics to the lead inspector by October 7, 2024,
or sooner:
1.
Inspection room name/number, directions from the main access facility, and
phone number;
2.
Interview room name/number;
3.
Response team contact information (names and phone numbers) and team roles
(e.g., management sponsor, lead, inspector counterpart);
4.
Any site access/badging and dosimetry actions needed for each inspector;
5.
Entrance meeting time and location;
6.
Confirmation that the team will have access to a licensee computer
with a nearby printer;
7.
Confirmation that the team will have Wi-Fi access;
8.
Cafeteria location and hours;
9.
Inspection response team normal working hours;
10. Any potential resource conflicts during the inspection (e.g., emergency
drills and all-staff meetings); and
11. Current management and engineering organizational chart.
2
INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions
regarding this information request. Provide the information electronically in pdf
files, Excel, or other searchable formats, preferably via an electronic sharing
service (CERTREC, ShareFile, Box, etc.). Specific Excel formats for various
enclosure items may be requested to assist in inspection sample selection. If you
do not have access to any of these services or similar, we can provide you
access to Box, which can be used to upload/download and share documents.
The files should contain descriptive names and be indexed and hyperlinked to
facilitate ease of use. Information in lists should contain enough information to
be easily understood by someone who has knowledge of light water reactor
technology.
1.
Information Requested Prior to the Inspection (August 12, 2024)
The following information is requested by August 12, 2024.
1.1.
The original License Renewal (LR) application and all amendments to
the application as of August 5, 2024.
1.2.
All responses to NRC Requests for Information submitted as of
August 5, 2024.
1.3.
LR application development instructions (scoping and screening,
aging management reviews, operating experience reviews, etc.).
1.4.
LR process instructions (developing aging management review report,
developing the aging management programs, working with the
database, etc.).
1.5.
Listing of plant systems noting if the system has been screened in
scope or out of scope for LR.
1.6.
For each Aging Management Program (AMP) and in scope structure,
system, or component (SSC) provide:
1.6.1
LR scoping/boundary drawing(s);
1.6.2
program basis documents;
1.6.3
references specified in the AMP;
1.6.4
existing procedures (including draft procedures) implementing
the AMP;
1.6.5
a minimum of 10 years of operating experience related to the
AMP;
3
1.6.6
and identify the industry operating experience data bases (e.g.,
INPO, NRC generic communications, vendor notifications, etc.)
searched, and how these searches were conducted to identify
aging effects managed by the AMP.
1.7.
Risk-Ranking of the top 500 components from your site-specific
probabilistic safety analysis (PSA) sorted by Birnbaum Worth. Include
values for Risk Achievement Worth, Risk-Reduction Worth, and
Fussell-Veseley. Please provide the ranking in an excel spreadsheet
that contains the importance measures and the description of the
basic event (e.g., not just the basic event designator).
1.8.
Risk-ranking of the top 500 components (i.e., Large Early Release
Frequency (LERF)) from your site-specific PSA similar to the request in
item 1.5. (Provide in excel format.)
1.9.
Electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical
Requirements Manual.
1.10. Plant system piping and instrumentation diagrams (P&IDs).
1.11. Electronic copies of simplified plant drawings (if available). Note: these
may be uncontrolled documents such as big notes, training diagrams,
etc.
1.12. Any internal/external self-assessments and associated corrective
action documents generated in preparation for the inspection.
2. Information Requested for In-Office Preparation Activities (October 7,
2024)
The following information is requested by October 7, 2024, to facilitate
inspection preparation.
2.1.
As a follow-up to item 1.1 above, provide a copy of all amendments
(if any) to your LR Application submitted after August 5, 2024.
2.2.
As a follow-up to item 1.2 above, provide a copy of all responses
(if any) to NRC Requests for Information submitted after August 5,
2024.
2.3.
Updates (if any) to the information previously provided in items 1.5 and 1.6
above.
2.4.
Provide a list of contact information of individuals responsible for each AMP.
4
3.
Information Requested to be Provided Throughout the Inspection:
3.1.
Any corrective action documents generated as a result of the teams
questions during this inspection as the documents are generated.
3.2.
List of questions and/or document requests submitted by the team and
their status (e.g., open, closed) sorted by inspector. Provide daily by
2:00 p.m. to each inspector. It is recommended to provide the lead
inspector with a master list sorted by inspector and each inspector with
a list containing only the items originated by that inspector.
If you have questions regarding the information requested, please contact the lead inspector.