Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000461/2024011
ML24054A711
Person / Time
Site: Clinton 
(NPF-062)
Issue date: 02/23/2024
From: Benny Jose
NRC/RGN-III/DORS/EB2
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024011
Download: ML24054A711 (1)


See also: IR 05000461/2024011

Text

David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION - REQUEST FOR INFORMATION FOR NRC

COMMERCIAL GRADE DEDICATION INSPECTION: INSPECTION

REPORT 05000461/2024011

Dear David Rhoades:

On May 20, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a commercial

grade dedication (CGD) inspection at Clinton. This inspection will be performed in accordance

with NRC Inspection Procedure 71111.21N.03, Commercial Grade Dedication.

The inspection will evaluate the implementation of Clintons process for dedicating

commercial-grade items, as required in applicable portions of Title 10 of the Code of Federal

Regulations (10 CFR) Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power

Plants and Fuel Reprocessing Plants, to ensure reasonable assurance is provided that these

items will perform their intended safety function. Additionally, the inspection will evaluate

implementation of Clintons procurement process for safety-related components, as required in

Appendix B.

The inspection may include an onsite information gathering visit by the lead inspector. The

inspection will include two weeks onsite and will consist of three NRC inspectors (including the

lead inspector). The current inspection schedule is as follows:

Potential Information Gathering Visit:

April 22 - April 26, 2024

Preparation week:

May 13 - 17, 2024

Onsite weeks:

May 20 - 24, 2024, and June 3-7, 2024

The purpose of the information gathering visit would be to meet with knowledgeable individuals

of your staff to become familiar with the process for dedicating commercial-grade items and the

process for procuring safety-related components at Clinton. This visit would also allow the lead

inspector to meet with procurement engineering and other site individuals responsible for the

inspection to ensure a common understanding of expectations for the inspection. This visit may

include a tour of onsite commercial-grade item dedication facilities, receipt inspection facilities,

storage facilities, and installed plant components associated with potential inspection samples.

During the visit (if performed), the lead inspector will also review the information provided in the

initial information request and may request additional information needed to support the

inspection. Experience with previous baseline inspections of similar depth and length has shown

February 23, 2024

D. Rhoades

2

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into four groups:

The first group lists information necessary for our initial inspection scoping

activities. This information should be provided to the lead inspector no later than

April 1, 2024. The lead inspector will communicate the initial selected set of

samples no later than April 22, 2024.

The second group of documents requested are those items needed to support

our in-office preparation activities. This set of documents should be provided to

the lead inspector no later than May 6, 2024. During the in-office preparation

activities, the team may identify additional information needed to support the

inspection.

The third group includes the additional information above, a schedule of plant

activities associated with the inspection during the onsite period, and any

additional requests resulting from the potential information gathering visit. This

information should be available to the team onsite on May 20, 2024.

The fourth group includes supporting information to be provided throughout the

onsite inspection. Specifically, corrective action documents and answers to

questions developed during the inspection are requested to be provided as the

documents are generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

The lead inspector for this inspection is Benny Jose. We understand that our licensing contact

for this inspection is Chelsie Miller of your organization. If there are any questions about the

inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9756 or via email at Benny.Jose@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

D. Rhoades

3

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Benny Jose, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket No. 05000461

License No. NPF-62

Enclosure:

Commercial Grade Dedication Inspection

Request for Information

cc: Distribution via LISTSERV

Signed by Jose, Benny

on 02/23/24

D. Rhoades

4

Letter to David Rhoades from Benny Jose dated February 23, 2024.

SUBJECT:

CLINTON POWER STATION - REQUEST FOR INFORMATION FOR NRC

COMMERCIAL GRADE DEDICATION INSPECTION: INSPECTION

REPORT 05000461/2024011

DISTRIBUTION:

Farrah Gaskins

RidsNrrDorlLpl3

RidsNrrPMClinton Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

David Curtis

R3-DORS

ADAMS Accession Number: ML24054A711

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

RIII

RIII

RIII

NAME

BJose:gmp

DATE

02/23/2024

OFFICIAL RECORD COPY

Enclosure

COMMERCIAL GRADE DEDICATION INSPECTION

REQUEST FOR INFORMATION

I.

ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number:

05000461/2024011

Onsite Inspection Dates:

May 20-24, 2024, and June 3-7, 2024

Inspection Procedure:

IP 71111.21N.03, Commercial Grade Dedication

Lead Inspector:

Benny Jose, Senior Reactor Inspector,

RIII/DORS/EB2 630-829-9756

Benny.Jose@nrc.gov

Teammates:

Megan Gangewere, Reactor Inspector, RIII/DORS/EB1

Anthony Valiaveedu, Reactor Inspector, RIII/DORS/EB1

II.

LOGISTICS

Email the following inspection logistics to the lead inspector by May 13, 2024, or sooner:

1.

Inspection room name/number, directions from the main access facility, and phone

number.

2.

Interview room name/number.

3.

Response team contact information (names and phone numbers) and team

roles (e.g., management sponsor, lead, inspector counterpart).

4.

Any site access/badging actions needed for each inspector.

5.

Any dosimetry actions needed for each inspector.

6.

Entrance meeting time and location.

7.

Confirmation that the team will have access to a licensee computer with a

nearby printer.

8.

Confirmation that the team will have Wi-Fi access.

9.

Cafeteria location and hours.

10. Inspection response team normal working hours.

11. Any potential resource conflicts during the inspection (e.g., emergency drills

and all-staff meetings).

2

12. Current management and engineering organizational chart.

III. INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding

this information request. Provide the information electronically in pdf files, Excel, or

other searchable formats, preferably via an electronic sharing service (CERTREC,

ShareFile, Box, etc.). Specific Excel formats for various enclosure items may be

requested to assist in inspection sample selection. If you do not have access to any of

these services or similar, we can provide you access to Box, which can be used to

upload/download and share documents. The files should contain descriptive names

and be indexed and hyperlinked to facilitate ease of use. Information in lists should

contain enough information to be easily understood by someone who has knowledge of

light water reactor technology.

1.

Information Requested for Selection of Samples

The following information is requested by April 1, 2024, or sooner, to facilitate the

initial sample selection.

Note: If you are unable to provide items 1.1. through 1.16. as requested, please reach

out to the lead inspector as soon as possible.

1.1.

Risk-Ranking of the top 500 components from your site-specific

probabilistic safety analysis (PSA) sorted by Birnbaum Worth. Include

values for Risk Achievement Worth, Risk-Reduction Worth, and

Fussell-Veseley. Please provide the ranking in an excel spreadsheet that

contains the importance measures and the description of the basic event

(e.g., not just the basic event designator).

1.2.

Risk-ranking of the top 500 components (i.e., Large Early Release

Frequency (LERF)) from your site-specific PSA similar to the request in

Item 1.1. (Provide in Excel format.)

1.3.

Provide a list of the top 500 cut-sets from your PSA. Provide the

descriptions of the basic events in the list of cut-sets. (Provide in Excel

format.)

1.4.

Provide a list of the top 100 cut-sets for each initiator modeled in the PSA

that contributes more than 5 percent to the baseline plant core damage

frequency. (Provide in Excel format.)

1.5.

List of commercial-grade items, with a brief description of application, that

have been dedicated for safety-related applications. These items may be

dedicated by the site or dedicated by a vendor (or other licensee) and

procured by the site. Please note whether the item has been installed in

the plant. Please include the component equipment identification of the

proposed or installed item location which can be correlated to the lists

provided in Items 1.1 and 1.2. The list should encompass the past

six years of dedication activities.

3

1.6.

List of any commercial grade-items that failed after completing the

dedication process. The list should encompass the past 6 years of

dedication activities.

1.7.

List of components procured as safety-related, with descriptions, if not

included above. Please note whether the component has been installed in

the plant. Please include the component equipment identification of the

proposed or installed location which can be correlated to the lists provided

in Items 1.1 and 1.2. The list should encompass the past six years of

procurement activities.

1.8.

List of corrective action program documents, with descriptions, related to

commercial-grade items, procurement, or storage, including any items that

failed after completing the dedication process. The list should encompass

the past six years of these activities.

1.9.

List components procured as safety-related or commercial-grade items

intended to be dedicated for safety-related applications that are on hold

because of concerns identified during receipt, dedication, or from

operating experience/corrective action program as applicable. If possible,

the list should identify the systems and equipment in which these items

were intended for use.

1.10. List of components procured as safety-related or commercial-grade items

dedicated for safety-related applications, in the past six years, where the

procurement/dedication process was expedited to support rapid

turnaround (less than seven days). If possible, the list should identify the

systems and equipment in which these items were intended for use.

1.11. Procedures for dedicating commercial-grade items and for procurement of

safety-related components. Also include procedures controlling

counterfeit, fraudulent, and suspect items.

1.12. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical

Requirements Manual.

1.13. Electronic copies of simplified plant drawings (if available). Note: these

may be uncontrolled documents such as big notes, training diagrams,

etc.

1.14. List of systems, system numbers/designators, and corresponding names.

1.15. List of site contacts that will be associated with the inspection.

1.16. Copy of qualifications, as applicable, of personnel who performed

commercial-grade dedication, safety-related component procurement, and/or

receipt inspection/testing activities within the past six years.

4

2.

Information Requested to Support Inspection Preparation Activities

The following information is requested by May 6, 2024, or sooner, to facilitate

inspection preparation.

This document request is based on typical documents that a generic plant might have.

As such, this document request is not meant to imply that any specific plant is required

to have all of the listed documents. In addition, your plant specific document titles may

vary from the document titles listed below.

This information should be separated for each selected sample, especially if provided

electronically (e.g., folder with sample name that includes specifications, inspection

reports, dedication information, etc.).

2.1.

Purchase requisitions and purchase orders.

2.2.

Other pertinent vendor/licensee correspondence.

2.3.

Original and updated design specifications.

2.4.

Catalog specifications.

2.5.

Procurement basis evaluation such as like-for-like, equivalency, plant

design change packages, drawing and specification updates.

2.6.

10 CFR 50.59 documentation, if applicable.

2.7.

Material receiving reports, packing lists/invoices, and other shipping

documents.

2.8.

Receipt inspection reports and any related test reports.

2.9.

Other documents to trace the item from the time it was dedicated to the

time it was installed, tested, and accepted.

2.10. Certificates of conformance/compliance/quality.

2.11. Vendor test and inspection reports.

2.12. Third-party or sub-vendor test and inspection reports.

2.13. Shelf-life information.

2.14. Vendor dedication/partial dedication information.

2.15. Design/material/process change history information.

2.16. Completed commercial-grade dedication documentation including:

2.16.1 Safety classification;

5

2.16.2 Identification of safety functions/application requirements;

2.16.3 Identification of critical characteristics;

2.16.4 Identification of verification methods and acceptance criteria for the

critical characteristics;

2.16.5 Evaluation of credible failure modes, if applicable; and

2.16.6 Identification of the suppliers quality assurance program that meets

10 CFR Part 50, Appendix B.

2.17. Any deviation from design, material, and performance characteristics

relevant to the safety function (nonconformance dispositions).

2.18. Documents showing objective evidence:

2.18.1 Special test and inspection procedures and results;

2.18.2 Commercial-grade survey reports -item, design, material, and specific

performance characteristic (relevant to safety function); and

2.18.3 Source inspection reports.

2.19. Completed post-installation test procedure and results.

2.20. Completed stock or material issue forms and installation work orders or

reports.

2.21. Historical performance information, including corrective action

documents, maintenance rule performance, failure analysis or root cause

analysis for any failed components, and system health reports related to

the installed components.

3.

Additional Information to be Provided on May 20, 2024, Onsite

3.1. During the in-office preparation activities, the team will be making final

selections and may identify additional information needed to support

the inspection. The lead inspector will provide a list of the additional

information needed during the week of May 13, 2024.

3.2. Schedule of any activities to be conducted on the selected samples

during the two onsite inspection weeks (e.g., installation, testing,

inspection, etc.).

3.3. Schedule of separate interviews with knowledgeable plant personnel

for each of the components selected during the beginning of the first

onsite week. Interviews will discuss the dedication/procurement

process, selected critical characteristics of each sample, installation,

and performance of installed items. This can include, but is not limited

to, plant personnel from Procurement Engineering, other Engineering.

6

3.4. disciplines, Operations, Maintenance, or any other departments that

are cognizant of the dedication/procurement, installation, and

acceptance criteria/methods of each component including

component/system health.

4.

Information Requested to be Provided Throughout the Inspection:

4.1. Any corrective action documents generated as a result of the

teams questions during this inspection as the documents are

generated.

4.2. List of questions and/or document requests submitted by the team and their

status (e.g., open, closed) sorted by inspector. Provide daily by 2 p.m. to

each inspector. It is recommended to provide the lead inspector with a

master list sorted by inspector and each inspector with a list containing only

the items originated by that inspector.

If you have questions regarding the information requested, please contact the lead inspector.