April 13, 2022
SUBJECT:
CLINTON POWER STATION, UNIT 1NRC INITIAL LICENSE EXAMINATION REPORT 05000461/2022301
Dear Mr. Rhoades:
On February 16, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Clinton Station.
The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on January 24, 2022, with Ms. Norha Plumey and other members of your staff. An exit meeting was conducted by telephone on March 9, 2022, between Mr. Bruce Bartlett, Chief Operator Licensing Examiner and Ms. Norha Plumey, Plant Manager to review the proposed final grading of the written examination for the license applicants. During the telephone conversation, NRC resolution of the facilitys post-examination comments, initially received by the NRC on February 16, 2022, were discussed.
The NRC examiners administered an initial license examination operating test during the week of January 17, 2022. The written examination was administered by training department personnel on January 27, 2022. Five senior reactor operator and three reactor operator applicants were administered license examinations. The results of the examinations were finalized on March 11, 2022. Seven applicants passed all sections of their respective examinations. Five applicants were issued senior operator licenses and two applicants were issued operator licenses.
The administered written examination and operating test, as well as documents related to the development and review (outlines, review comments and resolution, etc.) of the examination will be withheld from public disclosure until January 27, 2024. However, since one applicant received a proposed license denial letter because of a written examination grade that was less than 80 percent, the applicant was provided a copy of the administered written examination.
For examination security purposes, your staff should consider that written examination uncontrolled and exposed to the public. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Pelke, Patricia on 04/13/22 Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62
Enclosures:
1. OL Examination Report 05000461/2022301 2. Post-Examination Comments, Evaluation, and Resolutions 3. Simulator Facility Fidelity Report
REGION III==
Docket No: 50-461 License No: NPF-62 Report No: 05000461/2022301 Enterprise Identifier 000474/05000461/L-2022-OLL-0000 Licensee: Constellation Nuclear Facility: Clinton Station Unit 1 Location: Clinton, IL Dates: January 18, 2022 through February 16, 2022 Examiners: B. Bartlett, Senior Operations Engineer, Chief Examiner T. Iskierka-Boggs, Operations Engineer, Examiner J. Nance, Operations Engineer, Examiner T. Wingfield, Operations Engineer, Examiner Approved by: P. Pelke Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS
Examination Report 05000461/2022301; 1/18/2022 - 2/16/2022; Constellation Nuclear;
Clinton Station, Unit 1; Initial License Examination Report.
The announced initial operator licensing examination was conducted by regional U.S. Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.
Examination Summary Seven of eight applicants passed all sections of their respective examinations. Five applicants were issued senior operator licenses and two applicants were issued operator licenses. One applicant was issued a denial letter for failure of one section of the administered examination.
(Section 4OA5.1).
REPORT DETAILS
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11 to develop, validate, administer, and grade the written examination and operating test. The written examination outlines and operating test outlines were prepared by the NRC staff and were transmitted to the licensees staff. Members of the facility licensees staff developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of December 13, 2021, with the assistance of members of the facility licensees staff. During the on-site validation week, the examiners audited eight license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of January 18, 2022, through January 22, 2022. The facility licensee administered the written examination on January 27, 2022.
b. Findings
- (1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement.
During validation of the written examination, several questions were modified or replaced. All changes made to the proposed written examination, were made in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet. The Form ES-401-9, the written examination outlines, and both the proposed and final written examinations, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS) on February 17, 2024, (ADAMS Accession Numbers ML20136A322, ML20136A320, ML20136A321 and ML20136A325, respectively).
On February 17, 2022, the licensee submitted documentation noting that there was one post-examination comment for consideration by the NRC examiners when grading the written examination. The post-examination comment and the NRC resolution for the post-examination comment, are provided in Enclosure 2 to this report.
The NRC examiners graded the written examination on March 7, 2022, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
- (2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Less than 20 percent of the proposed operating test portion of the examination was determined to be unsatisfactory and required modification or replacement.
During the validation of the operating test, several Job Performance Measures (JPMs)were modified or replaced, and some modifications were made to the dynamic simulator scenarios. Changes made to the operating test portion of the examination, were made in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-301-7, Operating Test Comments. The Form ES-301-7, the operating test outlines (ES-301-1 and ES-301-2), and both the proposed and final as administered dynamic simulator scenarios and JPMs, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS on February 17, 2024, (ADAMS Accession Numbers ML20136A322, ML20136A320, ML20136A321 and ML20136A325, respectively).
The NRC examiners completed operating test grading on March 11, 2022.
- (3) Examination Results Five applicants at the Senior Reactor Operator (SRO) level and three applicants at the Reactor Operator (RO) level were administered written examinations and operating tests. Seven applicants passed all portions of their examinations and were issued their respective operating licenses on March 11, 2022. One applicant was issued a denial letter for failure of the written examination.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Part 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG 1021, Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
b. Findings
None.
4OA6 Management Meetings
.1 Debrief
The chief examiner presented the examination teams preliminary observations and findings on January 24, 2022, to Ms. Norha Plumey, Plant Manager and other members of the Clinton Station staff.
.2 Exit Meeting
The chief examiner conducted an exit meeting on March 9, 2022, with Ms. Norha Plumey, Plant Manager by telephone. The NRCs final disposition of the stations grading of the written examination and post-examination comments were disclosed and discussed during the telephone discussion. The chief examiner asked the licensee whether any of the retained submitted material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- N. Plumey, Plant Manager
- M. Beeler, Senior Operations Training instructor
- R. Ringenberg, Manager Operations Training
- D. Shelton, Design Engineer Manager
- R. Hatcher, Human Resources Generalist
- T. Krawcyk, Senior Training Manager
- D. Livingston, Operations Services Manager
- D. Wells, Senior Operations Training instructor
- M. McGuire, Shift Operations Supervisor
U.S. Nuclear Regulatory Commission
- P. Pelke, Chief Operator Licensing Branch
- B. Bartlett, Senior Operations Engineer, Chief Examiner
- T. Wingfield, Operations Engineer, Examiner
- T. Iskierka-Boggs, Operations Engineer, Examiner
- J. Nance, Operations Engineer, Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF ACRONYMS USED
ADAMS Agencywide Documents Access and Management System
CPS Clinton Power Station
CRD Control Rod Drive
ILT Initial License Test
IRM Intermediate Range Monitors
K/A Knowledge/Ability
NRC U.S. Nuclear Regulatory Commission
RO Reactor Operator
SRO Senior Reactor Operator
SIMULATION FACILITY FIDELITY REPORT
Facility Licensee: Clinton Power Station
Facility Docket No: 050-461
Operating Tests Administered: January 18, 2022 - January 22, 2022
The following documents observations made by the U.S. Nuclear Regulatory Commission
examination team during the initial operator license examination. These observations do
not constitute audit or inspection findings and are not, without further verification and review,
indicative of non-compliance with Title 10 of the Code of Federal Regulations, Part 55.45(b).
These observations do not affect U.S. Nuclear Regulatory Commission certification or approval
of the simulation facility other than to provide information which may be used in future
evaluations. No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were
observed:
ITEM DESCRIPTION
1. During a JPM, damper 1VR007B did not open when the applicant
rotated the control switch to the open position. This happened for
three applicants. When the hand switch was held not quite full open
the damper would open. None of the applicants was prevented from
carrying out the critical steps of the JPM due to the hand switch issue.
2. Several IRM indicator lights were mis-labeled. One crew was briefly
impacted during one scenario. None of the applicants was prevented
from carrying out the critical steps.
3. After the scenarios were completed the examiners determined that the
facility would disable the annunciator alarm test feature for NRC
exams to avoid startling the applicants in case they accidently pressed
the wrong annunciator pushbutton. Even though this was minor,
altering the performance of the simulator just for NRC exams is not
acceptable. None of the applicants was prevented from carrying out
critical steps.
4. There were several instances of burned out light bulbs that were
identified by an applicant just prior to a JPM or scenario being used for
the first time. None of the applicants were prevented from carrying out
the critical steps but there were several instances of delayed JPMs.
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
NRC Resolution to the Clinton Power Station Post-Examination Comments
RO Question 26
A reactor startup is in progress.
THEN, the operating (Control Rod Drive) CRD pump trips.
What is the potential impact of immediately restarting the CRD pump without closing the Pump
Stop Chk Discharge Valve (1C11-FO14A/B) and the CRD Flow Control Valve
(1C11-F0002A/B) ?
A. The CRD pump will cavitate.
B. Control rod drive mechanisms will overheat due to the lack of cooling water.
C. The CRD pump will trip on motor overcurrent while the CRD Header repressurizes.
D. Multiple control rods may drift in due to the pressure surge in the Cooling Water Header.
Answer D
Applicant Comment:
None
Facility Comment:
Proposed justification for accepting two correct answers for question #26 (ID 2202939) on the
CPS ILT NRC Written Exam administered on 1/27/22. Clinton Power Station management
supports the challenge to this question.
The question asks what the potential impact is of restarting a control rod drive pump without
closing the discharge check valve and system flow control valve. The intent of the question,
based on the associated K/A, was to ascertain the candidates knowledge of the operational
implications of a Loss of a CRD pump on reactivity control. The challenge is specific to whether
another answer was a potential impact due to the stem conditions.
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
Choice D is the keyed correct answer and remains a correct answer based on the information
presented in the explanation. D is correct. Per N-CL-OPS-201001, Control Rod Drive Hydraulic
System, care must be exercised if the CRD pump trips to ensure the FCV is closed to minimum
prior to restarting a CRD pump otherwise the hydraulic surge may result in rod motion.
The question stem states that during a plant startup the CRD pump trips and is immediately
restarted without closing the discharge check valve or system flow control valve. The stem
does not bound the request with a clarifier, such as most likely, or in accordance with a
reference. The system operating procedure and annunciator response procedure for CRD
pump trip were reviewed and neither contained a direct link to rod motion due to the loss of a
CRD pump. Additionally, the word immediately does not account for the time required to
validate the pump start interlocks are met prior to attempted restart. The time required to
diagnose the trip and validate the pump start interlocks (specifically low oil pressure- see
references for detail) would allow the system to depressurize prior to restarting a CRD pump.
Since the stem used the words 'potential impact' and did not contain sufficient clarification to
limit the answers to only hydraulic surge, a second answer would also be correct. The pump
could trip on overcurrent.
The overcurrent trip could be expected based on information contained in the vendor manual
and in the generic fundamentals training information. The vendor manual states that currents
may be high, if the discharge valve is not closed, and the generic fundamentals material
specifically states that not closing the discharge valve may cause runout, which could result in
an overcurrent trip (to protect the motor). Due to the system being depressurized, which
amounts to no system backpressure, the pump pressure would be low and current would be
high until the system repressurized. Choice C states that the pump would trip on overcurrent
during system re-pressurization and is therefore a potential impact. The overcurrent pump trip
links to reactivity control as the stem states the plant is in startup.
Choice C explanation was only partially correct. The statement that runout would not occur due
to the conditions in the stem is unsupported by the vendor documentation and generic
fundamentals. The explanation incorrectly uses the pressurized system runout of a CRD pump,
while the conditions in the stem would indicate a depressurized system with no back pressure.
C is incorrect but plausible. While it is possible to achieve pump runout with the discharge valve
of the pump open, CRD pump runout is 200 gpm at 3400 ft. head (approx. 1475 psig). This will
not occur under the conditions given in the stem.
Choice C and Choice D do not conflict as both are potential impacts. The impacts are time
dependent on when they could occur. Choice C is possible, after pump start while the system
is depressurized and both valves are open, until backpressure is developed during
re-pressurization. Choice D is possible as the system repressurizes, the high demand seen by
the flow control valve (no flow would result in the FCV being full open) could create a hydraulic
surge condition resulting in rod motion as unrestricted flow is initiated. The flow control valve
would eventually close down, in automatic, but rod motion would be expected prior to that
response.
The other choice explanations (A and B) are not discussed and are accepted as accurate and
the insufficient bounding in the stem does not affect their plausibility nor make them correct.
This was a high miss question by the Candidates. Five (5) of the candidates missed this
question (Question 26) and all five answered Choice C.
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
Conclusion
The stem did not sufficiently bound the answer to only rod motion. The potential impact of
starting the CRD pump, without closing the discharge check valve or flow control valve, could
result in an overcurrent trip condition. Choice C and Choice D would both be correct based on
the stem structure not differentiating the potential impacts. This presents a situation where a
question with an unclear stem confused the applicants (see ES-403, Step D.1.b, bullet 1).
Facility Recommendation
Recommend accepting two choices, Answer C and Answer D, as correct for Question 26.
NRC Evaluation/Resolution:
NUREG-1021, Appendix E, is read to all applicants prior to examination administration and
was read to the applicants for this examination during the NRC examination validation week of
December 13, 2021. A copy was also available during the examination. Appendix E, Page E-2,
states in part (underline added for emphasis), When answering a question, do not make
assumptions regarding conditions that are not specified in the question unless they occur as a
consequence of other conditions that are stated in the question. For example, you should not
assume that any alarm has activated unless the question so states or the alarm is expected to
activate as a result of the conditions that are stated in the question. Similarly, you should
assume that no operator actions have been taken, unless the stem of the question or the
answer choices specifically state otherwise.
The licensee agrees with the correct answer of D and no additional discussion need be made
of the question and the correct answer. To address the recommended answer C, the licensee
assumed that there was a delay of some unquantified time before which the CRD pump is then
restarted. During the delay for the operators to prepare the CRD pump for starting, the licensee
assumes and has some basis in equipment history that the CRD system will depressurize.
Given the depressurization the licensee goes on to state that when the CRD pump is restarted
that motor overcurrent may occur due to system depressurization and pump runout.
The licensee does not go on to discuss why Answer A of cavitation would be wrong even
though they state that pump runout would be occurring. Nevertheless, in order for the CRD
system to depressurize it would take some defined length of time yet the Question stem states
that the CRD pump would be immediately restarted. By definition, immediately means instantly
which would directly lead to the conclusion that no time for pump starting checks was allowed.
As the Question stem did not call for a length of time for pump starting checks but stated that
the CRD pump would be immediately started, and because assumptions are not allowed nor
required in order to answer the question, the licensees position is wrong and is rejected.
POST-EXAMINATION COMMENTS, EVALUATION, AND RESOLUTIONS
CONCLUSION:
Based on the information provided above, the NRC staff concludes that Answer D is the only
correct answer, and no changes to the answer key are required.