Integrated Inspection Report 05000461/2019003
ML19309F220
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/05/2019
From: Kenneth Riemer
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co
References
IR 2019003
Preceding documents:
Download: ML19309F220 (26)


Text

November 5, 2019

SUBJECT:

CLINTON POWER STATION - INTEGRATED INSPECTION REPORT 05000461/2019003

Dear Mr. Hanson:

On September 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station. On October 11, 2019, the NRC inspectors discussed the results of this inspection with Mr. T. Stoner, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects

Docket No. 05000461 License No. NPF-62

Enclosure:

As stated

Inspection Report

Docket Number:

05000461

License Number:

NPF-62

Report Number:

05000461/2019003

Enterprise Identifier: I-2019-003-0067

Licensee:

Exelon Generation Company, LLC

Facility:

Clinton Power Station

Location:

Clinton, IL

Inspection Dates:

July 01, 2019 to September 30, 2019

Inspectors:

J. Beavers, Senior Resident Inspector

S. Bell, Health Physicist

M. Domke, Reactor Inspector

G. Edwards, Health Physicist

M. Garza, Emergency Preparedness Inspector

T. Go, Health Physicist

M. Holmberg, Senior Reactor Inspector

C. Mathews, Illinois Emergency Management Agency

E. Sanchez Santiago, Senior Reactor Inspector

D. Sargis, Resident Inspector

C. St. Peters, Reactor Engineer

L. Torres, Illinois Emergency Management Agency

Approved By:

Kenneth R. Riemer, Chief

Branch 1

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Clinton Power Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status URI 05000461/2019003-01 Unresolved Item Regarding the Primary Calibration of the Heating, Ventilation, and Air Conditioning Effluent Monitor Noble Gas Channel 71124.06 Open

PLANT STATUS

The unit operated at full achievable power (approximately 99 percent power) and approximately 1120 MWe for the majority of the inspection period. On August 3, 2019, the plant was automatically shut down on low reactor water level. The unit returned to full power on August 8, 2019. The unit was shut down on September 16, 2019, for Refueling Outage C1R19.

The unit remained in a shutdown condition through the end of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

External Flooding Sample (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated readiness to cope with external flooding for the following areas:
  • dam inspection on July 15, 2019

71111.04Q - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)residual heat removal 'C' during lowered inventory conditions on September 17, 2019

(2) Division 2 shutdown service water on September 19, 2019
(3) Division 2 emergency diesel generator on September 19, 2019

71111.04S - Equipment Alignment

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the feedwater system on August 21, 2019.

71111.05A - Fire Protection (Annual)

Annual Inspection (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated fire brigade performance during the fire in the turbine building, elevation 762' on September 25, 2019.

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Fire Zone T-1a, turbine building basement, elevation 712-0 on July 5, 2019
(2) Fire Zone D-6a/b, Division 2 diesel generator and day tank room, elevation 737-0 on July 12, 2019
(3) Fire Zone CB-3E, Division 2 nuclear system protection system inverter room, elevation 781-0 on July 19, 2019
(4) Fire Zones A-2n and A-4, Division 1 switchgear room and Division 1 battery room, elevation 781-0 on July 24, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in:

(1) auxiliary electrical equipment room on September 3, 2019

71111.07A - Heat Sink Performance

Annual Review (IP Section 02.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) leakage past 1CC075A and 1CC076A impact to ultimate heat sink on August 14, 2019

71111.08G - Inservice Inspection Activities (BWR)

BWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding Activities (IP Section 03.01) (1 Partial)

(1)

(Partial)

The inspectors verified that the reactor coolant system boundary, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from September 23, 2019 to September 30, 2019:

03.01.a - Nondestructive Examination and Welding Activities.

1. Volumetric, ultrasonic, manual examination of reactor pressure vessel nozzle,

N10, inner radius welds for ASME category B-D located within the bio-shield of the containment drywell

2. Volumetric, ultrasonic, manual examination of reactor recirculation weld, 1-

RR-AC-1, for ASME category R-A located in the drywell 750 elevation

3. Volumetric, ultrasonic, manual examination of reactor pressure vessel head

meridional weld, CH-ME, at 255° for ASME category B-A located on the refueling floor

4. Volumetric, ultrasonic, manual examination of reactor pressure vessel head

meridional weld, CH-MF, at 315° for ASME category B-A located on the refueling floor

5. Surface, magnetic particle examination of one third of reactor pressure vessel

head-to-flange weld, CH-C-2 (1/3), for ASME category B-A located on the refueling floor

6. *IN-PROGRESS* pressure boundary weld(s) review

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control room during unit restart following SCRAM on August 5, 2019.
(2) The inspectors observed and evaluated licensed operator performance in the control room during planned reactor shutdown for Refueling Outage C1R19 on September 15, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated Just-in-Time training to prepare for the upcoming outage on September 3, 2019.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1)electrohydraulic control system on September 3, 2019 (2)emergency core cooling ventilation system on August 29, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1)liquid discharge, elevated risk due to first liquid discharge in 27 years, Work Order

===4955690-13 (2)heavy lift over main turbine for outage mobilization on September 5, 2019 (3)planned Yellow risk for reactor core isolation cooling valve operability checks on September 6, 2019 (4)shutdown risk Yellow due to lowered inventory on September 17, 2019 (5)shutdown risk Yellow due to shutdown cooling on September 18, 2019 (6)shutdown risk Yellow due to electrical power work on September 19, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02)===

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Action Request 4258762, #4 BPV [bypass valve] Stuck Full Open During 9072.10 on July 11, 2019
(2) Action Request 4279700, SRM [source range monitor] B Failed Linear Response on September 18, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Engineering Change 624142, Slip-on Flange on 1RH19BB-4
(2) Engineering Change 625821, Modify Unit Sub B for Reliable VC [control room heating, ventilation, and air conditioning] Load Shedding

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post maintenance tests:

(1)shutdown service water hydromotor 1SX019B rebuild post maintenance test on June 7, 2019 (2)reactor core isolation cooling water leg pump post maintenance testing on July 25, 2019 (3)source range monitor channel B post maintenance test on September 19, 2019

(4) Division 3 shutdown cooling water pump post maintenance test on July 22, 2019

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1)

(Partial)

The inspectors evaluated Refueling Outage C1R19 planning activities and outage activities from September 9 through October 31, 2019.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Clinton Power Station (CPS) 9061.10, Fuel Pool Cooling Valve Operability, on July 26, 2019 (2)diesel generator operability - independent verification on September 15, 2019 (3)heatup/cooldown, inservice leak and hydrostatic 30 minute temperature log on September 16, 2019
(4) CPS 9069.01, Shutdown Service Water Operability Test, on July 8, 2019

Containment Isolation Valve Testing (IP Section 03.01) (2 Samples)

(1)upper air lock barrel leak rate test on September 15, 2019

(2) high pressure core spray injection valve local leak rate test on September 17, 2019

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
  • Evaluation 18-45, Exelon Nuclear Standardized Radiological Emergency Plan, Revision 30

This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Technical Support Center drill on August 13,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 02.01) (1 Sample)

The inspectors evaluated radiological hazards assessments and controls.

(1) The inspectors reviewed the following:

Radiological Surveys

  • C1R19 Drywell 768 9/19/2019 through 9/26/2019
  • C1R19 Refuel Floor 828 09/16/2019 through 09/22/2019
  • C1R19 Drywell 755 09/19/2019 through 09/20/2019

Risk Significant Radiological Work Activities

  • C1R19 Drywell Emergent Activities
  • C1R19 Refuel Floor Activities (No Cavity Access)
  • C1R19 Refuel Floor IVVI Activities
  • C1R19 Drywell Bioshield ISI Activities

Air Sample Survey Records

  • Sample 19-231; C1R19 Refuel Floor 09/16/2019 10:10
  • Sample 19-240; C1R19 Refuel Floor Cavity 09/17/2019 00:40
  • Sample 19-253; C1R19 Refuel Floor 09/18/2019 23:15

Instructions to Workers (IP Section 02.02) (1 Sample)

The inspectors evaluated instructions to workers including radiation work permits used to access high radiation areas.

(1) The inspectors reviewed the following:

Radiation Work Packages

  • CL-1-19-00543; C1R19 Drywell Emergent Work; Revision 3
  • CL-1-19-00902; C1R19 Refuel Floor Activities (No Cavity Access); Revision 0
  • CL-1-19-00903; C1R19 Refuel Floor Cavity Platform IVVI; Revision 0

Electronic Alarming Dosimeter Alarms

  • Dosimeter Dose Rate Alarm 05/06/2018 01:23
  • Dosimeter Dose Rate Alarm 05/07/2018 14:28
  • Dosimeter Dose Rate Alarm 05/24/2018 04:39
  • Dosimeter Dose Rate Alarm 06/21/2019 11:06
  • Dosimeter Dose Rate Alarm 09/22/2019 02:52

Labeling of Containers

  • Five refueling equipment containers on north side of containment refueling floor

Contamination and Radioactive Material Control (IP Section 02.03) (1 Sample)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.

(1) The inspectors verified the following sealed sources are accounted for and are intact:

Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Sample)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1) There were no radiological work package for areas with airborne radioactivity available for review during the inspection.

High Radiation Area and Very High Radiation Area Controls (IP Section 02.05) (1 Sample)

(1) The inspectors evaluated risk-significant high radiation area and very high radiation area controls.

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 02.06) (1 Sample)

(1) The inspectors evaluated radiation worker performance and radiation protection technician proficiency.

71124.02 - Occupational ALARA Planning and Controls

Implementation of ALARA and Radiological Work Controls (IP Section 02.03) (1 Sample)

The inspectors reviewed as low as reasonably achievable practices and radiological work controls.

(1) The inspectors reviewed the following activities:
  • CL-1-19-00543; C1R19 Drywell Emergent Work; Revision 3
  • CL-1-19-00902; C1R19 Refuel Floor Activities (No Cavity Access); Revision 0
  • CL-1-19-00903; C1R19 Refuel Floor Cavity Platform IVVI; Revision 0

Radiation Worker Performance (IP Section 02.04) (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance during the following activities:

(1)

  • CL-1-19-00543; C1R19 Drywell Emergent Work; Revision 3
  • CL-1-19-00902; C1R19 Refuel Floor Activities (No Cavity Access); Revision 0
  • CL-1-19-00903; C1R19 Refuel Floor Cavity Platform IVVI; Revision 0

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Engineering Controls (IP Section 02.01) (1 Sample)

The inspectors evaluated airborne controls and radioactive monitoring.

(1) The inspectors reviewed the following:

Installed Ventilation Systems

  • Drywell Purge Trains 0VQ07FC at 702 Control Building

Temporary Ventilation System Setups

  • There were none available for review during this inspection.

Portable or Installed Monitoring Systems

  • Three Portable Ventilation Units Containing HEPA/Charcoal at Various Elevations inside the Drywell

Use of Respiratory Protection Devices (IP Section 02.02) (1 Sample)

The inspectors evaluated the licensees use of respiratory protection devices by:

(1) Observing in-field applications; verifying the licensee validated the level of protection provided by the devices; inspecting the material condition of devices, reviewing records and certification of devices issued for use; reviewing the qualifications of workers that use the devices; and observing workers donning, doffing and testing devices.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 02.03) (1 Sample)

The inspectors evaluated self-contained breathing apparatus program implementation.

(1) The inspectors reviewed the following:

Status and Surveillance Records for Self-Contained Breathing Apparatus

  • Ultra Elite MSA Firehawk PD-065
  • Ultra Elite MSA Premier P-17
  • Ultra Elite MSA Premier P-12

Self-Contained Breathing Apparatus Fit for On-Shift Operators

  • MSA Firehawk PD-063; Operator 1
  • MSA Firehawk PD-106; Operator 2

Self-Contained Breathing Apparatus Maintenance Check

  • Ultra Elite MSA Firehawk P-123
  • Ultra Elite MSA Firehawk P-7

71124.04 - Occupational Dose Assessment

Source Term Categorization (IP Section 02.01) (1 Sample)

(1) The inspectors evaluated the licensees characterization of the source term and use of scaling factors for the use of hard-to-detect radionuclide activity.

External Dosimetry (IP Section 02.02) (1 Sample)

(1) The inspectors evaluated the external dosimetry program implementation.

Internal Dosimetry (IP Section 02.03) (1 Sample)

The inspectors evaluated the internal dosimetry program implementation.

(1) The inspectors reviewed the following:

Whole Body Counts

  • Whole Body Count Intake Investigation 02/08/2019
  • Whole Body Count Intake Investigation 10/19/2018

In-Vitro Internal Monitoring

  • There were no In-Vitro Internal Monitoring Investigations during this inspection period.

Dose Assessments Performed Using Air Sampling and Derived Air Concentration-Hour Monitoring

  • TEDE ALARA Evaluation Screening Worksheet for Reactor Disassembly-Reassembly; Reactor Cavity Entry-Reactor Head

Special Dosimetric Situations (IP Section 02.04) (1 Sample)

The inspectors evaluated the following special dosimetric situation:

(1) Licensees implementation of requirements to manage radiation protection of declared pregnant workers for three workers, application of NRC-approved external dosimetry methods (i.e. EDEX), shallow dose equivalent and neutron dose assessments.

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:

(1)

  • Liquid radioactive waste effluent Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)

The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:

(1)

  • Liquid radiation monitor sensitivities to I-131 and setpoint determination; 11/30/1999
  • HVAC System Effluent Exhaust monitor PR001 calibration; 01/08/2019

Sampling and Analysis (IP Section 02.03) (1 Sample)

The inspectors reviewed the following:

(1) Radioactive Effluent Sampling and Analysis Activities
  • Offgas pretreatment effluent; 08/20/2019

Effluent Discharges

  • There were none available for review during the inspection.

Instrumentation and Equipment (IP Section 02.04) (1 Sample)

The inspectors reviewed the following radioactive effluent discharge system surveillance test results:

(1) Standby Gas Treatment System Train A tests 03/20/2018

Dose Calculations (IP Section 02.05) (1 Sample)

The inspectors reviewed the following to asses public dose:

(1) Liquid and Gaseous Discharge Permits
  • Gaseous continuous effluent permit 07/26/2019
  • Gaseous continuous effluent permit 07/15/2019

Annual Radiological Effluent Release Reports

Abnormal Gaseous or Liquid Tank Discharges

  • There were none available for review during this inspection.

71124.07 - Radiological Environmental Monitoring Program

Site Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the radiological environmental monitoring program implementation.

(1) The inspectors reviewed the following:

Walkdowns, Calibrations, and Maintenance Record Review

  • Air Sampling Station CL-2
  • Air Sampling Station CL-3
  • Air Sampling Station CL-94
  • Optically Stimulated Luminescent Dosimeter (OSLD) Monitoring Station CL-2
  • OSLD Monitoring Station CL-3
  • OSLD Monitoring Station CL-94

Environmental Sample Collections and Preparation Observation

  • Sampling not available due to pre-determined sample scheduling that was contrary to onsite inspection time frame.

Licensee Actions in Response to Missed Sample, Inoperable Sampler, Lost TLD or Anomalous Measurement

  • CL-115; Food Product; Insufficient Vegetation Collected; 07/25/2018
  • CL-118; Food Product; Insufficient Vegetation Collected; 07/25/2018
  • CL-114; Food Product; Insufficient Vegetation Collected; 08/29/2018

Sampling Program for the Potential of Licensed Material Entering Groundwater

  • Monitoring Well MW-CL-13I
  • Monitoring Well MW-CL-13S
  • Monitoring Well MW-CL-14S

Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed licensee actions as a result of a 2006 onsite release of the Cycled Condensate System Tank.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (07/01/2018 - 06/30/2019)

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) Unit 1 (07/01/2018 - 06/30/2019)

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) Unit 1 (07/01/2018 - 06/30/2019)

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (1 Sample)

(1) Unit 1 (09/5/2018 - 09/9/2019)

BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)

(1) Unit 1 09/01/2018 - 06/01/2019

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1)04/01/2018 - 06/30/2019

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample.

(IP Section 02.16) (1 Sample)

(1)09/01/2018 - 06/01/2019

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Action Request 4221847, 1A Diesel Generator Fuel Priming Pump Motor Sparking

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)

(1) The inspectors evaluated an automatic reactor scram on low reactor water level and the licensees response on August 3, 2019.

Personnel Performance (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated an arc flash event and worker injury on September 11,

INSPECTION RESULTS

Unresolved Item (Open)

Unresolved Item Regarding the Primary Calibration of the Heating, Ventilation, and Air Conditioning Effluent Monitor Noble Gas Channel URI 05000461/2019003-01 71124.06

Description:

The licensee was unable at the time of the inspection to provide records of its primary calibration of the station heating, ventilation, and air conditioning exhaust effluent monitor 0RIX-PR001/2 for the high range noble gas channel.

Planned Closure Actions: Upon receipt of the licensees documentation, the agency will perform its review to determine if a performance deficiency occurred.

Licensee Actions: The licensee was performing a review of the effluent monitors primary calibration to locate the applicable records and information. Once complete, this will be forwarded to the Agency for its review.

Corrective Action References: Action Request 4282015

Observation: Review of Action Request 4221847, 1A Diesel Generator Fuel Priming Pump Motor Sparking 71152 During the inspection quarter, the inspectors reviewed the licensees corrective actions associated with Action Request 4221847, 1A Diesel Generator Fuel Priming Pump Motor Sparking. The inspectors assessed the following performance attributes in their review:

  • complete and accurate identification of the problem in a timely manner commensurate with its safety significance and ease of discovery;
  • consideration of the extent of condition, generic implications, common cause, and previous occurrences;
  • evaluation and disposition of operability/functionality/reportability issues;
  • classification and prioritization of the resolution of the problem commensurate with safety significance;
  • identification of corrective actions, which were appropriately focused to correct the problem; and
  • completion of corrective actions in a timely manner commensurate with the safety significance of the issue.

The inspectors selected this sample due to the potential impact to the operability of the associated diesel generator; a safety significant system. After further testing performed on the fuel priming pump, it was determined it would have been able to fulfill its safety function; therefore, the diesel generator remained operable. The inspectors review focused on whether the licensee had sufficient information prior to the fuel priming pump motor sparking to determine there was a degraded condition. There were indications of oil leaks in the area that had the potential to leak onto the pump but the corrective action documents that described these leaks did not specify whether an impact to the fuel priming pump was identified. Based on the information reviewed the inspectors concluded there was not a performance deficiency associated with this issue.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 11, 2019, the inspectors presented the integrated inspection results to Mr. T. Stoner, Site Vice President, and other members of the licensee staff.
  • On August 22, 2019, the inspectors presented the Radiation Protection inspection results to Mr. G. Olsen - Maintenance Director and other members of the licensee staff.
  • On September 27, 2019, the inspectors presented the Radiation Protection inspection results to Mr. T. Stoner, Site Vice President, and other members of the licensee staff.
  • On October 3, 2019, the inspectors presented the Emergency Preparedness inspection results to Mr. L. Baker, EP Fleet Programs Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04S

Corrective Action

Documents

AR 4267205

EOID - Through Wall Leak Immediately Upstream of

1CB050A

07/26/2019

Drawings

Drawing M05-

1004

P&ID Reactor Feedwater (FW)

AH

Drawing M05-

1005

P&ID Condensate (CD)

AH

Drawing M05-

1006

P&ID Condensate Booster (CB)

P

Procedures

CPS

3103.01E001

Feedwater Electrical Lineup

13a

CPS

3103.01V001

Feedwater Valve Lineup

71111.05A

Corrective Action

Documents

AR 4282239

Electrical Cable Fire at 762 Turbine Hallway

09/25/2019

AR 4282262

Documentation of No-Call EAL for TB Fire per EP-AA-120

09/25/2019

AR 4282649

Critique for Response to Fire at 762 TB on 09/25/2019

09/25/2019

Procedures

CPS

1893.04M720

2 Turbine: Turbine Auxiliaries Prefire Plan

6c

71111.05Q Corrective Action

Documents

AR 4255569

9071.13 FP CO2 Sys Auto Actuation (Div 2 DG)

06/09/2019

Procedures

CPS

1893.04M512

737 Diesel Generator: Div 2 Diesel Generator & Day Tank

Room Prefire Plan

7b

CPS

1893.04M700

2 Turbine: Basement Prefire Plan

6b

OP-AA-201-004

Fire Prevention for Hot Work

Work Orders

WO 4762970

Hot Tap Line Per EC to Improve Water Delivery During

Outage

08/30/2019

71111.06

Procedures

CPS

1893.04M351

781 Control: Aux. Elect. Equip., Inverter & Battery Rooms

Prefire Plan

7d

CPS 4304.01

Flooding

6c

71111.07A

Corrective Action

Documents

AR 4053236

Unexpected CCW Tank Level Increase During 1RIX-PR004

CAL

09/18/2017

AR 4130127

1CC075A and 1CC076A Leaking By

04/24/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 4130828

NRC Question on Last Performance of 9861.09D006

04/25/2018

AR 4139396

9861.09 & Data Sheets - SX Boundary Leak Test Proc.

Changes

05/20/2018

AR 4258659

CCP Procedures 9861.09D006/7 Cannot Be Performed as

Written

06/21/2019

AR 4264675

9861.09D0006 Exceeds Admin Limit

07/17/2019

AR 4268801

Leakage Table Parameters Wrong in 9861.09

08/01/2019

Corrective Action

Documents

Resulting from

Inspection

AR 4268907

NRC IDd Error in SX Boundary Leakage Procedure

Pressures

08/01/2019

Engineering

Changes

EC 624294

Maximum Flow from 3/4 SX Hose Test Connection

EC 624532

9861.09 & Data Sheets - SX Boundary Leak Test Proc.

Changes Supporting Information

EC 628812

Evaluate Leakage from UHS for Valves 1CC075A and

1CC076A

Miscellaneous

Design Analysis

IP-M-0563

Determination of Allowable Leak Rates and Loss of UHS

Volume from Shutdown Service Water (SX) Boundary

Valves

2/13/2012

Procedures

CPS 9861.09

Shutdown Service Water Boundary Valve Leak Testing

CPS

9861.09D006

Leakage Test on Valve 1CC075A and 1CC076A

2a

71111.08G Corrective Action

Documents

4134785

Low Thickness Readings Discovered on B RHR Min Flow

Piping

05/05/2018

4135345

Erosion on 1E12F018B Valve Internals

05/07/2018

4136024

Need RHR B Alternate Valves

05/09/2018

Corrective Action

Documents

Resulting from

Inspection

282058

Revision of GEH-UT-300 is Required

09/25/2019

282747

NRC ISI: Wear Rate Methodology in EC 624182

09/27/2019

283049

NRC ID Questions on Work Order 1230601-01/39

09/28/2019

283637

Follow-Up to IR 4283049, Questions on Work Order 230601

09/30/2019

NDE Reports

C1R19-008

Examination Summary Sheet

09/23/2019

C1R19-009

Examination Summary Sheet

09/23/2019

C1R19-011

Examination Summary Sheet

09/25/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

C1R19-MT-006

Magnetic Particle Examination

09/23/2019

C1R19-UT-031

UT Calibration/Examination

09/26/2019

Procedures

ER-AA-335-003

Magnetic Particle Examination

ER-AA-430-1004

Erosion in Piping and Components (EPC) Guide

GEH-PDI-UT-1

PDI Generic Procedure for the Ultrasonic Examination of

Ferritic Welds

GEH-UT-300

Procedure for Manual Examination of Reactor Vessel

Assembly Welds in Accordance with PDI

WPS 1-1-GTSM-

PWHT

ASME Welding Procedure Specification Record

71111.12

Corrective Action

Documents

AR 4139393

Found Fuses Blown for Fast Open Acting Solenoids

05/20/2018

AR 4193090

(A)(1) Determination for MR Function LAS-2-FUEL-02

11/08/2018

AR 4214931

GE MK II EHC Circuit Cards Are Now Obsolete

01/29/2019

AR 4257126

BPV #1 Fast Acting Solenoid Did Not Energize During

9072.01

06/15/2019

AR 4258812

BPV #3 Fast Acting Solenoid Did Not Energize During

9072.01

06/22/2019

Miscellaneous

ER-AA-310-1005

(a)(1) Action Plan Development and Action Plan (Monitoring)

Goal Setting Template

Work Orders

WO 1525186

Replace Fast Opening Solenoid Valve - 1C85F013

10/09/2013

WO 1525189

Replace Fast Opening Solenoid Valve - 1C85F022

10/10/2013

71111.13

Procedures

CPS 9054.02

Reactor Core Isolation Cooling Valve Operability Checks

43c

HU-AA-1211-F-01

Briefing Topic Supplemental Form

MA-AA-716-021

Rigging and Lifting Program

WC-AA-104-F-01

Risk Screening/Mitigation Plan

Work Orders

WO 4840584

Pre-Outage Mobilization & Demobilization Turbine Deck

08/28/2019

WO 4946966

9054.02A20 OP RCIC Valve Operability (D001)

08/01/2019

WO 4955690

Ops Perform a Liquid Radioactive Discharge

09/10/2019

71111.15

Corrective Action

Documents

AR 289539289539Provisions for Liquid Tight Jacket Repair

01/11/2005

AR 4257126

BPV #1 Fast Acting Solenoid did not Energize During

9072.01

06/15/2019

AR 4258298

Fast Acting Fuse Blew While Testing BPV 1

06/20/2019

AR 4258762

  1. 4 BPV Stuck Full Open During 9072.01

06/22/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 4258812

BPV #3 Fast Acting Solenoid did not Energize During

9072.01

06/22/2019

AR 4261761

SBV #1 FAS Plunger Stuck

07/03/2019

AR 4262116

Bypass Valve 1C85F0012: Leaking Steam by Seat

07/05/2019

AR 4262629

9072.01 Steam Bypass Valve Tests Surveillance Has Gone

Late

07/07/2019

AR 4279700

SRM B Failed Linear Response

09/13/2019

Procedures

CPS 9072.01

Steam Bypass Valve Tests

34d

71111.18

Corrective Action

Documents

AR 4134785

Low Thickness Readings Discovered on B RHR Min Flow

Piping

05/05/2018

AR 4135297

APS As Found: 1E12D001B Replacement Not Like for Like

05/07/2018

AR 4264806

NOS ID: Issues with UFSAR Changes Related to Design

Changes

07/17/2019

Drawings

Drawing M05-

1075

P&ID Residual Heat Removal (RH)

AO

Engineering

Changes

EC 624142

Slip-On Flange on 1RH19BB-4

Work Orders

WO 1230601-01

When Required, Replace Eroded RHR B Pump Min Flow

Line

05/13/2018

71111.19

Work Orders

29176

SRM B

WO 1784832-01

1SX019B Parts Issues with Linear Converter Rebuild

06/04/2019

WO 1784832-02

1SX019B Parts Issues with Linear Converter Rebuild

06/04/2019

WO 1784832-09

1SX019B Parts Issues with Linear Converter Rebuild

06/06/2019

WO 4582718-28

EM 1SX019B: Re-Install Hydramotor Following MMD Work

06/06/2019

WO 929176-70

Perform Detector Testing After Replacement

09/16/2019

71111.20

Procedures

C1R19 Master

(Fall 2019)

Master Work Activity List

09/10/2019

SSMP Final

C1R19 Shutdown Safety Management Program

71111.22

Corrective Action

Documents

AR 4245341

2017 PMMR Created Incorrectly

05/01/2019

Miscellaneous

CL-SURV-012

Clinton PRA Application Notebook; Risk Assessment Missed

Surveillance - Upper Containment Air Lock Barrel; IR

243061

Procedures

CPS 1305.01

Primary Containment Leakage Rate Testing Program

2c

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CPS

1305.01F002

Type C Local Leak Rate Summary Sheet

CPS

9000.06D001

Heatup/Cooldown, Inservice Leak and Hydrostatic 30 Minute

Temperature Log

30b

CPS 9080.10

DG Operability - Independent Verification

30c

CPS 9843.01

IST Category A Valve Leak Rate Test

36c

CPS

9843.01V005

Leak Rate Testing of HPCS Injection

27d

CPS

9861.03D001

Upper Air Lock Barrel Leak Rate Test

21d

ER-AA-600-1045

Risk Assessments of Missed or Deficient Surveillances

Work Orders

WO 1544886-02

MC003G01 LLRT: 1MC-03W CT Upper Air Lock Barrel

11/19/2013

WO 4571040-01

9059.01R20 LRT Vessel Pressure Test

05/13/2018

WO 4636109-02

MC003G01 LLRT: 1MC-03W CT Upper Air Lock Barrel

09/15/2019

WO 4781175

9843.01 10 LRT Cat A VLV LRT (1E22-F004) HPCS INJ

09/17/2019

71114.04

Miscellaneous

Evaluation 18-45

Exelon Nuclear Standardized Radiological Emergency Plan

2/14/2019

71124.01

Corrective Action

Documents

AR 4133783

RPID: Dose Rate Alarm

05/02/2018

AR 4201060

RPID: High Beta Dose Rates on Source U-080

2/07/2018

AR 4259704

RPID: Elevated Dose Rates on Pipe in 737 AB

06/26/2019

AR 4264713

RPID: Rad surv HU Improvement Opportunity

07/17/2019

AR 4265692

RPID: Potential Weakness in Rad surv Security

07/20/2019

Miscellaneous

ED Dose and Dose Rate Alarm Logs 01/01/2018 through

09/23/2019

Weekly Locked High Radiation Area Checklist

09/13/2019

Nation Source Tracking System Annual Reconciliation

01/06/2019

L80526

Dry Active Waste 10 CFR 61 Analysis

2/01/2018

Procedures

RP-AA-460

Controls for High and Locked High Radiation Areas

Radiation

Surveys

Radioactive Source Leak Test

06/20/2019

2019-053210

C1R19 BRAC Point Radiological Surveys

09/23/2019

Self-Assessments AR 4200413

Pre NRC Inspection 71124.01 Radiological Hazards

Assessment and Exposure Controls

03/28/2019

NOSA-CPS-17-06 Radiation Protection Audit Report

07/18/2017

71124.02

ALARA Plans

CL-1-18-00901

Disassembly and Reassembly/Cavity Lift Installation Post

05/23/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Job Review

CL-1-18-00902

RFF Activities/Cavity Lift Installation Post Job Review

05/09/2018

CL-1-19-00543

C1R19 Drywell Emergent Work

CL-1-19-00902

C1R19 Refuel Floor Activities (No Cavity Access)

CL-1-19-00903

C1R19 Refuel Floor Cavity Platform IVVI

Corrective Action

Documents

AR 4189624

RPID: Lack of Rigor in ALARA Planning

10/30/2018

AR 4277962

RPID: Potential C1R19 Dose savings

09/10/2019

AR 4278446

RPID: ALARA Plan Under 25% original estimate

09/11/2019

Miscellaneous

C1R19 Station Alara Committee Meeting Notes

09/25/2019

C1R18 RP/ALARA Refueling Outage Report

71124.03

Calculations

RWP 1900901

TEDE ALARA

Evaluation

Screening

Worksheet

C1R19 FF RX Disassembly/Reassembly Activities

08/20/2019

Calibration

Records

0VG015B

Standby Gas Treatment System Charcoal Absorber B Test

2/14/18

0VG08FA

Standby Gas Treatment System Charcoal Adsorber A

03/20/2018

0VQ01SC

Drywell Purge Filter Train C Absorber and HEPA Filter Test

05/11/2017

Corrective Action

Documents

AR 4156414

Incorrect Redon Protocol Selected During Respirator Fit

Test

07/17/2018

Miscellaneous

Posi3 USB Test

Results

0Y244871

MSA Ultralite Complete SCBA Test

08/16/2019

Posi3 USB Test

Results 0Y33112

MSA Ultralite Complete SCBA Test

08/16/2019

71124.04

Calculations

RWP 1900622

TEDE ALARA

Evaluation

Screening

Worksheet

C1R18 AB/CT Insulation Activities ECCS Insulation

Removal HEPA or Wet

09/28/2018

RWP 1900903

TEDE ALARA

Evaluation

screening

C1R19 Cavity Platform IVVI and Associated Activities

08/20/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Worksheet

Calibration

Records

RP-AA-210-1001

Multiple Dosimetry EDE Evaluation Sheet

09/19/2019

Miscellaneous

NISP-RP-006

Personnel Contamination Event Log on PCE #3

09/21/2019

NVLAP Landauer,

Inc.

Scope of Accreditation to ISO/IEC 17025:2005 NVLAP Code

100518-0

01/01/2019

RP-AA-210-1001

Multiple Dosimetry Issue Log Single Entry on a GE Hitachi

Personnel

09/27/2019

RP-AA-270

Declaration of Pregnancy Paperwork from 04/24/2017

through 05/10/2019

71124.06

Calibration

Records

WO 04666126-02

HVAC System Exhaust PRM CC (PR001)

01/08/2019

WO04660214-01

SGST Flow Monitor 0FT-VG001

11/27/2018

WO04682965-01

Main Stack Flow Mon 0FT-VR500

2/25/2019

WO04686837-01

Calibration of Liquid PRM 1RIX-PR036

2/20/2019

Corrective Action

Documents

AR 04133155

ODCM: Chem Unable to Obtain VR/VQ Sample due to

Equipment Issue

05/01/2018

AR 04220189

Missed ODCM NG and Tritium Sample due to Equipment

Malfunction

2/14/2019

AR 04222110

IRIX-PR036 Comp, Grab Sample Analysis Missed

2/21/2019

Miscellaneous

2018 Annual Land Use Census Evaluation and Summary

10/10/2018

2017 Annual Radioactive Effluent Release Report;

04/23/2018

2018 Annual Radioactive Effluent Release Report;

04/25/2019

Offgas Pre-Treatment Gamma Spectroscopy Analysis

08/20/2019

Procedures

CY-CL-6949-01

Off-gas Pre Treatment Sampling and Analysis

CY-CL-6954-01

HVAC Stack Effluent Noble Gas and Tritium

CY-CL-6954-02

HVAC Stack Effluent - Iodine and Particulates

Self-Assessments AR 04203312

NRC Inspection: Radioactive Gaseous and Liquid Effluent

Treatment

06/28/2019

Work Orders

01930276-04

Standby Gas Treatment Train A Charcoal/Heater/HEPA

Testing

03/20/2018

71124.07

Calibration

Records

Serial Number

3K620000007433

Field Rotameter Calibration

2/05/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Serial Number

3K620000007433

Field Rotameter Calibration

05/06/2019

Corrective Action

Documents

AR 04104312

ODCM Air Samplers CL-7, CL-8, CL-15 & CL-94 Timer

Shortages

2/14/2018

AR 04112366

ODCM Environmental Area TLDS CL-35 Missing

03/07/2018

AR 04125532

ODCM: Air Samplers CL-3, CL-4 and CL-6 Timer Shortages 04/11/2018

AR 04128517

ODCM Water Compositor Cl-91 Sample Line or Header

Clogged

04/18/2018

AR 04163281

REMP: Weekly Air Particulate and Iodine Cartridges

Missing

08/10/2018

Miscellaneous

Annual Radiological Environmental Operating Report;

January 01, 2018 - December 31, 2018

04/25/2019

2018 Annual Land Use Census Evaluation and Summary

10/18/2018

Monthly Report on the Meteorological Monitoring Program at

the Clinton Power Station February 2018

04/11/2018

Monthly Report on the Meteorological Monitoring Program at

the Clinton Power Station August 2018

10/22/2018

Monthly Report on the Meteorological Monitoring Program at

the Clinton Power Station February 2019

04/15/2019

Procedures

CY-AA-170-1001

Environmental Dosimetry - Performance Specifications,

Testing, and Data Analysis

Self-Assessments AR 4203308

NRC Inspection: Radioactive Effluent Monitoring Program

(IP 71124.07)

06/28/2019

71153

Corrective Action

Documents

AR 4278245

Arc Flash Event

09/11/2019