November 5, 2019
SUBJECT:
CLINTON POWER STATION - INTEGRATED INSPECTION REPORT 05000461/2019003
Dear Mr. Hanson:
On September 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station. On October 11, 2019, the NRC inspectors discussed the results of this inspection with Mr. T. Stoner, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects
Docket No. 05000461 License No. NPF-62
Enclosure:
As stated
Inspection Report
Docket Number:
05000461
License Number:
Report Number:
Enterprise Identifier: I-2019-003-0067
Licensee:
Exelon Generation Company, LLC
Facility:
Clinton Power Station
Location:
Clinton, IL
Inspection Dates:
July 01, 2019 to September 30, 2019
Inspectors:
J. Beavers, Senior Resident Inspector
S. Bell, Health Physicist
M. Domke, Reactor Inspector
G. Edwards, Health Physicist
M. Garza, Emergency Preparedness Inspector
T. Go, Health Physicist
M. Holmberg, Senior Reactor Inspector
C. Mathews, Illinois Emergency Management Agency
E. Sanchez Santiago, Senior Reactor Inspector
D. Sargis, Resident Inspector
C. St. Peters, Reactor Engineer
L. Torres, Illinois Emergency Management Agency
Approved By:
Kenneth R. Riemer, Chief
Branch 1
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Clinton Power Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status URI 05000461/2019003-01 Unresolved Item Regarding the Primary Calibration of the Heating, Ventilation, and Air Conditioning Effluent Monitor Noble Gas Channel 71124.06 Open
PLANT STATUS
The unit operated at full achievable power (approximately 99 percent power) and approximately 1120 MWe for the majority of the inspection period. On August 3, 2019, the plant was automatically shut down on low reactor water level. The unit returned to full power on August 8, 2019. The unit was shut down on September 16, 2019, for Refueling Outage C1R19.
The unit remained in a shutdown condition through the end of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
External Flooding Sample (IP Section 03.04) (1 Sample)
- (1) The inspectors evaluated readiness to cope with external flooding for the following areas:
- dam inspection on July 15, 2019
71111.04Q - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)residual heat removal 'C' during lowered inventory conditions on September 17, 2019
- (2) Division 2 shutdown service water on September 19, 2019
- (3) Division 2 emergency diesel generator on September 19, 2019
71111.04S - Equipment Alignment
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the feedwater system on August 21, 2019.
71111.05A - Fire Protection (Annual)
Annual Inspection (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated fire brigade performance during the fire in the turbine building, elevation 762' on September 25, 2019.
71111.05Q - Fire Protection
Quarterly Inspection (IP Section 03.01) (4 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Fire Zone T-1a, turbine building basement, elevation 712-0 on July 5, 2019
- (2) Fire Zone D-6a/b, Division 2 diesel generator and day tank room, elevation 737-0 on July 12, 2019
- (3) Fire Zone CB-3E, Division 2 nuclear system protection system inverter room, elevation 781-0 on July 19, 2019
- (4) Fire Zones A-2n and A-4, Division 1 switchgear room and Division 1 battery room, elevation 781-0 on July 24, 2019
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in:
- (1) auxiliary electrical equipment room on September 3, 2019
71111.07A - Heat Sink Performance
Annual Review (IP Section 02.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) leakage past 1CC075A and 1CC076A impact to ultimate heat sink on August 14, 2019
71111.08G - Inservice Inspection Activities (BWR)
BWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding Activities (IP Section 03.01) (1 Partial)
(1)
(Partial)
The inspectors verified that the reactor coolant system boundary, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from September 23, 2019 to September 30, 2019:
03.01.a - Nondestructive Examination and Welding Activities.
1. Volumetric, ultrasonic, manual examination of reactor pressure vessel nozzle,
N10, inner radius welds for ASME category B-D located within the bio-shield of the containment drywell
2. Volumetric, ultrasonic, manual examination of reactor recirculation weld, 1-
RR-AC-1, for ASME category R-A located in the drywell 750 elevation
3. Volumetric, ultrasonic, manual examination of reactor pressure vessel head
meridional weld, CH-ME, at 255° for ASME category B-A located on the refueling floor
4. Volumetric, ultrasonic, manual examination of reactor pressure vessel head
meridional weld, CH-MF, at 315° for ASME category B-A located on the refueling floor
5. Surface, magnetic particle examination of one third of reactor pressure vessel
head-to-flange weld, CH-C-2 (1/3), for ASME category B-A located on the refueling floor
6. *IN-PROGRESS* pressure boundary weld(s) review
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during unit restart following SCRAM on August 5, 2019.
- (2) The inspectors observed and evaluated licensed operator performance in the control room during planned reactor shutdown for Refueling Outage C1R19 on September 15, 2019.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated Just-in-Time training to prepare for the upcoming outage on September 3, 2019.
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness Inspection (IP Section 02.01) (2 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
(1)electrohydraulic control system on September 3, 2019 (2)emergency core cooling ventilation system on August 29, 2019
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
(1)liquid discharge, elevated risk due to first liquid discharge in 27 years, Work Order
===4955690-13 (2)heavy lift over main turbine for outage mobilization on September 5, 2019 (3)planned Yellow risk for reactor core isolation cooling valve operability checks on September 6, 2019 (4)shutdown risk Yellow due to lowered inventory on September 17, 2019 (5)shutdown risk Yellow due to shutdown cooling on September 18, 2019 (6)shutdown risk Yellow due to electrical power work on September 19, 2019
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 02.02)===
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Action Request 4258762, #4 BPV [bypass valve] Stuck Full Open During 9072.10 on July 11, 2019
- (2) Action Request 4279700, SRM [source range monitor] B Failed Linear Response on September 18, 2019
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Engineering Change 624142, Slip-on Flange on 1RH19BB-4
- (2) Engineering Change 625821, Modify Unit Sub B for Reliable VC [control room heating, ventilation, and air conditioning] Load Shedding
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the following post maintenance tests:
(1)shutdown service water hydromotor 1SX019B rebuild post maintenance test on June 7, 2019 (2)reactor core isolation cooling water leg pump post maintenance testing on July 25, 2019 (3)source range monitor channel B post maintenance test on September 19, 2019
- (4) Division 3 shutdown cooling water pump post maintenance test on July 22, 2019
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)
(1)
(Partial)
The inspectors evaluated Refueling Outage C1R19 planning activities and outage activities from September 9 through October 31, 2019.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) Clinton Power Station (CPS) 9061.10, Fuel Pool Cooling Valve Operability, on July 26, 2019 (2)diesel generator operability - independent verification on September 15, 2019 (3)heatup/cooldown, inservice leak and hydrostatic 30 minute temperature log on September 16, 2019
- (4) CPS 9069.01, Shutdown Service Water Operability Test, on July 8, 2019
Containment Isolation Valve Testing (IP Section 03.01) (2 Samples)
(1)upper air lock barrel leak rate test on September 15, 2019
- (2) high pressure core spray injection valve local leak rate test on September 17, 2019
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
- Evaluation 18-45, Exelon Nuclear Standardized Radiological Emergency Plan, Revision 30
This evaluation does not constitute NRC approval.
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
- (1) Technical Support Center drill on August 13,
RADIATION SAFETY
71124.01 - Radiological Hazard Assessment and Exposure Controls
Radiological Hazard Assessment (IP Section 02.01) (1 Sample)
The inspectors evaluated radiological hazards assessments and controls.
- (1) The inspectors reviewed the following:
Radiological Surveys
- C1R19 Drywell 768 9/19/2019 through 9/26/2019
- C1R19 Refuel Floor 828 09/16/2019 through 09/22/2019
- C1R19 Drywell 755 09/19/2019 through 09/20/2019
Risk Significant Radiological Work Activities
- C1R19 Drywell Emergent Activities
- C1R19 Refuel Floor Activities (No Cavity Access)
- C1R19 Refuel Floor IVVI Activities
- C1R19 Drywell Bioshield ISI Activities
Air Sample Survey Records
- Sample 19-231; C1R19 Refuel Floor 09/16/2019 10:10
- Sample 19-240; C1R19 Refuel Floor Cavity 09/17/2019 00:40
- Sample 19-253; C1R19 Refuel Floor 09/18/2019 23:15
Instructions to Workers (IP Section 02.02) (1 Sample)
The inspectors evaluated instructions to workers including radiation work permits used to access high radiation areas.
- (1) The inspectors reviewed the following:
Radiation Work Packages
- CL-1-19-00543; C1R19 Drywell Emergent Work; Revision 3
- CL-1-19-00902; C1R19 Refuel Floor Activities (No Cavity Access); Revision 0
- CL-1-19-00903; C1R19 Refuel Floor Cavity Platform IVVI; Revision 0
Electronic Alarming Dosimeter Alarms
- Dosimeter Dose Rate Alarm 05/06/2018 01:23
- Dosimeter Dose Rate Alarm 05/07/2018 14:28
- Dosimeter Dose Rate Alarm 05/24/2018 04:39
- Dosimeter Dose Rate Alarm 06/21/2019 11:06
- Dosimeter Dose Rate Alarm 09/22/2019 02:52
Labeling of Containers
- Five refueling equipment containers on north side of containment refueling floor
Contamination and Radioactive Material Control (IP Section 02.03) (1 Sample)
The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.
- (1) The inspectors verified the following sealed sources are accounted for and are intact:
- Cs-137 Source Number 10187
- Cs-137 Source Number 9042
Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Sample)
The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.
- (1) There were no radiological work package for areas with airborne radioactivity available for review during the inspection.
High Radiation Area and Very High Radiation Area Controls (IP Section 02.05) (1 Sample)
- (1) The inspectors evaluated risk-significant high radiation area and very high radiation area controls.
Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 02.06) (1 Sample)
- (1) The inspectors evaluated radiation worker performance and radiation protection technician proficiency.
71124.02 - Occupational ALARA Planning and Controls
Implementation of ALARA and Radiological Work Controls (IP Section 02.03) (1 Sample)
The inspectors reviewed as low as reasonably achievable practices and radiological work controls.
- (1) The inspectors reviewed the following activities:
- CL-1-19-00543; C1R19 Drywell Emergent Work; Revision 3
- CL-1-19-00902; C1R19 Refuel Floor Activities (No Cavity Access); Revision 0
- CL-1-19-00903; C1R19 Refuel Floor Cavity Platform IVVI; Revision 0
Radiation Worker Performance (IP Section 02.04) (1 Sample)
The inspectors evaluated radiation worker and radiation protection technician performance during the following activities:
(1)
- CL-1-19-00543; C1R19 Drywell Emergent Work; Revision 3
- CL-1-19-00902; C1R19 Refuel Floor Activities (No Cavity Access); Revision 0
- CL-1-19-00903; C1R19 Refuel Floor Cavity Platform IVVI; Revision 0
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
Engineering Controls (IP Section 02.01) (1 Sample)
The inspectors evaluated airborne controls and radioactive monitoring.
- (1) The inspectors reviewed the following:
Installed Ventilation Systems
- Standby Gas Treatment System 0VG01SB at 719 Control Building
- Drywell Purge Trains 0VQ07FC at 702 Control Building
Temporary Ventilation System Setups
- There were none available for review during this inspection.
Portable or Installed Monitoring Systems
- Three Portable Ventilation Units Containing HEPA/Charcoal at Various Elevations inside the Drywell
Use of Respiratory Protection Devices (IP Section 02.02) (1 Sample)
The inspectors evaluated the licensees use of respiratory protection devices by:
- (1) Observing in-field applications; verifying the licensee validated the level of protection provided by the devices; inspecting the material condition of devices, reviewing records and certification of devices issued for use; reviewing the qualifications of workers that use the devices; and observing workers donning, doffing and testing devices.
Self-Contained Breathing Apparatus for Emergency Use (IP Section 02.03) (1 Sample)
The inspectors evaluated self-contained breathing apparatus program implementation.
- (1) The inspectors reviewed the following:
Status and Surveillance Records for Self-Contained Breathing Apparatus
- Ultra Elite MSA Firehawk PD-065
- Ultra Elite MSA Premier P-17
- Ultra Elite MSA Premier P-12
Self-Contained Breathing Apparatus Fit for On-Shift Operators
- MSA Firehawk PD-063; Operator 1
- MSA Firehawk PD-106; Operator 2
Self-Contained Breathing Apparatus Maintenance Check
- Ultra Elite MSA Firehawk P-123
- Ultra Elite MSA Firehawk P-7
71124.04 - Occupational Dose Assessment
Source Term Categorization (IP Section 02.01) (1 Sample)
- (1) The inspectors evaluated the licensees characterization of the source term and use of scaling factors for the use of hard-to-detect radionuclide activity.
External Dosimetry (IP Section 02.02) (1 Sample)
- (1) The inspectors evaluated the external dosimetry program implementation.
Internal Dosimetry (IP Section 02.03) (1 Sample)
The inspectors evaluated the internal dosimetry program implementation.
- (1) The inspectors reviewed the following:
Whole Body Counts
- Whole Body Count Intake Investigation 02/08/2019
- Whole Body Count Intake Investigation 10/19/2018
In-Vitro Internal Monitoring
- There were no In-Vitro Internal Monitoring Investigations during this inspection period.
Dose Assessments Performed Using Air Sampling and Derived Air Concentration-Hour Monitoring
- TEDE ALARA Evaluation Screening Worksheet for Reactor Disassembly-Reassembly; Reactor Cavity Entry-Reactor Head
Special Dosimetric Situations (IP Section 02.04) (1 Sample)
The inspectors evaluated the following special dosimetric situation:
- (1) Licensees implementation of requirements to manage radiation protection of declared pregnant workers for three workers, application of NRC-approved external dosimetry methods (i.e. EDEX), shallow dose equivalent and neutron dose assessments.
71124.06 - Radioactive Gaseous and Liquid Effluent Treatment
Walk Downs and Observations (IP Section 02.01) (1 Sample)
The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:
(1)
- Plant service water effluent
- HVAC effluent
- Liquid radioactive waste effluent Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
(1)
- Plant service water effluent monitor 1RIX-PR036 calibration; 02/21/2019
- Liquid radiation monitor sensitivities to I-131 and setpoint determination; 11/30/1999
- HVAC System Effluent Exhaust monitor PR001 calibration; 01/08/2019
Sampling and Analysis (IP Section 02.03) (1 Sample)
The inspectors reviewed the following:
- (1) Radioactive Effluent Sampling and Analysis Activities
- Offgas pretreatment effluent; 08/20/2019
Effluent Discharges
- There were none available for review during the inspection.
Instrumentation and Equipment (IP Section 02.04) (1 Sample)
The inspectors reviewed the following radioactive effluent discharge system surveillance test results:
- (1) Standby Gas Treatment System Train A tests 03/20/2018
Dose Calculations (IP Section 02.05) (1 Sample)
The inspectors reviewed the following to asses public dose:
- (1) Liquid and Gaseous Discharge Permits
- Gaseous continuous effluent permit 07/26/2019
- Gaseous continuous effluent permit 07/15/2019
Annual Radiological Effluent Release Reports
Abnormal Gaseous or Liquid Tank Discharges
- There were none available for review during this inspection.
71124.07 - Radiological Environmental Monitoring Program
Site Inspection (IP Section 02.01) (1 Sample)
The inspectors evaluated the radiological environmental monitoring program implementation.
- (1) The inspectors reviewed the following:
Walkdowns, Calibrations, and Maintenance Record Review
- Air Sampling Station CL-2
- Air Sampling Station CL-3
- Air Sampling Station CL-94
- Optically Stimulated Luminescent Dosimeter (OSLD) Monitoring Station CL-2
- OSLD Monitoring Station CL-3
- OSLD Monitoring Station CL-94
Environmental Sample Collections and Preparation Observation
- Sampling not available due to pre-determined sample scheduling that was contrary to onsite inspection time frame.
Licensee Actions in Response to Missed Sample, Inoperable Sampler, Lost TLD or Anomalous Measurement
- CL-115; Food Product; Insufficient Vegetation Collected; 07/25/2018
- CL-118; Food Product; Insufficient Vegetation Collected; 07/25/2018
- CL-114; Food Product; Insufficient Vegetation Collected; 08/29/2018
Sampling Program for the Potential of Licensed Material Entering Groundwater
- Monitoring Well MW-CL-13I
- Monitoring Well MW-CL-13S
- Monitoring Well MW-CL-14S
Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed licensee actions as a result of a 2006 onsite release of the Cycled Condensate System Tank.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===
- (1) Unit 1 (07/01/2018 - 06/30/2019)
MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)
- (1) Unit 1 (07/01/2018 - 06/30/2019)
MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)
- (1) Unit 1 (07/01/2018 - 06/30/2019)
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (1 Sample)
- (1) Unit 1 (09/5/2018 - 09/9/2019)
BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)
- (1) Unit 1 09/01/2018 - 06/01/2019
OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
(1)04/01/2018 - 06/30/2019
PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample.
(IP Section 02.16) (1 Sample)
(1)09/01/2018 - 06/01/2019
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Action Request 4221847, 1A Diesel Generator Fuel Priming Pump Motor Sparking
71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)
- (1) The inspectors evaluated an automatic reactor scram on low reactor water level and the licensees response on August 3, 2019.
Personnel Performance (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated an arc flash event and worker injury on September 11,
INSPECTION RESULTS
Unresolved Item (Open)
Unresolved Item Regarding the Primary Calibration of the Heating, Ventilation, and Air Conditioning Effluent Monitor Noble Gas Channel URI 05000461/2019003-01 71124.06
Description:
The licensee was unable at the time of the inspection to provide records of its primary calibration of the station heating, ventilation, and air conditioning exhaust effluent monitor 0RIX-PR001/2 for the high range noble gas channel.
Planned Closure Actions: Upon receipt of the licensees documentation, the agency will perform its review to determine if a performance deficiency occurred.
Licensee Actions: The licensee was performing a review of the effluent monitors primary calibration to locate the applicable records and information. Once complete, this will be forwarded to the Agency for its review.
Corrective Action References: Action Request 4282015
Observation: Review of Action Request 4221847, 1A Diesel Generator Fuel Priming Pump Motor Sparking 71152 During the inspection quarter, the inspectors reviewed the licensees corrective actions associated with Action Request 4221847, 1A Diesel Generator Fuel Priming Pump Motor Sparking. The inspectors assessed the following performance attributes in their review:
- complete and accurate identification of the problem in a timely manner commensurate with its safety significance and ease of discovery;
- consideration of the extent of condition, generic implications, common cause, and previous occurrences;
- evaluation and disposition of operability/functionality/reportability issues;
- classification and prioritization of the resolution of the problem commensurate with safety significance;
- identification of corrective actions, which were appropriately focused to correct the problem; and
- completion of corrective actions in a timely manner commensurate with the safety significance of the issue.
The inspectors selected this sample due to the potential impact to the operability of the associated diesel generator; a safety significant system. After further testing performed on the fuel priming pump, it was determined it would have been able to fulfill its safety function; therefore, the diesel generator remained operable. The inspectors review focused on whether the licensee had sufficient information prior to the fuel priming pump motor sparking to determine there was a degraded condition. There were indications of oil leaks in the area that had the potential to leak onto the pump but the corrective action documents that described these leaks did not specify whether an impact to the fuel priming pump was identified. Based on the information reviewed the inspectors concluded there was not a performance deficiency associated with this issue.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 11, 2019, the inspectors presented the integrated inspection results to Mr. T. Stoner, Site Vice President, and other members of the licensee staff.
- On August 22, 2019, the inspectors presented the Radiation Protection inspection results to Mr. G. Olsen - Maintenance Director and other members of the licensee staff.
- On September 27, 2019, the inspectors presented the Radiation Protection inspection results to Mr. T. Stoner, Site Vice President, and other members of the licensee staff.
- On October 3, 2019, the inspectors presented the Emergency Preparedness inspection results to Mr. L. Baker, EP Fleet Programs Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
EOID - Through Wall Leak Immediately Upstream of
1CB050A
07/26/2019
Drawings
Drawing M05-
1004
AH
Drawing M05-
1005
P&ID Condensate (CD)
AH
Drawing M05-
1006
P&ID Condensate Booster (CB)
P
Procedures
3103.01E001
Feedwater Electrical Lineup
13a
3103.01V001
Feedwater Valve Lineup
Corrective Action
Documents
Electrical Cable Fire at 762 Turbine Hallway
09/25/2019
Documentation of No-Call EAL for TB Fire per EP-AA-120
09/25/2019
Critique for Response to Fire at 762 TB on 09/25/2019
09/25/2019
Procedures
1893.04M720
2 Turbine: Turbine Auxiliaries Prefire Plan
6c
71111.05Q Corrective Action
Documents
9071.13 FP CO2 Sys Auto Actuation (Div 2 DG)
06/09/2019
Procedures
1893.04M512
737 Diesel Generator: Div 2 Diesel Generator & Day Tank
Room Prefire Plan
7b
1893.04M700
2 Turbine: Basement Prefire Plan
6b
Fire Prevention for Hot Work
Work Orders
Hot Tap Line Per EC to Improve Water Delivery During
Outage
08/30/2019
Procedures
1893.04M351
781 Control: Aux. Elect. Equip., Inverter & Battery Rooms
Prefire Plan
7d
CPS 4304.01
Flooding
6c
Corrective Action
Documents
Unexpected CCW Tank Level Increase During 1RIX-PR004
09/18/2017
1CC075A and 1CC076A Leaking By
04/24/2018
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
NRC Question on Last Performance of 9861.09D006
04/25/2018
9861.09 & Data Sheets - SX Boundary Leak Test Proc.
Changes
05/20/2018
CCP Procedures 9861.09D006/7 Cannot Be Performed as
Written
06/21/2019
9861.09D0006 Exceeds Admin Limit
07/17/2019
Leakage Table Parameters Wrong in 9861.09
08/01/2019
Corrective Action
Documents
Resulting from
Inspection
NRC IDd Error in SX Boundary Leakage Procedure
Pressures
08/01/2019
Engineering
Changes
Maximum Flow from 3/4 SX Hose Test Connection
9861.09 & Data Sheets - SX Boundary Leak Test Proc.
Changes Supporting Information
Evaluate Leakage from UHS for Valves 1CC075A and
1CC076A
Miscellaneous
Design Analysis
IP-M-0563
Determination of Allowable Leak Rates and Loss of UHS
Volume from Shutdown Service Water (SX) Boundary
Valves
2/13/2012
Procedures
CPS 9861.09
Shutdown Service Water Boundary Valve Leak Testing
9861.09D006
Leakage Test on Valve 1CC075A and 1CC076A
2a
71111.08G Corrective Action
Documents
4134785
Low Thickness Readings Discovered on B RHR Min Flow
Piping
05/05/2018
4135345
Erosion on 1E12F018B Valve Internals
05/07/2018
4136024
Need RHR B Alternate Valves
05/09/2018
Corrective Action
Documents
Resulting from
Inspection
282058
Revision of GEH-UT-300 is Required
09/25/2019
282747
NRC ISI: Wear Rate Methodology in EC 624182
09/27/2019
283049
NRC ID Questions on Work Order 1230601-01/39
09/28/2019
283637
Follow-Up to IR 4283049, Questions on Work Order 230601
09/30/2019
NDE Reports
Examination Summary Sheet
09/23/2019
Examination Summary Sheet
09/23/2019
Examination Summary Sheet
09/25/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Magnetic Particle Examination
09/23/2019
UT Calibration/Examination
09/26/2019
Procedures
Magnetic Particle Examination
Erosion in Piping and Components (EPC) Guide
GEH-PDI-UT-1
PDI Generic Procedure for the Ultrasonic Examination of
Ferritic Welds
GEH-UT-300
Procedure for Manual Examination of Reactor Vessel
Assembly Welds in Accordance with PDI
WPS 1-1-GTSM-
ASME Welding Procedure Specification Record
Corrective Action
Documents
Found Fuses Blown for Fast Open Acting Solenoids
05/20/2018
(A)(1) Determination for MR Function LAS-2-FUEL-02
11/08/2018
GE MK II EHC Circuit Cards Are Now Obsolete
01/29/2019
BPV #1 Fast Acting Solenoid Did Not Energize During
9072.01
06/15/2019
BPV #3 Fast Acting Solenoid Did Not Energize During
9072.01
06/22/2019
Miscellaneous
(a)(1) Action Plan Development and Action Plan (Monitoring)
Goal Setting Template
Work Orders
Replace Fast Opening Solenoid Valve - 1C85F013
10/09/2013
Replace Fast Opening Solenoid Valve - 1C85F022
10/10/2013
Procedures
CPS 9054.02
Reactor Core Isolation Cooling Valve Operability Checks
43c
HU-AA-1211-F-01
Briefing Topic Supplemental Form
Rigging and Lifting Program
WC-AA-104-F-01
Risk Screening/Mitigation Plan
Work Orders
Pre-Outage Mobilization & Demobilization Turbine Deck
08/28/2019
9054.02A20 OP RCIC Valve Operability (D001)
08/01/2019
Ops Perform a Liquid Radioactive Discharge
09/10/2019
Corrective Action
Documents
AR 289539289539Provisions for Liquid Tight Jacket Repair
01/11/2005
BPV #1 Fast Acting Solenoid did not Energize During
9072.01
06/15/2019
Fast Acting Fuse Blew While Testing BPV 1
06/20/2019
- 4 BPV Stuck Full Open During 9072.01
06/22/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
BPV #3 Fast Acting Solenoid did not Energize During
9072.01
06/22/2019
SBV #1 FAS Plunger Stuck
07/03/2019
Bypass Valve 1C85F0012: Leaking Steam by Seat
07/05/2019
9072.01 Steam Bypass Valve Tests Surveillance Has Gone
Late
07/07/2019
SRM B Failed Linear Response
09/13/2019
Procedures
CPS 9072.01
Steam Bypass Valve Tests
34d
Corrective Action
Documents
Low Thickness Readings Discovered on B RHR Min Flow
Piping
05/05/2018
APS As Found: 1E12D001B Replacement Not Like for Like
05/07/2018
NOS ID: Issues with UFSAR Changes Related to Design
Changes
07/17/2019
Drawings
Drawing M05-
1075
P&ID Residual Heat Removal (RH)
Engineering
Changes
Slip-On Flange on 1RH19BB-4
Work Orders
When Required, Replace Eroded RHR B Pump Min Flow
Line
05/13/2018
Work Orders
29176
SRM B
1SX019B Parts Issues with Linear Converter Rebuild
06/04/2019
1SX019B Parts Issues with Linear Converter Rebuild
06/04/2019
1SX019B Parts Issues with Linear Converter Rebuild
06/06/2019
EM 1SX019B: Re-Install Hydramotor Following MMD Work
06/06/2019
Perform Detector Testing After Replacement
09/16/2019
Procedures
C1R19 Master
(Fall 2019)
Master Work Activity List
09/10/2019
SSMP Final
C1R19 Shutdown Safety Management Program
Corrective Action
Documents
2017 PMMR Created Incorrectly
05/01/2019
Miscellaneous
CL-SURV-012
Clinton PRA Application Notebook; Risk Assessment Missed
Surveillance - Upper Containment Air Lock Barrel; IR
243061
Procedures
CPS 1305.01
Primary Containment Leakage Rate Testing Program
2c
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1305.01F002
Type C Local Leak Rate Summary Sheet
9000.06D001
Heatup/Cooldown, Inservice Leak and Hydrostatic 30 Minute
Temperature Log
30b
CPS 9080.10
DG Operability - Independent Verification
30c
CPS 9843.01
IST Category A Valve Leak Rate Test
36c
9843.01V005
Leak Rate Testing of HPCS Injection
27d
9861.03D001
Upper Air Lock Barrel Leak Rate Test
21d
Risk Assessments of Missed or Deficient Surveillances
Work Orders
MC003G01 LLRT: 1MC-03W CT Upper Air Lock Barrel
11/19/2013
9059.01R20 LRT Vessel Pressure Test
05/13/2018
MC003G01 LLRT: 1MC-03W CT Upper Air Lock Barrel
09/15/2019
9843.01 10 LRT Cat A VLV LRT (1E22-F004) HPCS INJ
09/17/2019
Miscellaneous
Evaluation 18-45
Exelon Nuclear Standardized Radiological Emergency Plan
2/14/2019
Corrective Action
Documents
RPID: Dose Rate Alarm
05/02/2018
RPID: High Beta Dose Rates on Source U-080
2/07/2018
RPID: Elevated Dose Rates on Pipe in 737 AB
06/26/2019
RPID: Rad surv HU Improvement Opportunity
07/17/2019
RPID: Potential Weakness in Rad surv Security
07/20/2019
Miscellaneous
ED Dose and Dose Rate Alarm Logs 01/01/2018 through
09/23/2019
Weekly Locked High Radiation Area Checklist
09/13/2019
Nation Source Tracking System Annual Reconciliation
01/06/2019
L80526
Dry Active Waste 10 CFR 61 Analysis
2/01/2018
Procedures
Controls for High and Locked High Radiation Areas
Radiation
Surveys
Radioactive Source Leak Test
06/20/2019
2019-053210
C1R19 BRAC Point Radiological Surveys
09/23/2019
Self-Assessments AR 4200413
Pre NRC Inspection 71124.01 Radiological Hazards
Assessment and Exposure Controls
03/28/2019
NOSA-CPS-17-06 Radiation Protection Audit Report
07/18/2017
ALARA Plans
CL-1-18-00901
Disassembly and Reassembly/Cavity Lift Installation Post
05/23/2018
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Job Review
CL-1-18-00902
RFF Activities/Cavity Lift Installation Post Job Review
05/09/2018
CL-1-19-00543
C1R19 Drywell Emergent Work
CL-1-19-00902
C1R19 Refuel Floor Activities (No Cavity Access)
CL-1-19-00903
C1R19 Refuel Floor Cavity Platform IVVI
Corrective Action
Documents
RPID: Lack of Rigor in ALARA Planning
10/30/2018
RPID: Potential C1R19 Dose savings
09/10/2019
RPID: ALARA Plan Under 25% original estimate
09/11/2019
Miscellaneous
C1R19 Station Alara Committee Meeting Notes
09/25/2019
C1R18 RP/ALARA Refueling Outage Report
Calculations
RWP 1900901
Evaluation
Screening
Worksheet
C1R19 FF RX Disassembly/Reassembly Activities
08/20/2019
Calibration
Records
0VG015B
Standby Gas Treatment System Charcoal Absorber B Test
2/14/18
0VG08FA
Standby Gas Treatment System Charcoal Adsorber A
03/20/2018
0VQ01SC
Drywell Purge Filter Train C Absorber and HEPA Filter Test
05/11/2017
Corrective Action
Documents
Incorrect Redon Protocol Selected During Respirator Fit
Test
07/17/2018
Miscellaneous
Posi3 USB Test
Results
0Y244871
MSA Ultralite Complete SCBA Test
08/16/2019
Posi3 USB Test
Results 0Y33112
MSA Ultralite Complete SCBA Test
08/16/2019
Calculations
RWP 1900622
Evaluation
Screening
Worksheet
C1R18 AB/CT Insulation Activities ECCS Insulation
Removal HEPA or Wet
09/28/2018
RWP 1900903
Evaluation
screening
C1R19 Cavity Platform IVVI and Associated Activities
08/20/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Worksheet
Calibration
Records
Multiple Dosimetry EDE Evaluation Sheet
09/19/2019
Miscellaneous
NISP-RP-006
Personnel Contamination Event Log on PCE #3
09/21/2019
Inc.
Scope of Accreditation to ISO/IEC 17025:2005 NVLAP Code
100518-0
01/01/2019
Multiple Dosimetry Issue Log Single Entry on a GE Hitachi
Personnel
09/27/2019
Declaration of Pregnancy Paperwork from 04/24/2017
through 05/10/2019
Calibration
Records
HVAC System Exhaust PRM CC (PR001)
01/08/2019
SGST Flow Monitor 0FT-VG001
11/27/2018
Main Stack Flow Mon 0FT-VR500
2/25/2019
Calibration of Liquid PRM 1RIX-PR036
2/20/2019
Corrective Action
Documents
ODCM: Chem Unable to Obtain VR/VQ Sample due to
Equipment Issue
05/01/2018
Missed ODCM NG and Tritium Sample due to Equipment
Malfunction
2/14/2019
IRIX-PR036 Comp, Grab Sample Analysis Missed
2/21/2019
Miscellaneous
2018 Annual Land Use Census Evaluation and Summary
10/10/2018
2017 Annual Radioactive Effluent Release Report;
04/23/2018
2018 Annual Radioactive Effluent Release Report;
04/25/2019
Offgas Pre-Treatment Gamma Spectroscopy Analysis
08/20/2019
Procedures
CY-CL-6949-01
Off-gas Pre Treatment Sampling and Analysis
CY-CL-6954-01
HVAC Stack Effluent Noble Gas and Tritium
CY-CL-6954-02
HVAC Stack Effluent - Iodine and Particulates
Self-Assessments AR 04203312
NRC Inspection: Radioactive Gaseous and Liquid Effluent
Treatment
06/28/2019
Work Orders
01930276-04
Standby Gas Treatment Train A Charcoal/Heater/HEPA
Testing
03/20/2018
Calibration
Records
Serial Number
3K620000007433
Field Rotameter Calibration
2/05/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Serial Number
3K620000007433
Field Rotameter Calibration
05/06/2019
Corrective Action
Documents
ODCM Air Samplers CL-7, CL-8, CL-15 & CL-94 Timer
Shortages
2/14/2018
ODCM Environmental Area TLDS CL-35 Missing
03/07/2018
ODCM: Air Samplers CL-3, CL-4 and CL-6 Timer Shortages 04/11/2018
ODCM Water Compositor Cl-91 Sample Line or Header
Clogged
04/18/2018
REMP: Weekly Air Particulate and Iodine Cartridges
Missing
08/10/2018
Miscellaneous
Annual Radiological Environmental Operating Report;
January 01, 2018 - December 31, 2018
04/25/2019
2018 Annual Land Use Census Evaluation and Summary
10/18/2018
Monthly Report on the Meteorological Monitoring Program at
the Clinton Power Station February 2018
04/11/2018
Monthly Report on the Meteorological Monitoring Program at
the Clinton Power Station August 2018
10/22/2018
Monthly Report on the Meteorological Monitoring Program at
the Clinton Power Station February 2019
04/15/2019
Procedures
Environmental Dosimetry - Performance Specifications,
Testing, and Data Analysis
Self-Assessments AR 4203308
NRC Inspection: Radioactive Effluent Monitoring Program
06/28/2019
Corrective Action
Documents
Arc Flash Event
09/11/2019