IR 05000461/2022402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000461/2022402
ML22339A232
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/06/2022
From: Steven Orth
NRC/RGN-III/DRSS/SEPIR
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022402
Download: ML22339A232 (1)


Text

SUBJECT:

CLINTON POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000461/2022402

Dear Mr. David Rhoades:

On November 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station and discussed the results of this inspection with Mr. T. Chalmers, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Security Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000461 License No. NPF-62

Enclosure:

As stated

Inspection Report

Docket Number:

05000461

License Number:

NPF-62

Report Number:

05000461/2022402

Enterprise Identifier:

I-2022-402-0015

Licensee:

Constellation Nuclear

Facility:

Clinton Power Station

Location:

Clinton, IL

Inspection Dates:

October 03, 2022 to November 30, 2022

Inspectors:

E. Bonano, Physical Security Inspector

J. Kutlesa, Emergency Preparedness Inspector

Approved By:

Steven K. Orth, Chief

Security Emergency Preparedness

and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Clinton Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All

Tier II: 02.06 (a-d); 02.07 (a); 02.08 (a,b,e)

Tier III: 02.09

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program.

The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All

Tier II: All Tier III: 02.15 (a,b)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan (PSP) change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP and PSP Revision 21 remains current.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) October 2019 through October

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 30, 2022, the inspectors presented the security baseline inspection results to Mr. T. Chalmers, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Resulting from

Inspection

AR 04534357

NRC Observation of Warehouse Enhancement

11/02/2022

Miscellaneous

AR 04436676

Pre-NRC Security Inspection 71130.02 & 71151

10/03/2022 -

10/07/2022

SY-AA-101-106

Control and Classification of Safeguards Information (SGI)

and Sensitive Unclassified Non-Safeguards Information

(SUNSI)

SY-AA-101-112

Exelon Security Search Processes

SY-AA-101-112-

1004

Protected Area Search Process

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

SY-AA-101-120

Control of Security Access Control Devices

SY-AA-101-130

Security Responsibilities for Station Personnel

SY-AA-103-514

Site Authorization for Unescorted Access

71130.02

Procedures

SY-CL-101-119

OCA Warehouse Search Activities

Corrective Action

Documents

Resulting from

Inspection

AR 04534639

NRC Observation Regarding Attention to Detail

11/03/2022

Engineering

Changes

EC 636095

CPS Metal Detector Replacement

N/A

Security Baseline Inspection UPS Questions

11/22/2022

Miscellaneous

SY-AA-150-103-

F-01

Record of Semi-Annual Functionality and Accuracy Tests

and Maintenance Log (57 Weapons)

01/2021 -

11/2022

SY-AA-101-122

Testing Security Equipment

SY-AA-150-103

Firearms Maintenance, Testing and Accountability

71130.04

Procedures

SY-CL-101-122

Clinton Site Specific Equipment Testing

71130.09

Miscellaneous

N/A

Clinton Power Station Security Plan

71151

Miscellaneous

N/A

IRIS-INPO (NRC PI Database)

10/2019 -

10/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

LS-AA-2001

Collecting and Reporting of NRC ROP Performance Indicator

Data

17