ML17272A396

From kanterella
Revision as of 11:50, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Deficiency Reported by 790319 Telcon,Re Defective Terminal Lugs on Electrical Containment Penetrations X-105 A,B,C & D
ML17272A396
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/17/1979
From: RENBERGER D L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: ENGELKEN R H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17272A397 List:
References
GO2-79-68, NUDOCS 7904270375
Download: ML17272A396 (4)


Text

RE(ATORY INFORMATION DISTRIB ON SYSTEM (RIDS)ACCESSION NBR07904270375 DOC~DATE~79/04/17 NOTARIZED'O DOCKET N FACILe 50~397 WPPSS NUCI EAR PROJECT~UNIT 2g WASHINGTON PUBLIC POWE" 05000397 AUTH BYNAME AUTHOR AFFILIATION RENBERGERPD

~LE WASHINGTON PUBLIC POWER SUPPLY SYSTEM RECIP~NAME RECIPIENT AFFILIATION ENGELKENPR

~H~REGION 5g SAN FRANCISCO'" OFFICE'F'THE DIRECTOR SUBJECTS FORWARDS REPORTABLE DEFICIENCY AS REP(fRTED BY,790319 TELCONE RE DEFECTIVE TERMINAL LUGS ON ELECTRICAL CONTAINMENT PENETRATIONS X 105 Ag Bg C&'D>>DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR

NCLIZE: 'ITLE: CONSTRUCTION DEFICIENCY REPORT'IOCFR50,555), NOTES;+I<<PBFdg OE~L~<E~AIN7 5s AIL(/PPAITl RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/bLAME~

LTTR ENCL'CTION:

10 PM/n c,gnlCH 1 1 15 BC<~<~4 1 1'20 LA amR W<1 1 21 AD URSA'Hzco 1 1 INTERNAL: 0 05 08 MPA 10 QAB 12 JORDAN 5 E/IE 16 AD FOR ENGR 17 AD REAC SFTY 22 DIR DPM EXTERNAL: 03 LPDR 20 ACRS 1 1 16 16 ,1 1 02 NRC PDR 1 1'2'" 07 EDO 5 STAFF 1'1 1 09 DEPY DIR DPM 1 1 1 1 11 STANDRDS DEV 1 1 1 1 13FIELD COOR/IE 1 1 1 1 17 AD PLANT SYS 1 1 1 1 19 AD SYS/PROJ 1 1 1 1 23 OELD 1 1 00 NSIC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 39 ENCL39 Spy f9' 0 I H v<I (h t i E V 4 M'll bV p Washington Public Power Supply System A JOINT OPERATING AGENCY p.o.Box 968 3000 Qco.wAsHi~oro~

w*r Ric~cA~o.w~sHi~oroN 993s2 p~oNc (509)375 sooo April 17, 1979 G02-79-68 Nuclear Regulatory Commission Region V Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 N.California Boulevard Walnut Creek, California 94596 Attention:

Mr.R.H.Engelken, Director

Subject:

WPPSS NUCLFAR PROJECT NO.2 DOCKFT NUMBER 50-397, CPPR-93 REPORTABLE DEFICIENCY

.10CFR50.55 e

Dear Hr.Engelken:

In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on March 19, 1979, of a reportable deficiency involvinq defect-ive termination lugs on Electrical Containment Penetrations X-105 A, B, C, and D.Attached is our report on this deficiency, Ple'ase contact us if you have any additional questions.

Very truly yours, DLR/DCT/1 n

Attachment:

As stated D.L.RENBERGER Assistant Director Technol ogy cc w/att: C Bryant-BPA JJ Verderber-BSR JG Davis-Director of Inspection 8 Enforcement, NRC, Washington, D.C.HNP-2 Files V904270 370 l'I K