ML17277A566

From kanterella
Revision as of 05:31, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Vol 4 to Wppss Nuclear Project 2 Preservice Insp Program Plan,Summary Rept, Documenting Completion of Approx 98% of Volumetric & Surface Exams,Repairs & Replacements & Including Request for Relief PSI-2-001
ML17277A566
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/03/1983
From: BOUCHEY G D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: SCHWENCER A
Office of Nuclear Reactor Regulation
Shared Package
ML17277A567 List:
References
GO2-83-401, NUDOCS 8305050159
Download: ML17277A566 (6)


Text

/=~i RKGULIAiTOR

.FOR4lATION OIISTRZBUT,IONi S~M, (RIDS)i ACCESSIOiVi iVBR: 830505015i9 DOCI.OATEI:

83/05/03>>NOITIARZZEOI:

iVOi DOCKEIT'.~FACiILi:50 397>>rtPPSS Vucil cari.P'r oil ect i Uni ti 2i~Washington Pub 1-i c>>Powe 05000397>>AUTH NAi<IKI AU'THOR, AFFIILII AIT ION BOUCHEiY.G>>.

0..rlashinaton<

Pgb lii c<Power Suool.v Svs tern RECKPi.VA>>4IKt RKCIIPiiKNiJI AFFiILIIATIONt SCH'rlENCER.A.

'li censina Bt ahch 2" tip (W SUBJKCITi:

Fo,rwairds Vbili 4!toi"riPPSS, Nucilea'r;ProiJecti2.'ir eser vice Irl'so>>~Pr oar tatii Pilent5um~arV Reoti" documentirial comoletion oifi 8'oor ox'8'/r o.fr.voilumatr'.i c<%surface exatiis'i r eoeti'rs>8 r co<la'ceiiients<

L inciludina Reauesti foir Relii ef>>PSI~2.001,.'iISTRIBUTCout COOKli 8001S COP<KB PKCKIVEO'.L'ITR.

i I KIVCLI~: SIZEti C,: TiITLEI: Lticensi'na Submi tteili'PSAR/FSAR Atridts-L Reilelted Cozresponde'nce-NOiTES'KCII Pii F NiTI IDi COOEI/iV ALKI iVRR/DLv'ADLI NRR LI32: LIAI COP%F5 LITITR.ENCLI 1>>0 1.0 RKCII PiIKN TI IOI COOEi/NAMKI NRR LB2 BCI AULUCK i R'o'1>>" COP IKS LITTR EiVCLI 1 Oi 1.1 IN TKRNAI.I: KLO/HDS2'Ei/DEPKR/KPBI 36 I Ki/DKQAi/QABt 21.>>VRR'/DK>>/CEB(11>>iVRR/Di'/KQBI 13>>NRR/DE'/HGKBi 30 NRR/DK'/ATEBt 17>>NRR/DE>>/SGEBt 25(NRR/DHFS/LQBt 32;NRR/03ii/AEB(2'b NRR/DSiI/CPBt 10 NRR/08tI/ICSBi 1 b NRR/08ii/PSBi 19 NRR/08iI/RSBt 23>>RGN5<ir 3>>1>>1<2.1>>1.2.ir ir 1>>1>>1>>1r 3 IKI FiILEI I Ki/DEPER/I<lBi 35r NRR/DK</AKABt NRR/OE</KHEBI NRR/OEI/GB>>

28'VRR/OEi/NKBt 18'RR/DK'/SABi.

2A'VRR/DHFS/HFEBtt0 NRR/DLI/SSPBt NRR/OS I/ASSI NRR/DSI/CSBt 09 NRR/OS I/iilKITBI 12: NRR/'22vl FiIL 04'I/'cli18i 1 1.1.1>>2 1-1<<1>>1.1.1 1 1 1 1 1 Ot EXTERNALI:

ACRS 4'1 r DNB/OSS (AUDITS)" LPOR 03<iVSI Cl 05i 6 1r 1<ir BNLI(Ab10ITSi ONLIY3" FK>>RA.REPi DIIVI 39 NRCI POR.02", iVT IS 1 1 1.1 TOiTALI NUMBER OFi'DPiIKi8 RKQUIRKb':

I.ITTR 54 ENCLI CP ct k th ftk r Pt K~K FK E I l f+It KK I f Nr'4 Nr f Iffy'F,~FIF f K f" f (I ht 1 q NCr Ih grilk'I a N F Iif IU k f kl f IF e lKK K IF Ih I<Kf., f f F'l f I I='I, H~I.K.,~f ki U II Xb)'U FU F I I lh kL 4 JF IFFIF kk f K r XII 4 II XIth'bk.I'kt't hh S)l~)[ir'Ik)l I 1 kl I kl I It KP lhl I Kr 8 IFF II N>>'-II Ct, F I f 0/r Washington Public Power Supply System P.O.Box 968 3000George Washington Way Richland, Washington 99352 (509)372-5000 May 3, 1983 G02-83-401 Director of Nuclear Reactor Regulation Attention:

Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.Schwencer:

Subject:

NUCLEAR PROJECT NO.2, CPPR-93, PRESERVICE INSPECTION PROGRAM PLAN, VOLUME NO.4,"PRESERVICE INSPECTION

SUMMARY

REPORT"

References:

a)G02-79-54, dated March 28, 1979 b)G02-79-89, dated May 9, 1979 c)G02-80-311, dated December 31, 1980 d)G02-81-565, dated December 30, 1981 The Washington Public Power Supply System herewith submits five (5)copies of the Preservice Inspection Summary Report designated Volume 4 of the Preservice Inspection Program Plan.Five (5)copies of the Program Plan and Amendments 1, 2 and 3 were originally submitted to you via the refer-enced letters.The Summary Report documents the=-Supply System's completion of approxi-mately 98%of the volumetric and surface examinations committed to in the Preservice Inspection Program Plan.Also submitted as part of the Summary Report are 23, NIS-2 Owner's Report of Repair or Replacement forms for repairs or replacements completed to March 31, 1983.In addition to documenting the volumetric and surface examinations and repairs and replacements, the Summary Report includes Request for Relief PSI-2-001.

This section of the report documents all areas the Supply Sys-tem found that could not be fully examined to the ASME Section XI Code.The Request for Relief contains only a few welds, all of which received a partial code examination.

It is anticipated that no additional welds will be added to this request for relief.I goo'ls 8305050i59 830503 PDR ADDCK 05000397[0 PDR (g If f Mr.A.Schwencer, NRC Page Two A supplement to this Summary Report will be submitted within 90 days after commercial operation.

This supplement will contain a summary of the results of the remaining surface, visual and volumetric examinations.

Also contained in this supplement will be NIS-2 Owner's Reports for all repairs and replacements completed from March 31, 1983 to commercial operations and the NIS-1 Owner's Data Report for the Preservice Inspec-tion.Very truly yours, G.D.Bouchey, 340 Manager, Nuclear Safety and Regulatory Programs GDB:DPR:st Attachment cc: R.Auluck, NRC, w/o M.S.Chin, BPA, w/o R.H.Engelken, NRC ROY, w/a M.R.Humm, NRC, w/o A.Toth, NRC Site, w/o 0'P Cj l