ML17285B286

From kanterella
Revision as of 21:10, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991
ML17285B286
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/22/1990
From: SORENSEN G C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-094, GO2-90-94, NUDOCS 9005300131
Download: ML17285B286 (3)


Text

~ACCELERATED D TRJBUTION DEMONS TlON SYSTEM'4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9005300131 DOC.DATE: 90/05/22 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit, 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that submittal of ITS scheduled for Mar 1991 6 implementation tenatively scheduled for Oct 1991.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR g ENCL~SIZE: TITLE: OR Submittal:

General Distribution NOTES DOCKET 477 05000397 RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS NRR/DOEA/OTSBll NRR/DST/SELB 8D NRR/DST/SRXB 8E OC FJ()!B G FILE 0 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 RECIPIENT ID CODE/NAME PD5 PD NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (B)CL 2C079)TO ELIMINATE YOUR NAME FROM DISI'R(BUT(ON LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Hay 22, 1990 G02-90-094 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

NUCLEAR PLANT NO.2, OPERATING LICENSE NPF-21 SCHEDULE FOR IMPLEMENTING THE IMPROVED TECHNICAL SPECIFICATION (ITS)PROGRAM

Reference:

Letter, G02-89-223, GC Sorensen (SS)to NRC, same subject dated December 14, 1989 The reference letter informed the Staff that the Supply System had commenced a plant specific effort to develop an Improved Technical Specification (ITS)for WNP-2 based on standards developed by the Boiling Water Reactor Owners Group and the NRC Interim Policy Statement on Technical Specification Improvements.

Tentative submittal was scheduled for September 1990.Subsequent review of Industry/NRC review schedules on the lead plant ITS submittals has caused a revision of this schedule such that the WNP-2 ITS submittal is now scheduled for March 1991 with implementation tentatively scheduled for October 1991.Very truly yours, G.C.$rensen, Hanager Regulatory Programs PLP/bk cc: JB Hartin-NRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A D Hoffman-EXCEL 9O05300iSi 05000397 900522 ()PPP ADOCK pDC P

~s