Forwards Control Room Design Review, Final Rept,Suppl 1. Rept Documents Completion of Final Validation Step of Control Room Design Review Program Plan & Satisfies Commitment Made in Util
ML20107G622
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/02/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20107G625 List:
References
NUDOCS 8411080170
Download: ML20107G622 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ - . _ _

PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 JOHN S. KEMPER

-.. :.7:."::"':L.. NOV 21984 Mr. A. Schwencer, Chief Docket Nos.: 50-352 Licensing Branch No. 2 50-353 U. S. Nuclear Regulatory Ccnmission Washington, D.C. 20555

Subject:

Limerick Generating Station, Units 1 and 2 Limerick Control Room Design Review Final Report, Supplement 1

References:

1) Letter, J. S. Kemper to A. Schwencer dated June 25, 1984
2) Letter, J. S. Kemper to A. Schwencer dated August 16, 1984 File: GOVT 1-1 (NRC)

Dear Mr. Schwencer:

Attached is a copy of the Limerick Control Room Design Review (CRDR) Final Report, Supplement 1. As discussed in the reference 1 letter, this supplemental report docunents the completion of the f!nal validation step of the Limerick CRDR Program Plan, and its submittal satifies the conmitment mado in the reference 2 letter.

Submittal of this supplemental report also constitutes partial satisfaction of item 2 of Attachment 4 to Facility Operating License NPF-27, Limerick Generating Station Unit 1. This item will be completely satisfied when all Priority 1 hunan engineering discrepancies (HED's) have been corrected. The reference 2 letter discussed two Priority 1 HED's: HED Al-13 " Annunciator Silence Button" and HED S!4-04 " Testability of Renote Shutdown Panel Indicating Status Lights." HED Al-13 was corrected prior to fuel load. As required by the IIcense, correction of HED S!4-04 will be completed prior to operation of the plant at a power level greater than five percent of rated power. We will Inform you of its completion by letter.

l 0 Sincerely, 84 1 % O 0 00 F gg2 ffg DFC/mib/10308401 Enclosure cc: See Attached Service List 3 I (

. ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~

F/

cc: Judge Helen F.'Hoyt (w/ enclosure)

Judge derry Harbour (w/ enclosure)

Judge Richard F. Cole _ _(w/ enclosure)

Judge Christine N. Kohl (w/ enclosure)

Judge-Gary J. Edles (w/ enclosure)

Judgc-Reginald L. Gotchy (w/ enclosure)

Troy B. Conner, Jr., Esq. (w/ enclosure)

Ann P.'Hodgdon, Esq. (w/ enclosure)

Mr. Frank R. Romano (w/ enclosure)

Mr.~ Robert L. Anthony

~

(w/ enclosure)

Ms.'Phyllis ZItzer (w/ enclosure)

Charles W. E11 tot, Esq. . (w/ enclosure)

Zort G. Forkin,.Esq. (w/ enclosure)

Mr. Thomas Gerusky (w/ enclosure)

Director, Penna. Emergency (w/ enclosure)

Management Agency Angus R. Love, Esq. (w/ enclosure)

David Wersan, Esq. (w/ enclosure)

Robert J. Sugarmen, Esq. (w/ enclosure)

Martha W. Bush, Esq. (w/ enclosure)

Spence W. Perry, Esq. (w/ enclosure)

Jay M. Gutierrez, Esq. (w/ enclosure)

Atomic Safety & Licensing (w/ enclosure)

Appeal Board Atomic- Safet.y & Licensing (w/ enclosure)

Board Ranel Docket & Service Section (w/ enclosure)

Mr. James Wiggins (w/ enclosure) g Mr. Timothy R. S. Campbell (w/ enclosure) y 7 t

J 4

'I.

4

(=

i t

6 \

h.

1.s t

(

f

_ _ _ _ _ _ . %m. _J