ML20107G622

From kanterella
Jump to navigation Jump to search
Forwards Control Room Design Review, Final Rept,Suppl 1. Rept Documents Completion of Final Validation Step of Control Room Design Review Program Plan & Satisfies Commitment Made in Util
ML20107G622
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/02/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20107G625 List:
References
NUDOCS 8411080170
Download: ML20107G622 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ - . _ _

PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 JOHN S. KEMPER

-.. :.7:."::"':L.. NOV 21984 Mr. A. Schwencer, Chief Docket Nos.: 50-352 Licensing Branch No. 2 50-353 U. S. Nuclear Regulatory Ccnmission Washington, D.C. 20555

Subject:

Limerick Generating Station, Units 1 and 2 Limerick Control Room Design Review Final Report, Supplement 1

References:

1) Letter, J. S. Kemper to A. Schwencer dated June 25, 1984
2) Letter, J. S. Kemper to A. Schwencer dated August 16, 1984 File: GOVT 1-1 (NRC)

Dear Mr. Schwencer:

Attached is a copy of the Limerick Control Room Design Review (CRDR) Final Report, Supplement 1. As discussed in the reference 1 letter, this supplemental report docunents the completion of the f!nal validation step of the Limerick CRDR Program Plan, and its submittal satifies the conmitment mado in the reference 2 letter.

Submittal of this supplemental report also constitutes partial satisfaction of item 2 of Attachment 4 to Facility Operating License NPF-27, Limerick Generating Station Unit 1. This item will be completely satisfied when all Priority 1 hunan engineering discrepancies (HED's) have been corrected. The reference 2 letter discussed two Priority 1 HED's: HED Al-13 " Annunciator Silence Button" and HED S!4-04 " Testability of Renote Shutdown Panel Indicating Status Lights." HED Al-13 was corrected prior to fuel load. As required by the IIcense, correction of HED S!4-04 will be completed prior to operation of the plant at a power level greater than five percent of rated power. We will Inform you of its completion by letter.

l 0 Sincerely, 84 1 % O 0 00 F gg2 ffg DFC/mib/10308401 Enclosure cc: See Attached Service List 3 I (

. ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~

F/

cc: Judge Helen F.'Hoyt (w/ enclosure)

Judge derry Harbour (w/ enclosure)

Judge Richard F. Cole _ _(w/ enclosure)

Judge Christine N. Kohl (w/ enclosure)

Judge-Gary J. Edles (w/ enclosure)

Judgc-Reginald L. Gotchy (w/ enclosure)

Troy B. Conner, Jr., Esq. (w/ enclosure)

Ann P.'Hodgdon, Esq. (w/ enclosure)

Mr. Frank R. Romano (w/ enclosure)

Mr.~ Robert L. Anthony

~

(w/ enclosure)

Ms.'Phyllis ZItzer (w/ enclosure)

Charles W. E11 tot, Esq. . (w/ enclosure)

Zort G. Forkin,.Esq. (w/ enclosure)

Mr. Thomas Gerusky (w/ enclosure)

Director, Penna. Emergency (w/ enclosure)

Management Agency Angus R. Love, Esq. (w/ enclosure)

David Wersan, Esq. (w/ enclosure)

Robert J. Sugarmen, Esq. (w/ enclosure)

Martha W. Bush, Esq. (w/ enclosure)

Spence W. Perry, Esq. (w/ enclosure)

Jay M. Gutierrez, Esq. (w/ enclosure)

Atomic Safety & Licensing (w/ enclosure)

Appeal Board Atomic- Safet.y & Licensing (w/ enclosure)

Board Ranel Docket & Service Section (w/ enclosure)

Mr. James Wiggins (w/ enclosure) g Mr. Timothy R. S. Campbell (w/ enclosure) y 7 t

J 4

'I.

4

(=

i t

6 \

h.

1.s t

(

f

_ _ _ _ _ _ . %m. _J