ML20127M254

From kanterella
Revision as of 02:53, 22 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests That NPDES Permit PA0051926 Be Amended to Reflect Change in Discharge Rate Re Continuous Overflow of Perkiomen Creek Water
ML20127M254
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/19/1993
From: Morley G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Garg S
PENNSYLVANIA, COMMONWEALTH OF
References
NUDOCS 9301280156
Download: ML20127M254 (1)


Text

_ _._ _ _ _ _._

_ _ _ . _ _ _ _ _ _ _ _ _ _ _ s

.~

P111LADELPIIIA ELECTRIC COMPANY i i 2301 MARKET STREET ,

P. O, BOX 8699  :

PHILADELPHIA, PA 19101 (215) 841 4000 January 19, 1993 Mr. Sohan L. Garg Department of Environmental Resources-Suite 6010, Lee Park S5E North Lane ,

Conshohocken, PA 19428 i

Re Limerick Generating Station NPDES Permit No. PA0051926

Dear Mr. Garg:

As per your recent telephone convercation with Bob Matty, of my staff, this letter._is being sent to correct information on the Perkiomen Storage Tank overflow discharge to Possum Hollow Run. In a letter dated October 6, 1992, we requested that the subject permit be amtended to allow a continuous overflow of Perkiomen Creek water to discharge to Possum Hollow Run-(outfall 020) as.a method of freeze protection for the Perkiomen Storage Tank. The discharge-rate from the tank to fossum Hollow Run was reported-as 200 gpm. It has been brought to our attention that the discharge rate is actually 450 gpm. Note, protective measures are in place to insure that no erosion of-the stream banko and bed takeo place, (W per your approval letter, 11/17/92). In your '

conversation with-Mr.-Matty, you indicated that the increased discharge rate should not be a problem. Please amend the subject permit to reflect this change in the discharge rate.

A copy of this letter (ir.cluding any attachments or enclosures) is-being sent to the U.S. Nuclear Regulatory Commission (USNRC)-in accordance with the ,

Limerick Generating Station, Units 1 and 2, Environmental Protection Plan, section 3.2, which stipulates that USNRC shall receive a copy of any proposed changes to the NPDES permit at the same time that the permitting agency is >

notified.

If you have any questions or'requirn additional information, please contact Robert M. Matty, Jr. at_(215) 841-5177. t sincerely, f

' George M. Morley f

Manager 250154 Environmental Affairs cc '

. Nucle'ar Regulatory Commission, Document Control Desk

- (Decket Nos. 50-352-and 50-353 & License Nos. NPF-39 and NPF-85)

LT4 - T. Martin, Administrator, USNRC, Region 1 ..

T. J. Kenny, USNRC-Senior Resident Inspector, LGS' I

D 9301280156 930119 PDR /'-

P ADDCK 05000352 pop.

( l

. - _ . . . _ _ _ _ _ . . _ . . _ _ . ._-._ _.,_._..,_.m _ _ _ _